Loading…

Development of aerobic granulation system for simultaneous removal of C, N, and P in sequencing batch airlift reactor

Conventional biological nutrient removal techniques often have disadvantages like low removal efficiencies, requirement of large footprint, and excess sludge production. Ever increasing stringent discharge standards demand for alternative technologies. In this context aerobic granular sludge (AGS) h...

Full description

Saved in:
Bibliographic Details
Published in:Journal of environmental chemical engineering 2021-10, Vol.9 (5), p.106100, Article 106100
Main Authors: Desireddy, Swathi, Sabumon, P.C.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c300t-bbaff9ddc892e79765f8b3289266214b16312cf3134ea98cf9906ed9b269e35a3
cites cdi_FETCH-LOGICAL-c300t-bbaff9ddc892e79765f8b3289266214b16312cf3134ea98cf9906ed9b269e35a3
container_end_page
container_issue 5
container_start_page 106100
container_title Journal of environmental chemical engineering
container_volume 9
creator Desireddy, Swathi
Sabumon, P.C.
description Conventional biological nutrient removal techniques often have disadvantages like low removal efficiencies, requirement of large footprint, and excess sludge production. Ever increasing stringent discharge standards demand for alternative technologies. In this context aerobic granular sludge (AGS) has evolved as a promising technology for complete nutrient removal. However, degradation of structural integrity of aerobic granules in long run is a prime concern of this technology. This work attempts to develop stable aerobic granules in an automated sequential batch airlift reactor (SBAR) for simultaneous C, N, and P removals under alternating aerobic and anoxic conditions. The reactor was operated at high sludge retention time (SRT). Combined operating strategies of varying dissolved oxygen (DO) concentration and feed cycle times were followed to optimize the conditions for effective granulation and subsequent removal efficiencies. Profiles of extracellular polymeric substances (EPS) and sludge volume index (SVI) were monitored. Optimum removal efficiencies of NH4+-N (92.7%), TN (90.6%), COD (90.1%), and PO43--P (83.2%), and granules of size 1.3–8 mm were achieved in phase IV at operational DO of 1–2 mg/L, and feeding intervals of 15 h and 9 h. NH4+-N (R2 = 0.97, k = 0.5093/h) and PO43--P (R2 = 0.95, k = 0.2574/h) removals were fitted well with first order kinetic model and that of COD (R2 = 0.97, k = 0.0032 L/mg/h) followed second order kinetics. This process is economical as effective biological nutrient and organics removal occurs in a single reactor without requirement of alkalinity supply, and negligible excess sludge production. The process requires small foot print and applicable for decentralized wastewater management in University campuses/tourist resorts/apartment complexes. [Display omitted] •Stable aerobic granular sludge was developed for simultaneous CNP removal in a SBAR by optimizing DO and feed cycle intervals.•Aerobic granules of size 1.3–8 mm were achieved at operational DO of 1–2 mg/L.•Simultaneous removal of COD (90.1%), Total Nitrogen (90.6%), and PO43--P (83.2%) were achieved in phase IV.•Zero sludge discharge was achieved at optimal feed cycle involving a long starvation period.•Excellent granule stability and effective nutrient removal were attained even at a very high SRT of 124 days.
doi_str_mv 10.1016/j.jece.2021.106100
format article
fullrecord <record><control><sourceid>elsevier_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1016_j_jece_2021_106100</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S2213343721010770</els_id><sourcerecordid>S2213343721010770</sourcerecordid><originalsourceid>FETCH-LOGICAL-c300t-bbaff9ddc892e79765f8b3289266214b16312cf3134ea98cf9906ed9b269e35a3</originalsourceid><addsrcrecordid>eNp9kEtLAzEQgIMoWGr_gKf8gG7No00b8CL1CUU96Dlks5OaZXdTk2yh_94s68GTc5kHfMPMh9A1JQtKqLipFzUYWDDCaB4ISsgZmjBGecGXfH3-p75EsxhrkkNKuhJ0gvp7OELjDy10CXuLNQRfOoP3QXd9o5PzHY6nmKDF1gccXds3SXfg-4gDtP6omwHbzvHrHOuuwu_YZQK-e-iM6_a41Ml8Ye1C42zKiDbJhyt0YXUTYfabp-jz8eFj-1zs3p5etne7wnBCUlGW2lpZVWYjGazlWqzspuQsd0Iwuiyp4JQZyylfgpYbY6UkAipZMiGBrzSfIjbuNcHHGMCqQ3CtDidFiRrcqVoN7tTgTo3uMnQ7QpAvOzoIKhqXv4HKBTBJVd79h_8AfOV4jg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Development of aerobic granulation system for simultaneous removal of C, N, and P in sequencing batch airlift reactor</title><source>ScienceDirect Freedom Collection 2022-2024</source><creator>Desireddy, Swathi ; Sabumon, P.C.</creator><creatorcontrib>Desireddy, Swathi ; Sabumon, P.C.</creatorcontrib><description>Conventional biological nutrient removal techniques often have disadvantages like low removal efficiencies, requirement of large footprint, and excess sludge production. Ever increasing stringent discharge standards demand for alternative technologies. In this context aerobic granular sludge (AGS) has evolved as a promising technology for complete nutrient removal. However, degradation of structural integrity of aerobic granules in long run is a prime concern of this technology. This work attempts to develop stable aerobic granules in an automated sequential batch airlift reactor (SBAR) for simultaneous C, N, and P removals under alternating aerobic and anoxic conditions. The reactor was operated at high sludge retention time (SRT). Combined operating strategies of varying dissolved oxygen (DO) concentration and feed cycle times were followed to optimize the conditions for effective granulation and subsequent removal efficiencies. Profiles of extracellular polymeric substances (EPS) and sludge volume index (SVI) were monitored. Optimum removal efficiencies of NH4+-N (92.7%), TN (90.6%), COD (90.1%), and PO43--P (83.2%), and granules of size 1.3–8 mm were achieved in phase IV at operational DO of 1–2 mg/L, and feeding intervals of 15 h and 9 h. NH4+-N (R2 = 0.97, k = 0.5093/h) and PO43--P (R2 = 0.95, k = 0.2574/h) removals were fitted well with first order kinetic model and that of COD (R2 = 0.97, k = 0.0032 L/mg/h) followed second order kinetics. This process is economical as effective biological nutrient and organics removal occurs in a single reactor without requirement of alkalinity supply, and negligible excess sludge production. The process requires small foot print and applicable for decentralized wastewater management in University campuses/tourist resorts/apartment complexes. [Display omitted] •Stable aerobic granular sludge was developed for simultaneous CNP removal in a SBAR by optimizing DO and feed cycle intervals.•Aerobic granules of size 1.3–8 mm were achieved at operational DO of 1–2 mg/L.•Simultaneous removal of COD (90.1%), Total Nitrogen (90.6%), and PO43--P (83.2%) were achieved in phase IV.•Zero sludge discharge was achieved at optimal feed cycle involving a long starvation period.•Excellent granule stability and effective nutrient removal were attained even at a very high SRT of 124 days.</description><identifier>ISSN: 2213-3437</identifier><identifier>EISSN: 2213-3437</identifier><identifier>DOI: 10.1016/j.jece.2021.106100</identifier><language>eng</language><publisher>Elsevier Ltd</publisher><subject>Aerobic granules ; Denitrifying phosphorous removal process ; Sequential batch airlift reactor ; Simultaneous CNP removal ; Wastewater treatment</subject><ispartof>Journal of environmental chemical engineering, 2021-10, Vol.9 (5), p.106100, Article 106100</ispartof><rights>2021 Elsevier Ltd</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c300t-bbaff9ddc892e79765f8b3289266214b16312cf3134ea98cf9906ed9b269e35a3</citedby><cites>FETCH-LOGICAL-c300t-bbaff9ddc892e79765f8b3289266214b16312cf3134ea98cf9906ed9b269e35a3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>Desireddy, Swathi</creatorcontrib><creatorcontrib>Sabumon, P.C.</creatorcontrib><title>Development of aerobic granulation system for simultaneous removal of C, N, and P in sequencing batch airlift reactor</title><title>Journal of environmental chemical engineering</title><description>Conventional biological nutrient removal techniques often have disadvantages like low removal efficiencies, requirement of large footprint, and excess sludge production. Ever increasing stringent discharge standards demand for alternative technologies. In this context aerobic granular sludge (AGS) has evolved as a promising technology for complete nutrient removal. However, degradation of structural integrity of aerobic granules in long run is a prime concern of this technology. This work attempts to develop stable aerobic granules in an automated sequential batch airlift reactor (SBAR) for simultaneous C, N, and P removals under alternating aerobic and anoxic conditions. The reactor was operated at high sludge retention time (SRT). Combined operating strategies of varying dissolved oxygen (DO) concentration and feed cycle times were followed to optimize the conditions for effective granulation and subsequent removal efficiencies. Profiles of extracellular polymeric substances (EPS) and sludge volume index (SVI) were monitored. Optimum removal efficiencies of NH4+-N (92.7%), TN (90.6%), COD (90.1%), and PO43--P (83.2%), and granules of size 1.3–8 mm were achieved in phase IV at operational DO of 1–2 mg/L, and feeding intervals of 15 h and 9 h. NH4+-N (R2 = 0.97, k = 0.5093/h) and PO43--P (R2 = 0.95, k = 0.2574/h) removals were fitted well with first order kinetic model and that of COD (R2 = 0.97, k = 0.0032 L/mg/h) followed second order kinetics. This process is economical as effective biological nutrient and organics removal occurs in a single reactor without requirement of alkalinity supply, and negligible excess sludge production. The process requires small foot print and applicable for decentralized wastewater management in University campuses/tourist resorts/apartment complexes. [Display omitted] •Stable aerobic granular sludge was developed for simultaneous CNP removal in a SBAR by optimizing DO and feed cycle intervals.•Aerobic granules of size 1.3–8 mm were achieved at operational DO of 1–2 mg/L.•Simultaneous removal of COD (90.1%), Total Nitrogen (90.6%), and PO43--P (83.2%) were achieved in phase IV.•Zero sludge discharge was achieved at optimal feed cycle involving a long starvation period.•Excellent granule stability and effective nutrient removal were attained even at a very high SRT of 124 days.</description><subject>Aerobic granules</subject><subject>Denitrifying phosphorous removal process</subject><subject>Sequential batch airlift reactor</subject><subject>Simultaneous CNP removal</subject><subject>Wastewater treatment</subject><issn>2213-3437</issn><issn>2213-3437</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNp9kEtLAzEQgIMoWGr_gKf8gG7No00b8CL1CUU96Dlks5OaZXdTk2yh_94s68GTc5kHfMPMh9A1JQtKqLipFzUYWDDCaB4ISsgZmjBGecGXfH3-p75EsxhrkkNKuhJ0gvp7OELjDy10CXuLNQRfOoP3QXd9o5PzHY6nmKDF1gccXds3SXfg-4gDtP6omwHbzvHrHOuuwu_YZQK-e-iM6_a41Ml8Ye1C42zKiDbJhyt0YXUTYfabp-jz8eFj-1zs3p5etne7wnBCUlGW2lpZVWYjGazlWqzspuQsd0Iwuiyp4JQZyylfgpYbY6UkAipZMiGBrzSfIjbuNcHHGMCqQ3CtDidFiRrcqVoN7tTgTo3uMnQ7QpAvOzoIKhqXv4HKBTBJVd79h_8AfOV4jg</recordid><startdate>202110</startdate><enddate>202110</enddate><creator>Desireddy, Swathi</creator><creator>Sabumon, P.C.</creator><general>Elsevier Ltd</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>202110</creationdate><title>Development of aerobic granulation system for simultaneous removal of C, N, and P in sequencing batch airlift reactor</title><author>Desireddy, Swathi ; Sabumon, P.C.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c300t-bbaff9ddc892e79765f8b3289266214b16312cf3134ea98cf9906ed9b269e35a3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Aerobic granules</topic><topic>Denitrifying phosphorous removal process</topic><topic>Sequential batch airlift reactor</topic><topic>Simultaneous CNP removal</topic><topic>Wastewater treatment</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Desireddy, Swathi</creatorcontrib><creatorcontrib>Sabumon, P.C.</creatorcontrib><collection>CrossRef</collection><jtitle>Journal of environmental chemical engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Desireddy, Swathi</au><au>Sabumon, P.C.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Development of aerobic granulation system for simultaneous removal of C, N, and P in sequencing batch airlift reactor</atitle><jtitle>Journal of environmental chemical engineering</jtitle><date>2021-10</date><risdate>2021</risdate><volume>9</volume><issue>5</issue><spage>106100</spage><pages>106100-</pages><artnum>106100</artnum><issn>2213-3437</issn><eissn>2213-3437</eissn><abstract>Conventional biological nutrient removal techniques often have disadvantages like low removal efficiencies, requirement of large footprint, and excess sludge production. Ever increasing stringent discharge standards demand for alternative technologies. In this context aerobic granular sludge (AGS) has evolved as a promising technology for complete nutrient removal. However, degradation of structural integrity of aerobic granules in long run is a prime concern of this technology. This work attempts to develop stable aerobic granules in an automated sequential batch airlift reactor (SBAR) for simultaneous C, N, and P removals under alternating aerobic and anoxic conditions. The reactor was operated at high sludge retention time (SRT). Combined operating strategies of varying dissolved oxygen (DO) concentration and feed cycle times were followed to optimize the conditions for effective granulation and subsequent removal efficiencies. Profiles of extracellular polymeric substances (EPS) and sludge volume index (SVI) were monitored. Optimum removal efficiencies of NH4+-N (92.7%), TN (90.6%), COD (90.1%), and PO43--P (83.2%), and granules of size 1.3–8 mm were achieved in phase IV at operational DO of 1–2 mg/L, and feeding intervals of 15 h and 9 h. NH4+-N (R2 = 0.97, k = 0.5093/h) and PO43--P (R2 = 0.95, k = 0.2574/h) removals were fitted well with first order kinetic model and that of COD (R2 = 0.97, k = 0.0032 L/mg/h) followed second order kinetics. This process is economical as effective biological nutrient and organics removal occurs in a single reactor without requirement of alkalinity supply, and negligible excess sludge production. The process requires small foot print and applicable for decentralized wastewater management in University campuses/tourist resorts/apartment complexes. [Display omitted] •Stable aerobic granular sludge was developed for simultaneous CNP removal in a SBAR by optimizing DO and feed cycle intervals.•Aerobic granules of size 1.3–8 mm were achieved at operational DO of 1–2 mg/L.•Simultaneous removal of COD (90.1%), Total Nitrogen (90.6%), and PO43--P (83.2%) were achieved in phase IV.•Zero sludge discharge was achieved at optimal feed cycle involving a long starvation period.•Excellent granule stability and effective nutrient removal were attained even at a very high SRT of 124 days.</abstract><pub>Elsevier Ltd</pub><doi>10.1016/j.jece.2021.106100</doi></addata></record>
fulltext fulltext
identifier ISSN: 2213-3437
ispartof Journal of environmental chemical engineering, 2021-10, Vol.9 (5), p.106100, Article 106100
issn 2213-3437
2213-3437
language eng
recordid cdi_crossref_primary_10_1016_j_jece_2021_106100
source ScienceDirect Freedom Collection 2022-2024
subjects Aerobic granules
Denitrifying phosphorous removal process
Sequential batch airlift reactor
Simultaneous CNP removal
Wastewater treatment
title Development of aerobic granulation system for simultaneous removal of C, N, and P in sequencing batch airlift reactor
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T12%3A51%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-elsevier_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Development%20of%20aerobic%20granulation%20system%20for%20simultaneous%20removal%20of%20C,%20N,%20and%20P%20in%20sequencing%20batch%20airlift%20reactor&rft.jtitle=Journal%20of%20environmental%20chemical%20engineering&rft.au=Desireddy,%20Swathi&rft.date=2021-10&rft.volume=9&rft.issue=5&rft.spage=106100&rft.pages=106100-&rft.artnum=106100&rft.issn=2213-3437&rft.eissn=2213-3437&rft_id=info:doi/10.1016/j.jece.2021.106100&rft_dat=%3Celsevier_cross%3ES2213343721010770%3C/elsevier_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c300t-bbaff9ddc892e79765f8b3289266214b16312cf3134ea98cf9906ed9b269e35a3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true