Loading…

The First Benchmarking of ITER BR Nb3Sn Strand of CNDA

According to the International Thermonuclear Experimental Reactor (ITER) Pro- curement Arrangement (PA) of Cable-In-Conduit Conductor (CICC) unit lengths for the Toroidal Field (TF) and Poloidal Field (PF) magnet systems of ITER, at the start of process qualification, the Domestic Agency (DA) shall...

Full description

Saved in:
Bibliographic Details
Published in:等离子体科学和技术:英文版 2012-09, Vol.14 (9), p.847-849
Main Author: 龙风 刘方 武玉 倪志鹏
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 849
container_issue 9
container_start_page 847
container_title 等离子体科学和技术:英文版
container_volume 14
creator 龙风 刘方 武玉 倪志鹏
description According to the International Thermonuclear Experimental Reactor (ITER) Pro- curement Arrangement (PA) of Cable-In-Conduit Conductor (CICC) unit lengths for the Toroidal Field (TF) and Poloidal Field (PF) magnet systems of ITER, at the start of process qualification, the Domestic Agency (DA) shall be required to conduct a benchmarking of the room and low tem- perature acceptance tests carried out at the Strand Suppliers and/or at its Reference Laboratories designated by the ITER Organization (IO). The first benchmarking was carried out successfully in 2009. Nineteen participants from six DAs (China, European Union, Japan, South Korea, Russia, and the United States) participated in the first benchmarking. Bronze-route (BR) Nb3Sn strand and samples prepared by the ITER reference lab (CERN) were sent out to each participant by CERN. In this paper, the test facility and test results of the first benchmarking by the Chinese DA (CNDA) are presented.
doi_str_mv 10.1088/1009-0630/14/9/14
format article
fullrecord <record><control><sourceid>chongqing</sourceid><recordid>TN_cdi_chongqing_primary_43434526</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><cqvip_id>43434526</cqvip_id><sourcerecordid>43434526</sourcerecordid><originalsourceid>FETCH-LOGICAL-c111t-bf574ec6122751013d55ed92daa7c8e35af488109a69e97426a8d00bdc8236333</originalsourceid><addsrcrecordid>eNo9jstOwzAURL0AiVL6AezMB4Tc62s79rINLVSqWqkN68qxnSY8Ukiy4e8JAqGRZqSzGB3GbhHuEYxJEcAmoAlSlKkd64JN_tkVu-77FwAlraEJ00Ud-arp-oEvYuvrd9e9Nu2Jnyu-LpZ7vtjzbUmHlh-GzrXhh-fbh_kNu6zcWx9nfztlz6tlkT8lm93jOp9vEo-IQ1JWKpPRaxQiUwhIQakYrAjOZd5EUq6SxiBYp220mRTamQBQBm8EaSKasrvfX1-f29PnaHb86JpR8usoaYwSmr4BQrdBrQ</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>The First Benchmarking of ITER BR Nb3Sn Strand of CNDA</title><source>Institute of Physics</source><creator>龙风 刘方 武玉 倪志鹏</creator><creatorcontrib>龙风 刘方 武玉 倪志鹏</creatorcontrib><description>According to the International Thermonuclear Experimental Reactor (ITER) Pro- curement Arrangement (PA) of Cable-In-Conduit Conductor (CICC) unit lengths for the Toroidal Field (TF) and Poloidal Field (PF) magnet systems of ITER, at the start of process qualification, the Domestic Agency (DA) shall be required to conduct a benchmarking of the room and low tem- perature acceptance tests carried out at the Strand Suppliers and/or at its Reference Laboratories designated by the ITER Organization (IO). The first benchmarking was carried out successfully in 2009. Nineteen participants from six DAs (China, European Union, Japan, South Korea, Russia, and the United States) participated in the first benchmarking. Bronze-route (BR) Nb3Sn strand and samples prepared by the ITER reference lab (CERN) were sent out to each participant by CERN. In this paper, the test facility and test results of the first benchmarking by the Chinese DA (CNDA) are presented.</description><identifier>ISSN: 1009-0630</identifier><identifier>DOI: 10.1088/1009-0630/14/9/14</identifier><language>eng</language><subject>ITER ; Nb3Sn ; 国际热核实验反应堆 ; 国际热核实验堆 ; 标杆 ; 欧洲核子研究中心 ; 链</subject><ispartof>等离子体科学和技术:英文版, 2012-09, Vol.14 (9), p.847-849</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Uhttp://image.cqvip.com/vip1000/qk/84262X/84262X.jpg</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>龙风 刘方 武玉 倪志鹏</creatorcontrib><title>The First Benchmarking of ITER BR Nb3Sn Strand of CNDA</title><title>等离子体科学和技术:英文版</title><addtitle>Plasma Science & Technology</addtitle><description>According to the International Thermonuclear Experimental Reactor (ITER) Pro- curement Arrangement (PA) of Cable-In-Conduit Conductor (CICC) unit lengths for the Toroidal Field (TF) and Poloidal Field (PF) magnet systems of ITER, at the start of process qualification, the Domestic Agency (DA) shall be required to conduct a benchmarking of the room and low tem- perature acceptance tests carried out at the Strand Suppliers and/or at its Reference Laboratories designated by the ITER Organization (IO). The first benchmarking was carried out successfully in 2009. Nineteen participants from six DAs (China, European Union, Japan, South Korea, Russia, and the United States) participated in the first benchmarking. Bronze-route (BR) Nb3Sn strand and samples prepared by the ITER reference lab (CERN) were sent out to each participant by CERN. In this paper, the test facility and test results of the first benchmarking by the Chinese DA (CNDA) are presented.</description><subject>ITER</subject><subject>Nb3Sn</subject><subject>国际热核实验反应堆</subject><subject>国际热核实验堆</subject><subject>标杆</subject><subject>欧洲核子研究中心</subject><subject>链</subject><issn>1009-0630</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2012</creationdate><recordtype>article</recordtype><recordid>eNo9jstOwzAURL0AiVL6AezMB4Tc62s79rINLVSqWqkN68qxnSY8Ukiy4e8JAqGRZqSzGB3GbhHuEYxJEcAmoAlSlKkd64JN_tkVu-77FwAlraEJ00Ud-arp-oEvYuvrd9e9Nu2Jnyu-LpZ7vtjzbUmHlh-GzrXhh-fbh_kNu6zcWx9nfztlz6tlkT8lm93jOp9vEo-IQ1JWKpPRaxQiUwhIQakYrAjOZd5EUq6SxiBYp220mRTamQBQBm8EaSKasrvfX1-f29PnaHb86JpR8usoaYwSmr4BQrdBrQ</recordid><startdate>20120901</startdate><enddate>20120901</enddate><creator>龙风 刘方 武玉 倪志鹏</creator><scope>2RA</scope><scope>92L</scope><scope>CQIGP</scope><scope>W92</scope><scope>~WA</scope></search><sort><creationdate>20120901</creationdate><title>The First Benchmarking of ITER BR Nb3Sn Strand of CNDA</title><author>龙风 刘方 武玉 倪志鹏</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c111t-bf574ec6122751013d55ed92daa7c8e35af488109a69e97426a8d00bdc8236333</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2012</creationdate><topic>ITER</topic><topic>Nb3Sn</topic><topic>国际热核实验反应堆</topic><topic>国际热核实验堆</topic><topic>标杆</topic><topic>欧洲核子研究中心</topic><topic>链</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>龙风 刘方 武玉 倪志鹏</creatorcontrib><collection>中文科技期刊数据库</collection><collection>中文科技期刊数据库-CALIS站点</collection><collection>中文科技期刊数据库-7.0平台</collection><collection>中文科技期刊数据库-工程技术</collection><collection>中文科技期刊数据库- 镜像站点</collection><jtitle>等离子体科学和技术:英文版</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>龙风 刘方 武玉 倪志鹏</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The First Benchmarking of ITER BR Nb3Sn Strand of CNDA</atitle><jtitle>等离子体科学和技术:英文版</jtitle><addtitle>Plasma Science & Technology</addtitle><date>2012-09-01</date><risdate>2012</risdate><volume>14</volume><issue>9</issue><spage>847</spage><epage>849</epage><pages>847-849</pages><issn>1009-0630</issn><abstract>According to the International Thermonuclear Experimental Reactor (ITER) Pro- curement Arrangement (PA) of Cable-In-Conduit Conductor (CICC) unit lengths for the Toroidal Field (TF) and Poloidal Field (PF) magnet systems of ITER, at the start of process qualification, the Domestic Agency (DA) shall be required to conduct a benchmarking of the room and low tem- perature acceptance tests carried out at the Strand Suppliers and/or at its Reference Laboratories designated by the ITER Organization (IO). The first benchmarking was carried out successfully in 2009. Nineteen participants from six DAs (China, European Union, Japan, South Korea, Russia, and the United States) participated in the first benchmarking. Bronze-route (BR) Nb3Sn strand and samples prepared by the ITER reference lab (CERN) were sent out to each participant by CERN. In this paper, the test facility and test results of the first benchmarking by the Chinese DA (CNDA) are presented.</abstract><doi>10.1088/1009-0630/14/9/14</doi><tpages>3</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1009-0630
ispartof 等离子体科学和技术:英文版, 2012-09, Vol.14 (9), p.847-849
issn 1009-0630
language eng
recordid cdi_chongqing_primary_43434526
source Institute of Physics
subjects ITER
Nb3Sn
国际热核实验反应堆
国际热核实验堆
标杆
欧洲核子研究中心

title The First Benchmarking of ITER BR Nb3Sn Strand of CNDA
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T23%3A58%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-chongqing&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20First%20Benchmarking%20of%20ITER%20BR%20Nb3Sn%20Strand%20of%20CNDA&rft.jtitle=%E7%AD%89%E7%A6%BB%E5%AD%90%E4%BD%93%E7%A7%91%E5%AD%A6%E5%92%8C%E6%8A%80%E6%9C%AF%EF%BC%9A%E8%8B%B1%E6%96%87%E7%89%88&rft.au=%E9%BE%99%E9%A3%8E%20%E5%88%98%E6%96%B9%20%E6%AD%A6%E7%8E%89%20%E5%80%AA%E5%BF%97%E9%B9%8F&rft.date=2012-09-01&rft.volume=14&rft.issue=9&rft.spage=847&rft.epage=849&rft.pages=847-849&rft.issn=1009-0630&rft_id=info:doi/10.1088/1009-0630/14/9/14&rft_dat=%3Cchongqing%3E43434526%3C/chongqing%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c111t-bf574ec6122751013d55ed92daa7c8e35af488109a69e97426a8d00bdc8236333%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_cqvip_id=43434526&rfr_iscdi=true