Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna
Summary 30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. De...
Saved in:
Published in: | Elektrotechnik und Informationstechnik 2010-12, Vol.127 (12), p.344-349 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 349 |
container_issue | 12 |
container_start_page | 344 |
container_title | Elektrotechnik und Informationstechnik |
container_volume | 127 |
creator | Svejda, G. Vavra, J. Bechis, M. Gaspari, R. Wanda, M. |
description | Summary
30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth. |
doi_str_mv | 10.1007/s00502-010-0789-z |
format | article |
fullrecord | <record><control><sourceid>crossref_sprin</sourceid><recordid>TN_cdi_crossref_primary_10_1007_s00502_010_0789_z</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_1007_s00502_010_0789_z</sourcerecordid><originalsourceid>FETCH-LOGICAL-c240t-5dac1f743a62c03e00a341b1c23785dfa10eed5e2274abeb4852b681843893643</originalsourceid><addsrcrecordid>eNp9kMtOwzAQRS0EEqXwAez8A4bxI4m7RBUFpEpsaMXOcpxJ5DZ1IruVaL-epGXNakaae0ZXh5BHDk8coHhOABkIBhwYFHrGTldkwnMuWZELuCYTmEnBpJbft-QupQ2AkoXWExJXfRNt5UNDu5rij0_7cVcAdLumiwV9X1NnyxZp68OWlkcascLkmzDGbKio3_Ut7jCcubqLDivquq493_veRrs_JEzUB7r2GIK9Jze1bRM-_M0pWS1ev-bvbPn59jF_WTInFOxZVlnH60JJmwsHEgGsVLzkTgzNs6q2HBCrDIUolC2xVDoTZa65VlLPZK7klPDLXxe7lCLWpo9-Z-PRcDCjNHORZgZpZpRmTgMjLkwasqHBaDbdIYah5j_QL0f8cDg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</title><source>Springer Link</source><creator>Svejda, G. ; Vavra, J. ; Bechis, M. ; Gaspari, R. ; Wanda, M.</creator><creatorcontrib>Svejda, G. ; Vavra, J. ; Bechis, M. ; Gaspari, R. ; Wanda, M.</creatorcontrib><description>Summary
30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.</description><identifier>ISSN: 0932-383X</identifier><identifier>EISSN: 1613-7620</identifier><identifier>DOI: 10.1007/s00502-010-0789-z</identifier><language>eng</language><publisher>Vienna: Springer Vienna</publisher><subject>Cigre 2010 ; Computer Hardware ; Electrical Engineering ; Engineering ; Software Engineering/Programming and Operating Systems</subject><ispartof>Elektrotechnik und Informationstechnik, 2010-12, Vol.127 (12), p.344-349</ispartof><rights>Springer-Verlag 2010</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>Svejda, G.</creatorcontrib><creatorcontrib>Vavra, J.</creatorcontrib><creatorcontrib>Bechis, M.</creatorcontrib><creatorcontrib>Gaspari, R.</creatorcontrib><creatorcontrib>Wanda, M.</creatorcontrib><title>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</title><title>Elektrotechnik und Informationstechnik</title><addtitle>Elektrotech. Inftech</addtitle><description>Summary
30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.</description><subject>Cigre 2010</subject><subject>Computer Hardware</subject><subject>Electrical Engineering</subject><subject>Engineering</subject><subject>Software Engineering/Programming and Operating Systems</subject><issn>0932-383X</issn><issn>1613-7620</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2010</creationdate><recordtype>article</recordtype><recordid>eNp9kMtOwzAQRS0EEqXwAez8A4bxI4m7RBUFpEpsaMXOcpxJ5DZ1IruVaL-epGXNakaae0ZXh5BHDk8coHhOABkIBhwYFHrGTldkwnMuWZELuCYTmEnBpJbft-QupQ2AkoXWExJXfRNt5UNDu5rij0_7cVcAdLumiwV9X1NnyxZp68OWlkcascLkmzDGbKio3_Ut7jCcubqLDivquq493_veRrs_JEzUB7r2GIK9Jze1bRM-_M0pWS1ev-bvbPn59jF_WTInFOxZVlnH60JJmwsHEgGsVLzkTgzNs6q2HBCrDIUolC2xVDoTZa65VlLPZK7klPDLXxe7lCLWpo9-Z-PRcDCjNHORZgZpZpRmTgMjLkwasqHBaDbdIYah5j_QL0f8cDg</recordid><startdate>20101201</startdate><enddate>20101201</enddate><creator>Svejda, G.</creator><creator>Vavra, J.</creator><creator>Bechis, M.</creator><creator>Gaspari, R.</creator><creator>Wanda, M.</creator><general>Springer Vienna</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20101201</creationdate><title>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</title><author>Svejda, G. ; Vavra, J. ; Bechis, M. ; Gaspari, R. ; Wanda, M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c240t-5dac1f743a62c03e00a341b1c23785dfa10eed5e2274abeb4852b681843893643</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2010</creationdate><topic>Cigre 2010</topic><topic>Computer Hardware</topic><topic>Electrical Engineering</topic><topic>Engineering</topic><topic>Software Engineering/Programming and Operating Systems</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Svejda, G.</creatorcontrib><creatorcontrib>Vavra, J.</creatorcontrib><creatorcontrib>Bechis, M.</creatorcontrib><creatorcontrib>Gaspari, R.</creatorcontrib><creatorcontrib>Wanda, M.</creatorcontrib><collection>CrossRef</collection><jtitle>Elektrotechnik und Informationstechnik</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Svejda, G.</au><au>Vavra, J.</au><au>Bechis, M.</au><au>Gaspari, R.</au><au>Wanda, M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna</atitle><jtitle>Elektrotechnik und Informationstechnik</jtitle><stitle>Elektrotech. Inftech</stitle><date>2010-12-01</date><risdate>2010</risdate><volume>127</volume><issue>12</issue><spage>344</spage><epage>349</epage><pages>344-349</pages><issn>0932-383X</issn><eissn>1613-7620</eissn><abstract>Summary
30 years sleeping of 100 km cooling pipes was long enough to launch a process of evaluating and construction of a high sophisticated cooling installation of 24 km FF HV cable systems. The old cable crew remembered of easily upgrading from 600 to 1000 MVA discharging cold water into pipes. Deeper investigations showed what had to be changed of old constructions. The relationship between water temperature and pressure in the tubes for calculating their further lifetime is essential. The awareness of PRYSMIAN the old calculation would kill the cables in the middle of the span without an additional cooling station. Costs of the cooling: €14 Mill. instead of €95 Mill. for new cable systems. The evidence in reliability of FF HV cables made it worth.</abstract><cop>Vienna</cop><pub>Springer Vienna</pub><doi>10.1007/s00502-010-0789-z</doi><tpages>6</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0932-383X |
ispartof | Elektrotechnik und Informationstechnik, 2010-12, Vol.127 (12), p.344-349 |
issn | 0932-383X 1613-7620 |
language | eng |
recordid | cdi_crossref_primary_10_1007_s00502_010_0789_z |
source | Springer Link |
subjects | Cigre 2010 Computer Hardware Electrical Engineering Engineering Software Engineering/Programming and Operating Systems |
title | Upgrading of existing 400 kV FF HV cable link by redesigning and implementing forced cooling apparatuses in Vienna |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T20%3A04%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_sprin&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Upgrading%20of%20existing%20400%20kV%20FF%20HV%20cable%20link%20by%20redesigning%20and%20implementing%20forced%20cooling%20apparatuses%20in%20Vienna&rft.jtitle=Elektrotechnik%20und%20Informationstechnik&rft.au=Svejda,%20G.&rft.date=2010-12-01&rft.volume=127&rft.issue=12&rft.spage=344&rft.epage=349&rft.pages=344-349&rft.issn=0932-383X&rft.eissn=1613-7620&rft_id=info:doi/10.1007/s00502-010-0789-z&rft_dat=%3Ccrossref_sprin%3E10_1007_s00502_010_0789_z%3C/crossref_sprin%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c240t-5dac1f743a62c03e00a341b1c23785dfa10eed5e2274abeb4852b681843893643%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |