Operation track record and repair of direct electrical heating system
Direct electrical heating is a flow assurance method for subsea flowlines. This article considers direct electrically heated flowlines that were installed at an offshore facility in 2004. In 2022, one of the piggyback cables was successfully repaired. The root cause for failure was dielectric breakd...
Saved in:
Published in: | ISOPE - International Offshore and Polar Engineering Conference. Proceedings 2024 |
---|---|
Main Authors: | , , , , , , |
Format: | Article |
Language: | English |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Direct electrical heating is a flow assurance method for subsea flowlines. This article considers direct electrically heated flowlines that were installed at an offshore facility in 2004. In 2022, one of the piggyback cables was successfully repaired. The root cause for failure was dielectric breakdown of the transition joint between the feeder cable and the piggyback cable because of high accidental axial compression forces. The accumulated operation time from 2004 to 2022 was 450 days. Fingerprints from commissioning were essential in fault location, and the fault was pin pointed with an accuracy of a few meters. Investigations of the XLPE insulation material showed that the cable was in a generally good condition. KEY WORDS: Direct electrical heating; flow assurance; repair; fault location; operation record; prolonged lifetime |
---|---|
ISSN: | 1506-1511 |