Loading…

Roof pre-blasting to prevent support crushing and water inrush accidents

Support crushing and water inrush when mining under an unconsolidated confined aquifer in the Q idong Coal Mine was prevented by roof pre-blasting. The mechanism and applicable conditions for this method have been studied. The results show that when an overburden structure that may cause support cru...

Full description

Saved in:
Bibliographic Details
Published in:International journal of mining science and technology 2012-05, Vol.22 (3), p.379-384
Main Authors: Wang, Xiaozhen, Xu, Jialin, Zhu, Weibing, Li, Yingchun
Format: Article
Language:English
Subjects:
Citations: Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Support crushing and water inrush when mining under an unconsolidated confined aquifer in the Q idong Coal Mine was prevented by roof pre-blasting. The mechanism and applicable conditions for this method have been studied. The results show that when an overburden structure that may cause support crushing and a water inrush accident exists the weakening of the primary key stratum, which thereby reduces its weighting step, roof pre-blasting is both feasible and effective. If the position of the primary key stratum can be moved upward to exceed 10 times the mining height the possibility of support crushing and water inrush disaster caused by key stratum compound breakage will be lowered. The overburden structure of the number 7121 working face was considered during the design of a technical proposal involving roof pre-blasting. After comprehensively analyzing the applicability of roof pre-blasting the resulting design prevented support crushing and water inrush disasters from happening at the number 7121 working face and laid a solid foundation for mining safely.
ISSN:2095-2686
DOI:10.1016/j.ijmst.2012.04.016