Loading…
Performance Modeling and Availability Analysis of Screw Manufacturing Plant
In this research, we focus at the deviation of availability, which is used as a performance measure of screw plant with respect to time. This plantconsistsofnumerous units, viz., header, slotting, thread roller and burnishing unit. These units are operating in sequence. Working, partial failure and...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In this research, we focus at the deviation of availability, which is used as a performance measure of screw plant with respect to time. This plantconsistsofnumerous units, viz., header, slotting, thread roller and burnishing unit. These units are operating in sequence. Working, partial failure and absolute fault are the system's three states. We originated the mathematical model of the plant Using Markov birth - death Process and we solve the differential equation by implementing the matlab tool to determine the availability of the system. Appropriate maintenance planning must be devised, which can be controlled after assessing availability variances over time. The theory of availability analysis will help to increase output and increase screw plant uniformity. We use data and graphical representation to depict the availability of the screw plant as it evolves over time the numerical data are provided for different configurations which are successful in enhancing the availability of the system.. |
---|---|
ISSN: | 2214-7853 2214-7853 |
DOI: | 10.1016/j.matpr.2021.10.170 |