Summary 30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. De...

Full description

Saved in:
Bibliographic Details
Published in:Elektrotechnik und Informationstechnik 2010-12, Vol.127 (12), p.344-349
Main Authors: Svejda, G., Vavra, J., Bechis, M., Gaspari, R., Wanda, M.
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 349
container_issue 12
container_start_page 344
container_title Elektrotechnik und Informationstechnik
container_volume 127
creator Svejda, G.
Vavra, J.
Bechis, M.
Gaspari, R.
Wanda, M.
description Summary 30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.
doi_str_mv 10.1007/s00502-010-0789-z
format article
fullrecord <record><control><sourceid>crossref_sprin</sourceid><recordid>TN_cdi_crossref_primary_10_1007_s00502_010_0789_z</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_1007_s00502_010_0789_z</sourcerecordid><originalsourceid>FETCH-LOGICAL-c240t-5dac1f743a62c03e00a341b1c23785dfa10eed5e2274abeb4852b681843893643</originalsourceid><addsrcrecordid>eNp9kMtOwzAQRS0EEqXwAez8A4bxI4m7RBUFpEpsaMXOcpxJ5DZ1IruVaL-epGXNakaae0ZXh5BHDk8coHhOABkIBhwYFHrGTldkwnMuWZELuCYTmEnBpJbft-QupQ2AkoXWExJXfRNt5UNDu5rij0_7cVcAdLumiwV9X1NnyxZp68OWlkcascLkmzDGbKio3_Ut7jCcubqLDivquq493_veRrs_JEzUB7r2GIK9Jze1bRM-_M0pWS1ev-bvbPn59jF_WTInFOxZVlnH60JJmwsHEgGsVLzkTgzNs6q2HBCrDIUolC2xVDoTZa65VlLPZK7klPDLXxe7lCLWpo9-Z-PRcDCjNHORZgZpZpRmTgMjLkwasqHBaDbdIYah5j_QL0f8cDg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</title><source>Springer Link</source><creator>Svejda, G. ; Vavra, J. ; Bechis, M. ; Gaspari, R. ; Wanda, M.</creator><creatorcontrib>Svejda, G. ; Vavra, J. ; Bechis, M. ; Gaspari, R. ; Wanda, M.</creatorcontrib><description>Summary 30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.</description><identifier>ISSN: 0932-383X</identifier><identifier>EISSN: 1613-7620</identifier><identifier>DOI: 10.1007/s00502-010-0789-z</identifier><language>eng</language><publisher>Vienna: Springer Vienna</publisher><subject>Cigre 2010 ; Computer Hardware ; Electrical Engineering ; Engineering ; Software Engineering/Programming and Operating Systems</subject><ispartof>Elektrotechnik und Informationstechnik, 2010-12, Vol.127 (12), p.344-349</ispartof><rights>Springer-Verlag 2010</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>Svejda, G.</creatorcontrib><creatorcontrib>Vavra, J.</creatorcontrib><creatorcontrib>Bechis, M.</creatorcontrib><creatorcontrib>Gaspari, R.</creatorcontrib><creatorcontrib>Wanda, M.</creatorcontrib><title>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</title><title>Elektrotechnik und Informationstechnik</title><addtitle>Elektrotech. Inftech</addtitle><description>Summary 30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.</description><subject>Cigre 2010</subject><subject>Computer Hardware</subject><subject>Electrical Engineering</subject><subject>Engineering</subject><subject>Software Engineering/Programming and Operating Systems</subject><issn>0932-383X</issn><issn>1613-7620</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2010</creationdate><recordtype>article</recordtype><recordid>eNp9kMtOwzAQRS0EEqXwAez8A4bxI4m7RBUFpEpsaMXOcpxJ5DZ1IruVaL-epGXNakaae0ZXh5BHDk8coHhOABkIBhwYFHrGTldkwnMuWZELuCYTmEnBpJbft-QupQ2AkoXWExJXfRNt5UNDu5rij0_7cVcAdLumiwV9X1NnyxZp68OWlkcascLkmzDGbKio3_Ut7jCcubqLDivquq493_veRrs_JEzUB7r2GIK9Jze1bRM-_M0pWS1ev-bvbPn59jF_WTInFOxZVlnH60JJmwsHEgGsVLzkTgzNs6q2HBCrDIUolC2xVDoTZa65VlLPZK7klPDLXxe7lCLWpo9-Z-PRcDCjNHORZgZpZpRmTgMjLkwasqHBaDbdIYah5j_QL0f8cDg</recordid><startdate>20101201</startdate><enddate>20101201</enddate><creator>Svejda, G.</creator><creator>Vavra, J.</creator><creator>Bechis, M.</creator><creator>Gaspari, R.</creator><creator>Wanda, M.</creator><general>Springer Vienna</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20101201</creationdate><title>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</title><author>Svejda, G. ; Vavra, J. ; Bechis, M. ; Gaspari, R. ; Wanda, M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c240t-5dac1f743a62c03e00a341b1c23785dfa10eed5e2274abeb4852b681843893643</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2010</creationdate><topic>Cigre 2010</topic><topic>Computer Hardware</topic><topic>Electrical Engineering</topic><topic>Engineering</topic><topic>Software Engineering/Programming and Operating Systems</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Svejda, G.</creatorcontrib><creatorcontrib>Vavra, J.</creatorcontrib><creatorcontrib>Bechis, M.</creatorcontrib><creatorcontrib>Gaspari, R.</creatorcontrib><creatorcontrib>Wanda, M.</creatorcontrib><collection>CrossRef</collection><jtitle>Elektrotechnik und Informationstechnik</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Svejda, G.</au><au>Vavra, J.</au><au>Bechis, M.</au><au>Gaspari, R.</au><au>Wanda, M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</atitle><jtitle>Elektrotechnik und Informationstechnik</jtitle><stitle>Elektrotech. Inftech</stitle><date>2010-12-01</date><risdate>2010</risdate><volume>127</volume><issue>12</issue><spage>344</spage><epage>349</epage><pages>344-349</pages><issn>0932-383X</issn><eissn>1613-7620</eissn><abstract>Summary 30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.</abstract><cop>Vienna</cop><pub>Springer Vienna</pub><doi>10.1007/s00502-010-0789-z</doi><tpages>6</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0932-383X
ispartof Elektrotechnik und Informationstechnik, 2010-12, Vol.127 (12), p.344-349
issn 0932-383X
1613-7620
language eng
recordid cdi_crossref_primary_10_1007_s00502_010_0789_z
source Springer Link
subjects Cigre 2010
Computer Hardware
Electrical Engineering
Engineering
Software Engineering/Programming and Operating Systems
title Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T20%3A04%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_sprin&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Upgrading%20of%20existing%20400%20kV%20FF%20HV%20cable%20link%20by%20redesigning%20and%20implementing%20forced%20cooling%20apparatuses%20in%20Vienna&rft.jtitle=Elektrotechnik%20und%20Informationstechnik&rft.au=Svejda,%20G.&rft.date=2010-12-01&rft.volume=127&rft.issue=12&rft.spage=344&rft.epage=349&rft.pages=344-349&rft.issn=0932-383X&rft.eissn=1613-7620&rft_id=info:doi/10.1007/s00502-010-0789-z&rft_dat=%3Ccrossref_sprin%3E10_1007_s00502_010_0789_z%3C/crossref_sprin%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c240t-5dac1f743a62c03e00a341b1c23785dfa10eed5e2274abeb4852b681843893643%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true