Loading…

Electro-Pulse-Boring (EPB): Novel Super-Deep Drilling Technology for Low Cost Electricity

The inexhaustible heat deposit in great depths (5-10 km) is a scientific fact. Such deposit occurs around the globe. Thereby, everybody is enabled to generate autonomously clean and renewable energy, ample electricity and heat. The economical exploration and exploitation of this superdeep geothermal...

Full description

Saved in:
Bibliographic Details
Published in:地球科学学刊:英文版 2015 (1), p.37-46
Main Author: Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 46
container_issue 1
container_start_page 37
container_title 地球科学学刊:英文版
container_volume
creator Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen
description The inexhaustible heat deposit in great depths (5-10 km) is a scientific fact. Such deposit occurs around the globe. Thereby, everybody is enabled to generate autonomously clean and renewable energy, ample electricity and heat. The economical exploration and exploitation of this superdeep geothermal heat deposit requires a novel drilling technique, because the currently only deep drilling method (Rotary) is limited to about 5 km, due to the rising costs, depending exponentially on depth. Electro-pulse-boring (EPB) is a valuable option to Rotary drilling. EPB, originally investigated in Russia, is ready to be developed for industrialization. The feasibility of EPB is proven by many boreholes drilled up to 200 m in granite (crystalline). Estimates show outstanding low costs for drilling by EPB: 100 E/m for a borehole with a large diameter (φ) such as 20 (50 cm), independent on depth and applicable likewise for sediments and crystalline rocks, such as granite. The current rate of penetration (ROP) of 3 m per hour is planned to be augmented up to 35 m per hour, and again, irrespective whether in sedimentary or crystalline formations. Consequently, a 10 km deep borehole with φ 50 cm will ultimately be drilled within 12 days. EPB will create new markets, such as: (i) EPB shallow drilling for geotechnics, energy piles, measures in order to mitigate natural hazards, etc., (ii) EPB deep drilling (3-5 km) for hydro-geothermics, exploration campaigns etc. and (iii) EPB super-deep drilling (5-10 km) for petro-geothermies, enabling the economic generation of electricity. The autonomous and unlimited supply with cost efficient electricity, besides ample heat, ensures reliably clean and renew- able energy, thus, high supply security. Such development will provide a substantial relief to cope with the global challenge to limit the climate change below 2 ℃. The diminution of fossil fuels, due to the energy transition in order to mitigate the climate change, implies likewise the decrease of air pollution.
format article
fullrecord <record><control><sourceid>chongqing</sourceid><recordid>TN_cdi_chongqing_primary_663918387</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><cqvip_id>663918387</cqvip_id><sourcerecordid>663918387</sourcerecordid><originalsourceid>FETCH-chongqing_primary_6639183873</originalsourceid><addsrcrecordid>eNpjYuA0tDAz1zU0NIxgAbLNzE10TSzMIzgYeIuLswyAwNjI3MLQnJMh3jUnNbmkKF83oDSnOFXXKb8oMy9d4f2eDtcAp_d7Ot_vmaXgl1-WmqMQXFqQWqTrkppaoOBSlJmTA1IWkpqckZefk59eqZCWX6Tgk1-u4JxfXKIAMTMzObOkkoeBNS0RaDIvlOZmUHJzDXH20E3OyM9LLwSaEl9QlJmbWFQZb2ZmbGloYWxhbkyUIgB9uUiO</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Electro-Pulse-Boring (EPB): Novel Super-Deep Drilling Technology for Low Cost Electricity</title><source>Springer Nature</source><creator>Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen</creator><creatorcontrib>Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen</creatorcontrib><description>The inexhaustible heat deposit in great depths (5-10 km) is a scientific fact. Such deposit occurs around the globe. Thereby, everybody is enabled to generate autonomously clean and renewable energy, ample electricity and heat. The economical exploration and exploitation of this superdeep geothermal heat deposit requires a novel drilling technique, because the currently only deep drilling method (Rotary) is limited to about 5 km, due to the rising costs, depending exponentially on depth. Electro-pulse-boring (EPB) is a valuable option to Rotary drilling. EPB, originally investigated in Russia, is ready to be developed for industrialization. The feasibility of EPB is proven by many boreholes drilled up to 200 m in granite (crystalline). Estimates show outstanding low costs for drilling by EPB: 100 E/m for a borehole with a large diameter (φ) such as 20 (50 cm), independent on depth and applicable likewise for sediments and crystalline rocks, such as granite. The current rate of penetration (ROP) of 3 m per hour is planned to be augmented up to 35 m per hour, and again, irrespective whether in sedimentary or crystalline formations. Consequently, a 10 km deep borehole with φ 50 cm will ultimately be drilled within 12 days. EPB will create new markets, such as: (i) EPB shallow drilling for geotechnics, energy piles, measures in order to mitigate natural hazards, etc., (ii) EPB deep drilling (3-5 km) for hydro-geothermics, exploration campaigns etc. and (iii) EPB super-deep drilling (5-10 km) for petro-geothermies, enabling the economic generation of electricity. The autonomous and unlimited supply with cost efficient electricity, besides ample heat, ensures reliably clean and renew- able energy, thus, high supply security. Such development will provide a substantial relief to cope with the global challenge to limit the climate change below 2 ℃. The diminution of fossil fuels, due to the energy transition in order to mitigate the climate change, implies likewise the decrease of air pollution.</description><identifier>ISSN: 1674-487X</identifier><identifier>EISSN: 1867-111X</identifier><language>eng</language><subject>低成本 ; 可再生能源 ; 地热勘探 ; 电力 ; 电脉冲 ; 超深钻 ; 钻井技术 ; 钻孔直径</subject><ispartof>地球科学学刊:英文版, 2015 (1), p.37-46</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Uhttp://image.cqvip.com/vip1000/qk/84134A/84134A.jpg</thumbnail><link.rule.ids>314,780,784,4024</link.rule.ids></links><search><creatorcontrib>Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen</creatorcontrib><title>Electro-Pulse-Boring (EPB): Novel Super-Deep Drilling Technology for Low Cost Electricity</title><title>地球科学学刊:英文版</title><addtitle>JOURNAL OF EARTH SCIENCE</addtitle><description>The inexhaustible heat deposit in great depths (5-10 km) is a scientific fact. Such deposit occurs around the globe. Thereby, everybody is enabled to generate autonomously clean and renewable energy, ample electricity and heat. The economical exploration and exploitation of this superdeep geothermal heat deposit requires a novel drilling technique, because the currently only deep drilling method (Rotary) is limited to about 5 km, due to the rising costs, depending exponentially on depth. Electro-pulse-boring (EPB) is a valuable option to Rotary drilling. EPB, originally investigated in Russia, is ready to be developed for industrialization. The feasibility of EPB is proven by many boreholes drilled up to 200 m in granite (crystalline). Estimates show outstanding low costs for drilling by EPB: 100 E/m for a borehole with a large diameter (φ) such as 20 (50 cm), independent on depth and applicable likewise for sediments and crystalline rocks, such as granite. The current rate of penetration (ROP) of 3 m per hour is planned to be augmented up to 35 m per hour, and again, irrespective whether in sedimentary or crystalline formations. Consequently, a 10 km deep borehole with φ 50 cm will ultimately be drilled within 12 days. EPB will create new markets, such as: (i) EPB shallow drilling for geotechnics, energy piles, measures in order to mitigate natural hazards, etc., (ii) EPB deep drilling (3-5 km) for hydro-geothermics, exploration campaigns etc. and (iii) EPB super-deep drilling (5-10 km) for petro-geothermies, enabling the economic generation of electricity. The autonomous and unlimited supply with cost efficient electricity, besides ample heat, ensures reliably clean and renew- able energy, thus, high supply security. Such development will provide a substantial relief to cope with the global challenge to limit the climate change below 2 ℃. The diminution of fossil fuels, due to the energy transition in order to mitigate the climate change, implies likewise the decrease of air pollution.</description><subject>低成本</subject><subject>可再生能源</subject><subject>地热勘探</subject><subject>电力</subject><subject>电脉冲</subject><subject>超深钻</subject><subject>钻井技术</subject><subject>钻孔直径</subject><issn>1674-487X</issn><issn>1867-111X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNpjYuA0tDAz1zU0NIxgAbLNzE10TSzMIzgYeIuLswyAwNjI3MLQnJMh3jUnNbmkKF83oDSnOFXXKb8oMy9d4f2eDtcAp_d7Ot_vmaXgl1-WmqMQXFqQWqTrkppaoOBSlJmTA1IWkpqckZefk59eqZCWX6Tgk1-u4JxfXKIAMTMzObOkkoeBNS0RaDIvlOZmUHJzDXH20E3OyM9LLwSaEl9QlJmbWFQZb2ZmbGloYWxhbkyUIgB9uUiO</recordid><startdate>2015</startdate><enddate>2015</enddate><creator>Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen</creator><scope>2RA</scope><scope>92L</scope><scope>CQIGP</scope><scope>W94</scope><scope>~WA</scope></search><sort><creationdate>2015</creationdate><title>Electro-Pulse-Boring (EPB): Novel Super-Deep Drilling Technology for Low Cost Electricity</title><author>Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-chongqing_primary_6639183873</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>低成本</topic><topic>可再生能源</topic><topic>地热勘探</topic><topic>电力</topic><topic>电脉冲</topic><topic>超深钻</topic><topic>钻井技术</topic><topic>钻孔直径</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen</creatorcontrib><collection>维普_期刊</collection><collection>中文科技期刊数据库-CALIS站点</collection><collection>维普中文期刊数据库</collection><collection>中文科技期刊数据库-自然科学</collection><collection>中文科技期刊数据库- 镜像站点</collection><jtitle>地球科学学刊:英文版</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Hans O. Schiegg Arild Rodland Guizhi Zhu David A. Yuen</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Electro-Pulse-Boring (EPB): Novel Super-Deep Drilling Technology for Low Cost Electricity</atitle><jtitle>地球科学学刊:英文版</jtitle><addtitle>JOURNAL OF EARTH SCIENCE</addtitle><date>2015</date><risdate>2015</risdate><issue>1</issue><spage>37</spage><epage>46</epage><pages>37-46</pages><issn>1674-487X</issn><eissn>1867-111X</eissn><abstract>The inexhaustible heat deposit in great depths (5-10 km) is a scientific fact. Such deposit occurs around the globe. Thereby, everybody is enabled to generate autonomously clean and renewable energy, ample electricity and heat. The economical exploration and exploitation of this superdeep geothermal heat deposit requires a novel drilling technique, because the currently only deep drilling method (Rotary) is limited to about 5 km, due to the rising costs, depending exponentially on depth. Electro-pulse-boring (EPB) is a valuable option to Rotary drilling. EPB, originally investigated in Russia, is ready to be developed for industrialization. The feasibility of EPB is proven by many boreholes drilled up to 200 m in granite (crystalline). Estimates show outstanding low costs for drilling by EPB: 100 E/m for a borehole with a large diameter (φ) such as 20 (50 cm), independent on depth and applicable likewise for sediments and crystalline rocks, such as granite. The current rate of penetration (ROP) of 3 m per hour is planned to be augmented up to 35 m per hour, and again, irrespective whether in sedimentary or crystalline formations. Consequently, a 10 km deep borehole with φ 50 cm will ultimately be drilled within 12 days. EPB will create new markets, such as: (i) EPB shallow drilling for geotechnics, energy piles, measures in order to mitigate natural hazards, etc., (ii) EPB deep drilling (3-5 km) for hydro-geothermics, exploration campaigns etc. and (iii) EPB super-deep drilling (5-10 km) for petro-geothermies, enabling the economic generation of electricity. The autonomous and unlimited supply with cost efficient electricity, besides ample heat, ensures reliably clean and renew- able energy, thus, high supply security. Such development will provide a substantial relief to cope with the global challenge to limit the climate change below 2 ℃. The diminution of fossil fuels, due to the energy transition in order to mitigate the climate change, implies likewise the decrease of air pollution.</abstract></addata></record>
fulltext fulltext
identifier ISSN: 1674-487X
ispartof 地球科学学刊:英文版, 2015 (1), p.37-46
issn 1674-487X
1867-111X
language eng
recordid cdi_chongqing_primary_663918387
source Springer Nature
subjects 低成本
可再生能源
地热勘探
电力
电脉冲
超深钻
钻井技术
钻孔直径
title Electro-Pulse-Boring (EPB): Novel Super-Deep Drilling Technology for Low Cost Electricity
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T12%3A30%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-chongqing&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Electro-Pulse-Boring%20%EF%BC%88EPB%EF%BC%89%EF%BC%9A%20Novel%20Super-Deep%20Drilling%20Technology%20for%20Low%20Cost%20Electricity&rft.jtitle=%E5%9C%B0%E7%90%83%E7%A7%91%E5%AD%A6%E5%AD%A6%E5%88%8A%EF%BC%9A%E8%8B%B1%E6%96%87%E7%89%88&rft.au=Hans%20O.%20Schiegg%20Arild%20Rodland%20Guizhi%20Zhu%20David%20A.%20Yuen&rft.date=2015&rft.issue=1&rft.spage=37&rft.epage=46&rft.pages=37-46&rft.issn=1674-487X&rft.eissn=1867-111X&rft_id=info:doi/&rft_dat=%3Cchongqing%3E663918387%3C/chongqing%3E%3Cgrp_id%3Ecdi_FETCH-chongqing_primary_6639183873%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_cqvip_id=663918387&rfr_iscdi=true