The First Stage of French Vertical Flow Constructed Wetlands (FS-FVFCW) offers a sustainable solution for treating septage. The system operates through distinct phases: start-up, full operation and final rest. During full operation, factors such as feeding duration, rest periods and percolate impoun...

Full description

Saved in:
Bibliographic Details
Published in:Ecological engineering 2024-09, Vol.206, p.107329, Article 107329
Main Authors: Arévalo-Durazno, María B., García Zumalacarregui, Jorge A., Ho, Long, Narváez, Andrea, Alvarado, Andrés
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The First Stage of French Vertical Flow Constructed Wetlands (FS-FVFCW) offers a sustainable solution for treating septage. The system operates through distinct phases: start-up, full operation and final rest. During full operation, factors such as feeding duration, rest periods and percolate impounding significantly affect performance. This study assessed the performance of a pilot-scale Modified FS-FVFCW in Northern Tropical Andes, from start-up to closure stages under three operational scenarios. These scenarios varied in planted/unplanted conditions and percolate drainage/impounding. A four-month start-up phase proved adequate for vegetation growth and adaptation, achieving over 50% COD removal efficiency. Percolate retention (impounding) during operation notably improved COD and TS removal, increasing efficiencies from 49% to approximately 90% for COD and from 39% to around 70% for TS. Plant presence contributed to mosquito control and odour reduction but had minimal impact on removal efficiencies. The pilot demonstrated significant dewatering potential, with sludge deposit samples showing water content below 76% across all scenarios after 24 h; and a 10% reduction in VS/TS ratio during the operational resting period. After a 5-month closure, the sludge deposit layer exhibited organic matter content similar to long-rested sludge, albeit with persistent faecal contamination. •A 4-month start-up with untreated wastewater successfully allows the plants adaptation.•Septage percolate impounding in VFCWs significantly enhances the removal of COD and TS.•Sludge samples reach water content levels below 76% within 24 h.•Faecal contamination persists in sludge samples even after a 5-month closure period.