Loading…

The BaBaR drift chamber project

The BaBar Drift Chamber is now under construction. We review its design, the progress in the construction of the components, the plan for assembly and stringing and we present test results obtained with a prototype exposed at SLAC to cosmic rays. We also report on projected dE/dx performance from be...

Full description

Saved in:
Bibliographic Details
Published in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 1998-05, Vol.409 (1-3), p.46-52
Main Authors: Boucham, A., Boutigny, D., Bonis, I.De, Jeremie, A., Karyotakis, Y., Lafaye, R., Goodenough, C., Hearty, C., Heise, J., Kelsey, M., McKenna, J., Dorfan, D., Fernandez, J., Sadrozinski, H., Schumm, B., Spencer, N., Harton, J., Malchow, R., Smy, M., Warner, D., Broomer, B., Erdos, E., Ford, W.T., Gritsan, A., Johnson, D.R., Krieg, H., Roy, J., Park, H., Rankin, P., Smith, J.G., Gaddi, A., Morganti, M., Raffaelli, F., Borsato, E., Caracciolo, R., Corso, F.Dal, Fanin, C., Morandin, M., Posocco, M., Santi, S., Stroili, R., Torassa, E., Voci, C., Bronzini, F., Buccheri, A., Ferroni, F., Lamanna, E., Mazzoni, M.A., Morganti, S., Piredda, G., Santacesaria, R., Dow, S., Karcher, A., Levi, M., Lippe, H.von der, Momayezi, M., Bard, R., Dallapiccola, C., Fong, D., Jawahery, H., Miller, W., Cowan, R.F., Yamamoto, R.K., Britton, D.I., Fernholz, R., Houde, M., MacFarlane, D.B., Patel, P.M., Trischuk, J., Beaulieu, M., Martin, J.-P., Taras, P., Woch, A., Zacek, V., Lu, C., McDonald, K.T., Smith, A.J.S., III, W.R.Sands, Bajic, A., Boyarski, A., Boyce, R., Coupal, D., Coward, D., Harris, J., Hodgson, J., McDougald, M., Morii, M., Nelson, D., Palrang, M., Sciolla, G., Schaffner, S., Snyder, A., Wagner, S., Henderson, R., Khan, N., Pitman, D., Roney, J.M.
Format: Article
Language:English
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The BaBar Drift Chamber is now under construction. We review its design, the progress in the construction of the components, the plan for assembly and stringing and we present test results obtained with a prototype exposed at SLAC to cosmic rays. We also report on projected dE/dx performance from beam tests done with a chamber with a different cell design.
ISSN:0168-9002
1872-9576
DOI:10.1016/S0168-9002(97)01232-1