Loading…
Criterions and Measures of Route Selection of Shallowly Embedded Long.Distance Oil and Gas Pipeline in Mountain Areas
According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route sh...
Saved in:
Published in: | Wuhan University journal of natural sciences 2006, Vol.11 (4), p.787-792 |
---|---|
Main Author: | |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 792 |
container_issue | 4 |
container_start_page | 787 |
container_title | Wuhan University journal of natural sciences |
container_volume | 11 |
creator | WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen |
description | According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment. |
format | article |
fullrecord | <record><control><sourceid>chongqing</sourceid><recordid>TN_cdi_chongqing_backfile_22434482</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><cqvip_id>22434482</cqvip_id><sourcerecordid>22434482</sourcerecordid><originalsourceid>FETCH-chongqing_backfile_224344823</originalsourceid><addsrcrecordid>eNqNjc2KwjAUhYMo-PsOl9l3SNOKZjl0_FmMKOpeYntrr2YSbVIG394o8wCuzsfh45wW68VSJlEq5bQdmPNJFAsuuqzv3JnzRI4ncY81WU0ea7LGgTIFrFC5pkYHtoStbTzCDjXmPgjPalcpre2fvsPs94hFgQX8WHP6_CbnlckR1qRfOwvlYENX1GQQyMDKNsarAF91eBiyTqm0w9F_DtjHfLbPllFehbUbmdPhqPJLSRoPQqRJmk5F8pb0AIrxTBk</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Criterions and Measures of Route Selection of Shallowly Embedded Long.Distance Oil and Gas Pipeline in Mountain Areas</title><source>Springer Nature - Connect here FIRST to enable access</source><creator>WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen</creator><creatorcontrib>WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen</creatorcontrib><description>According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.</description><identifier>ISSN: 1007-1202</identifier><identifier>EISSN: 1993-4998</identifier><language>eng</language><subject>地质灾害 ; 油气管 ; 长输管道</subject><ispartof>Wuhan University journal of natural sciences, 2006, Vol.11 (4), p.787-792</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Uhttp://image.cqvip.com/vip1000/qk/85480X/85480X.jpg</thumbnail><link.rule.ids>314,778,782,4012</link.rule.ids></links><search><creatorcontrib>WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen</creatorcontrib><title>Criterions and Measures of Route Selection of Shallowly Embedded Long.Distance Oil and Gas Pipeline in Mountain Areas</title><title>Wuhan University journal of natural sciences</title><addtitle>Wuhan University Journal of Natural Sciences</addtitle><description>According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.</description><subject>地质灾害</subject><subject>油气管</subject><subject>长输管道</subject><issn>1007-1202</issn><issn>1993-4998</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2006</creationdate><recordtype>article</recordtype><recordid>eNqNjc2KwjAUhYMo-PsOl9l3SNOKZjl0_FmMKOpeYntrr2YSbVIG394o8wCuzsfh45wW68VSJlEq5bQdmPNJFAsuuqzv3JnzRI4ncY81WU0ea7LGgTIFrFC5pkYHtoStbTzCDjXmPgjPalcpre2fvsPs94hFgQX8WHP6_CbnlckR1qRfOwvlYENX1GQQyMDKNsarAF91eBiyTqm0w9F_DtjHfLbPllFehbUbmdPhqPJLSRoPQqRJmk5F8pb0AIrxTBk</recordid><startdate>2006</startdate><enddate>2006</enddate><creator>WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen</creator><scope>2RA</scope><scope>92L</scope><scope>CQIGP</scope><scope>W94</scope><scope>~WA</scope></search><sort><creationdate>2006</creationdate><title>Criterions and Measures of Route Selection of Shallowly Embedded Long.Distance Oil and Gas Pipeline in Mountain Areas</title><author>WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-chongqing_backfile_224344823</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2006</creationdate><topic>地质灾害</topic><topic>油气管</topic><topic>长输管道</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen</creatorcontrib><collection>维普_期刊</collection><collection>中文科技期刊数据库-CALIS站点</collection><collection>中文科技期刊数据库-7.0平台</collection><collection>中文科技期刊数据库-自然科学</collection><collection>中文科技期刊数据库- 镜像站点</collection><jtitle>Wuhan University journal of natural sciences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>WANG Chenghua MA Qingwen KONG Jiming CHEN Zefu LI Xiuzhen</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Criterions and Measures of Route Selection of Shallowly Embedded Long.Distance Oil and Gas Pipeline in Mountain Areas</atitle><jtitle>Wuhan University journal of natural sciences</jtitle><addtitle>Wuhan University Journal of Natural Sciences</addtitle><date>2006</date><risdate>2006</risdate><volume>11</volume><issue>4</issue><spage>787</spage><epage>792</epage><pages>787-792</pages><issn>1007-1202</issn><eissn>1993-4998</eissn><abstract>According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choice when the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope. Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline along the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.</abstract></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1007-1202 |
ispartof | Wuhan University journal of natural sciences, 2006, Vol.11 (4), p.787-792 |
issn | 1007-1202 1993-4998 |
language | eng |
recordid | cdi_chongqing_backfile_22434482 |
source | Springer Nature - Connect here FIRST to enable access |
subjects | 地质灾害 油气管 长输管道 |
title | Criterions and Measures of Route Selection of Shallowly Embedded Long.Distance Oil and Gas Pipeline in Mountain Areas |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T04%3A43%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-chongqing&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Criterions%20and%20Measures%20of%20Route%20Selection%20of%20Shallowly%20Embedded%20Long.Distance%20Oil%20and%20Gas%20Pipeline%20in%20Mountain%20Areas&rft.jtitle=Wuhan%20University%20journal%20of%20natural%20sciences&rft.au=WANG%20Chenghua%20MA%20Qingwen%20KONG%20Jiming%20CHEN%20Zefu%20LI%20Xiuzhen&rft.date=2006&rft.volume=11&rft.issue=4&rft.spage=787&rft.epage=792&rft.pages=787-792&rft.issn=1007-1202&rft.eissn=1993-4998&rft_id=info:doi/&rft_dat=%3Cchongqing%3E22434482%3C/chongqing%3E%3Cgrp_id%3Ecdi_FETCH-chongqing_backfile_224344823%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_cqvip_id=22434482&rfr_iscdi=true |