EPB excavation in transitional mixed face: Line 5—Lilac (São Paulo Metro, Brazil)

The use of Earth Pressure Balance (EPB) shields is still very modest for tunneling in urban areas in Brazil. This study analyzed and integrated geological data and excavation parameters of a segment of Route 2 (Lot 3) of the Line 5—Lilac (São Paulo Metro), between Campo Belo Station and Jesuíno Maci...

Full description

Saved in:
Bibliographic Details
Published in:Bulletin of engineering geology and the environment 2022-05, Vol.81 (5), Article 196
Main Authors: Filho, Luís Cesar Esteves Flamínio, Hartwig, Marcos Eduardo, Moreira, Cesar Augusto
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The use of Earth Pressure Balance (EPB) shields is still very modest for tunneling in urban areas in Brazil. This study analyzed and integrated geological data and excavation parameters of a segment of Route 2 (Lot 3) of the Line 5—Lilac (São Paulo Metro), between Campo Belo Station and Jesuíno Maciel Shaft. This segment is 557 m long and represents one of the first experiences on tunneling in transitional mixed face with pressurized shield machines in Brazil. The excavation performed an average advance rate of 7.7 m/day and intercepted different proportions of gneisses, saprolites, and residual soils. The results show how the excavation parameters respond to different geological materials. The sections excavated in mixed transitional ground conditions had several negative effects on the excavation process, similarly to that described in other projects worldwide. Finally, results also suggested the nominal torque was insufficient for excavation of the segment.
ISSN:1435-9529
1435-9537
DOI:10.1007/s10064-022-02694-z