Loading…

A Fast Outage Planning Method Focusing on Circuit Breakers Near Outage Facilities

SUMMARY Japanese electric power utilities installed many electric power facilities to respond to increasing power demand in the era of high economic growth. However, these facilities have aged about 40 years and should be replaced in the near future. The utilities will now have to replace larger num...

Full description

Saved in:
Bibliographic Details
Published in:Electrical engineering in Japan 2015-05, Vol.191 (3), p.9-17
Main Authors: Murakami, Chihaya, Fujiwara, Aya, Iwamoto, Shinichi
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:SUMMARY Japanese electric power utilities installed many electric power facilities to respond to increasing power demand in the era of high economic growth. However, these facilities have aged about 40 years and should be replaced in the near future. The utilities will now have to replace larger numbers of facilities at the same time because of the increase in the number of power facilities to be replaced. Therefore, outage planning should be made more efficient. However, creating an outage plan requires time and labor, because the plan must specify (1) the outage schedule, (2) the power system configuration during outage operations, and (3) the system switching of the power system in order to conduct the outage operations. To solve these problems, a fast outage planning method focusing on circuit breakers near the outage facilities is proposed in this paper. Simulations run on IEEJ subtransmission system model I confirm the validity of the proposed method.
ISSN:0424-7760
1520-6416
DOI:10.1002/eej.22697