Loading…

Stochastic programming for floodwater utilization of a complex multi-reservoir system considering risk constraints

•Establishing a stochastic programming model for floodwater utilization of a complex multi-reservoir system.•Decomposing the system into four basic subsystems and identifying the excess storage for each subsystem.•Integrating risk constraints into the aggregation-decomposition method.•Introducing ri...

Full description

Saved in:
Bibliographic Details
Published in:Journal of hydrology (Amsterdam) 2021-08, Vol.599, p.126388, Article 126388
Main Authors: Lu, Qingwen, Zhong, Ping-an, Xu, Bin, Zhu, Feilin, Huang, Xin, Wang, Han, Ma, Yufei
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c309t-9d23c0fca3cc682a737592832753af8fd8c56f6ea6b5d9309d835a1af08a4e7b3
cites cdi_FETCH-LOGICAL-c309t-9d23c0fca3cc682a737592832753af8fd8c56f6ea6b5d9309d835a1af08a4e7b3
container_end_page
container_issue
container_start_page 126388
container_title Journal of hydrology (Amsterdam)
container_volume 599
creator Lu, Qingwen
Zhong, Ping-an
Xu, Bin
Zhu, Feilin
Huang, Xin
Wang, Han
Ma, Yufei
description •Establishing a stochastic programming model for floodwater utilization of a complex multi-reservoir system.•Decomposing the system into four basic subsystems and identifying the excess storage for each subsystem.•Integrating risk constraints into the aggregation-decomposition method.•Introducing risk hedging to offset the risks between reservoirs. Floodwater utilization through dynamic operating flood limited water levels (FLWLs) of reservoirs plays an important role in flood control and water conservation. This study proposes a risk-based aggregation-decomposition method for floodwater utilization of a complex multi-reservoir system. The original system is decomposed into four basic configurations. For the subsystem with hydraulic connections, the upper bound of FLWL of each reservoir is identified based on a given risk level for the subsystem and risk hedging between reservoirs. A stochastic programming model to maximize hydropower generation is then established for joint operation of the multi-reservoir system to find and update the optimal operation strategy during flood seasons. The mixed cascade reservoirs in the Pi River Basin are selected as a case study. The application results are compared with those of the original design model and deterministic operation model without considering risk, which shows that joint operation and dynamic control of FLWLs: 1) significantly increases the power generation and improves the utilization rate of floodwaters compared to those of the original design model; 2) power production rate increases with the acceptable risk but the increasing rate between them decreases with higher levels of risk; 3) results in lower utilization rate of floodwaters compared to that of the deterministic model, but the difference is not significant. The proposed method provides a framework for risk-based decision-making in floodwater utilization to enhance the comprehensive benefits of a multi-reservoir system.
doi_str_mv 10.1016/j.jhydrol.2021.126388
format article
fullrecord <record><control><sourceid>elsevier_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1016_j_jhydrol_2021_126388</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0022169421004352</els_id><sourcerecordid>S0022169421004352</sourcerecordid><originalsourceid>FETCH-LOGICAL-c309t-9d23c0fca3cc682a737592832753af8fd8c56f6ea6b5d9309d835a1af08a4e7b3</originalsourceid><addsrcrecordid>eNqFkNtKAzEQhoMoWKuPIOQFds2hm81eiRRPUPBCvQ5pDm3W3U2ZpNX69G6t987NwPx8P8OH0DUlJSVU3LRlu95biF3JCKMlZYJLeYImVNZNwWpSn6IJIYwVVDSzc3SRUkvG4Xw2QfCao1nrlIPBG4gr0H0fhhX2EbDvYrSfOjvA2xy68K1ziAOOHmtsYr_p3Bfut10OBbjkYBcD4LRP2fVjPKRgHRyqIKSP30MGHYacLtGZ111yV397it4f7t_mT8Xi5fF5frcoDCdNLhrLuCHeaG6MkEzXvK4aJjmrK6699FaaSnjhtFhWthkRK3mlqfZE6pmrl3yKqmOvgZgSOK82EHoNe0WJOohTrfoTpw7i1FHcyN0eOTc-twsOVDLBDcbZAM5kZWP4p-EHAgt-HQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Stochastic programming for floodwater utilization of a complex multi-reservoir system considering risk constraints</title><source>ScienceDirect Freedom Collection</source><creator>Lu, Qingwen ; Zhong, Ping-an ; Xu, Bin ; Zhu, Feilin ; Huang, Xin ; Wang, Han ; Ma, Yufei</creator><creatorcontrib>Lu, Qingwen ; Zhong, Ping-an ; Xu, Bin ; Zhu, Feilin ; Huang, Xin ; Wang, Han ; Ma, Yufei</creatorcontrib><description>•Establishing a stochastic programming model for floodwater utilization of a complex multi-reservoir system.•Decomposing the system into four basic subsystems and identifying the excess storage for each subsystem.•Integrating risk constraints into the aggregation-decomposition method.•Introducing risk hedging to offset the risks between reservoirs. Floodwater utilization through dynamic operating flood limited water levels (FLWLs) of reservoirs plays an important role in flood control and water conservation. This study proposes a risk-based aggregation-decomposition method for floodwater utilization of a complex multi-reservoir system. The original system is decomposed into four basic configurations. For the subsystem with hydraulic connections, the upper bound of FLWL of each reservoir is identified based on a given risk level for the subsystem and risk hedging between reservoirs. A stochastic programming model to maximize hydropower generation is then established for joint operation of the multi-reservoir system to find and update the optimal operation strategy during flood seasons. The mixed cascade reservoirs in the Pi River Basin are selected as a case study. The application results are compared with those of the original design model and deterministic operation model without considering risk, which shows that joint operation and dynamic control of FLWLs: 1) significantly increases the power generation and improves the utilization rate of floodwaters compared to those of the original design model; 2) power production rate increases with the acceptable risk but the increasing rate between them decreases with higher levels of risk; 3) results in lower utilization rate of floodwaters compared to that of the deterministic model, but the difference is not significant. The proposed method provides a framework for risk-based decision-making in floodwater utilization to enhance the comprehensive benefits of a multi-reservoir system.</description><identifier>ISSN: 0022-1694</identifier><identifier>EISSN: 1879-2707</identifier><identifier>DOI: 10.1016/j.jhydrol.2021.126388</identifier><language>eng</language><publisher>Elsevier B.V</publisher><subject>Aggregation and decomposition ; Flood limited water level ; Hydropower generation ; Multi-reservoir system ; Risk hedging</subject><ispartof>Journal of hydrology (Amsterdam), 2021-08, Vol.599, p.126388, Article 126388</ispartof><rights>2021 Elsevier B.V.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c309t-9d23c0fca3cc682a737592832753af8fd8c56f6ea6b5d9309d835a1af08a4e7b3</citedby><cites>FETCH-LOGICAL-c309t-9d23c0fca3cc682a737592832753af8fd8c56f6ea6b5d9309d835a1af08a4e7b3</cites><orcidid>0000-0002-1281-5560</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>Lu, Qingwen</creatorcontrib><creatorcontrib>Zhong, Ping-an</creatorcontrib><creatorcontrib>Xu, Bin</creatorcontrib><creatorcontrib>Zhu, Feilin</creatorcontrib><creatorcontrib>Huang, Xin</creatorcontrib><creatorcontrib>Wang, Han</creatorcontrib><creatorcontrib>Ma, Yufei</creatorcontrib><title>Stochastic programming for floodwater utilization of a complex multi-reservoir system considering risk constraints</title><title>Journal of hydrology (Amsterdam)</title><description>•Establishing a stochastic programming model for floodwater utilization of a complex multi-reservoir system.•Decomposing the system into four basic subsystems and identifying the excess storage for each subsystem.•Integrating risk constraints into the aggregation-decomposition method.•Introducing risk hedging to offset the risks between reservoirs. Floodwater utilization through dynamic operating flood limited water levels (FLWLs) of reservoirs plays an important role in flood control and water conservation. This study proposes a risk-based aggregation-decomposition method for floodwater utilization of a complex multi-reservoir system. The original system is decomposed into four basic configurations. For the subsystem with hydraulic connections, the upper bound of FLWL of each reservoir is identified based on a given risk level for the subsystem and risk hedging between reservoirs. A stochastic programming model to maximize hydropower generation is then established for joint operation of the multi-reservoir system to find and update the optimal operation strategy during flood seasons. The mixed cascade reservoirs in the Pi River Basin are selected as a case study. The application results are compared with those of the original design model and deterministic operation model without considering risk, which shows that joint operation and dynamic control of FLWLs: 1) significantly increases the power generation and improves the utilization rate of floodwaters compared to those of the original design model; 2) power production rate increases with the acceptable risk but the increasing rate between them decreases with higher levels of risk; 3) results in lower utilization rate of floodwaters compared to that of the deterministic model, but the difference is not significant. The proposed method provides a framework for risk-based decision-making in floodwater utilization to enhance the comprehensive benefits of a multi-reservoir system.</description><subject>Aggregation and decomposition</subject><subject>Flood limited water level</subject><subject>Hydropower generation</subject><subject>Multi-reservoir system</subject><subject>Risk hedging</subject><issn>0022-1694</issn><issn>1879-2707</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNqFkNtKAzEQhoMoWKuPIOQFds2hm81eiRRPUPBCvQ5pDm3W3U2ZpNX69G6t987NwPx8P8OH0DUlJSVU3LRlu95biF3JCKMlZYJLeYImVNZNwWpSn6IJIYwVVDSzc3SRUkvG4Xw2QfCao1nrlIPBG4gr0H0fhhX2EbDvYrSfOjvA2xy68K1ziAOOHmtsYr_p3Bfut10OBbjkYBcD4LRP2fVjPKRgHRyqIKSP30MGHYacLtGZ111yV397it4f7t_mT8Xi5fF5frcoDCdNLhrLuCHeaG6MkEzXvK4aJjmrK6699FaaSnjhtFhWthkRK3mlqfZE6pmrl3yKqmOvgZgSOK82EHoNe0WJOohTrfoTpw7i1FHcyN0eOTc-twsOVDLBDcbZAM5kZWP4p-EHAgt-HQ</recordid><startdate>202108</startdate><enddate>202108</enddate><creator>Lu, Qingwen</creator><creator>Zhong, Ping-an</creator><creator>Xu, Bin</creator><creator>Zhu, Feilin</creator><creator>Huang, Xin</creator><creator>Wang, Han</creator><creator>Ma, Yufei</creator><general>Elsevier B.V</general><scope>AAYXX</scope><scope>CITATION</scope><orcidid>https://orcid.org/0000-0002-1281-5560</orcidid></search><sort><creationdate>202108</creationdate><title>Stochastic programming for floodwater utilization of a complex multi-reservoir system considering risk constraints</title><author>Lu, Qingwen ; Zhong, Ping-an ; Xu, Bin ; Zhu, Feilin ; Huang, Xin ; Wang, Han ; Ma, Yufei</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c309t-9d23c0fca3cc682a737592832753af8fd8c56f6ea6b5d9309d835a1af08a4e7b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Aggregation and decomposition</topic><topic>Flood limited water level</topic><topic>Hydropower generation</topic><topic>Multi-reservoir system</topic><topic>Risk hedging</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Lu, Qingwen</creatorcontrib><creatorcontrib>Zhong, Ping-an</creatorcontrib><creatorcontrib>Xu, Bin</creatorcontrib><creatorcontrib>Zhu, Feilin</creatorcontrib><creatorcontrib>Huang, Xin</creatorcontrib><creatorcontrib>Wang, Han</creatorcontrib><creatorcontrib>Ma, Yufei</creatorcontrib><collection>CrossRef</collection><jtitle>Journal of hydrology (Amsterdam)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Lu, Qingwen</au><au>Zhong, Ping-an</au><au>Xu, Bin</au><au>Zhu, Feilin</au><au>Huang, Xin</au><au>Wang, Han</au><au>Ma, Yufei</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Stochastic programming for floodwater utilization of a complex multi-reservoir system considering risk constraints</atitle><jtitle>Journal of hydrology (Amsterdam)</jtitle><date>2021-08</date><risdate>2021</risdate><volume>599</volume><spage>126388</spage><pages>126388-</pages><artnum>126388</artnum><issn>0022-1694</issn><eissn>1879-2707</eissn><abstract>•Establishing a stochastic programming model for floodwater utilization of a complex multi-reservoir system.•Decomposing the system into four basic subsystems and identifying the excess storage for each subsystem.•Integrating risk constraints into the aggregation-decomposition method.•Introducing risk hedging to offset the risks between reservoirs. Floodwater utilization through dynamic operating flood limited water levels (FLWLs) of reservoirs plays an important role in flood control and water conservation. This study proposes a risk-based aggregation-decomposition method for floodwater utilization of a complex multi-reservoir system. The original system is decomposed into four basic configurations. For the subsystem with hydraulic connections, the upper bound of FLWL of each reservoir is identified based on a given risk level for the subsystem and risk hedging between reservoirs. A stochastic programming model to maximize hydropower generation is then established for joint operation of the multi-reservoir system to find and update the optimal operation strategy during flood seasons. The mixed cascade reservoirs in the Pi River Basin are selected as a case study. The application results are compared with those of the original design model and deterministic operation model without considering risk, which shows that joint operation and dynamic control of FLWLs: 1) significantly increases the power generation and improves the utilization rate of floodwaters compared to those of the original design model; 2) power production rate increases with the acceptable risk but the increasing rate between them decreases with higher levels of risk; 3) results in lower utilization rate of floodwaters compared to that of the deterministic model, but the difference is not significant. The proposed method provides a framework for risk-based decision-making in floodwater utilization to enhance the comprehensive benefits of a multi-reservoir system.</abstract><pub>Elsevier B.V</pub><doi>10.1016/j.jhydrol.2021.126388</doi><orcidid>https://orcid.org/0000-0002-1281-5560</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 0022-1694
ispartof Journal of hydrology (Amsterdam), 2021-08, Vol.599, p.126388, Article 126388
issn 0022-1694
1879-2707
language eng
recordid cdi_crossref_primary_10_1016_j_jhydrol_2021_126388
source ScienceDirect Freedom Collection
subjects Aggregation and decomposition
Flood limited water level
Hydropower generation
Multi-reservoir system
Risk hedging
title Stochastic programming for floodwater utilization of a complex multi-reservoir system considering risk constraints
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T22%3A10%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-elsevier_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Stochastic%20programming%20for%20floodwater%20utilization%20of%20a%20complex%20multi-reservoir%20system%20considering%20risk%20constraints&rft.jtitle=Journal%20of%20hydrology%20(Amsterdam)&rft.au=Lu,%20Qingwen&rft.date=2021-08&rft.volume=599&rft.spage=126388&rft.pages=126388-&rft.artnum=126388&rft.issn=0022-1694&rft.eissn=1879-2707&rft_id=info:doi/10.1016/j.jhydrol.2021.126388&rft_dat=%3Celsevier_cross%3ES0022169421004352%3C/elsevier_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c309t-9d23c0fca3cc682a737592832753af8fd8c56f6ea6b5d9309d835a1af08a4e7b3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true