Loading…

The Mu2e crystal and SiPM calorimeter

The calorimeter of the Mu2e experiment is being assembled, with all production components completed and tested, apart from the digital electronics that is still underway. The mechanical structure is fully built, with a complete integration and test of all the analog sensors and electronics. We summa...

Full description

Saved in:
Bibliographic Details
Published in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 2024-12, Vol.1069, p.169959, Article 169959
Main Authors: Atanov, N., Baranov, V., Bloise, C., Borrel, L., Ceravolo, S., Cervelli, F., Colao, F., Cordelli, G., Corradi, G., Davydov, Yu.I., Di Falco, S., Diociaiuti, E., Donati, S., Echenard, B., Fedeli, P., Ferrari, C., Gioiosa, A., Giovannella, S., Giusti, V., Glagolev, V., Hampai, D., Happacher, F., Hitlin, D.G., Martini, M., Middleton, S., Miscetti, S., Morescalchi, L., Paesani, D., Pasciuto, D., Pedreschi, E., Porter, F., Raffaelli, F., Saputi, A., Sarra, I., Spinella, F., Taffara, A., Zhu, R.Y.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The calorimeter of the Mu2e experiment is being assembled, with all production components completed and tested, apart from the digital electronics that is still underway. The mechanical structure is fully built, with a complete integration and test of all the analog sensors and electronics. We summarize construction and assembly phases, Quality Control tests, calibration procedures and first tests performed in the assembly area, as well as the installation and commissioning plans of the final disks in the Mu2e hall.
ISSN:0168-9002
DOI:10.1016/j.nima.2024.169959