Loading…

A LaBr3: Ce fast-timing array for DESPEC at FAIR

The design of a fast-timing γ-ray detection array aimed at measuring sub-nanosecond half-lives using LaBr3:Ce scintillation crystals is presented. This array will complement novel and existing charged particle and neutron detector arrays at the low-energy branch of a fragment separator (Super-FRS) t...

Full description

Saved in:
Bibliographic Details
Published in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 2014-06, Vol.748, p.91-95
Main Authors: Roberts, Oliver J., Bruce, Alison M., Regan, Patrick H., Podolyák, Zsolt, Townsley, Christopher M., Smith, John F., Mulholland, Kieran F., Smith, Andrew
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The design of a fast-timing γ-ray detection array aimed at measuring sub-nanosecond half-lives using LaBr3:Ce scintillation crystals is presented. This array will complement novel and existing charged particle and neutron detector arrays at the low-energy branch of a fragment separator (Super-FRS) to be built within the NuSTAR collaboration as part of the future Facility for Anti-proton and Ion Research (FAIR). The array will be used in conjunction with the Advanced Implantation Detector Array (AIDA), to measure implant-decay correlations. Monte-Carlo simulations have been performed to determine the design of the proposed fast-timing array around a localised implantation point. In particular, simulations were used to determine the full-energy peak efficiencies for single cylindrical, conical and ‘hybrid’ detector geometries, as well as complete array configurations of ‘hybrid’ and ∅1.5in.×2in. cylindrical crystals. Timing precision calculations were then used to determine the timing response for each configuration based on its simulated efficiency. An informed decision based on the simulated efficiencies and timing precision calculations allowed the optimum configuration for the array to be determined.
ISSN:0168-9002
1872-9576
DOI:10.1016/j.nima.2014.02.037