Loading…
Preliminary Study on Reservoir Multi-objective Scheduling Model considering Ecological Regulation
According to the contradiction of power generation, flood control and river ecosystem during the process of reservoir operation, the sub-models of flood prevention, power generation and river ecosystem are established in this paper. The reservoir multi-objective scheduling model considering ecologic...
Saved in:
Published in: | Procedia environmental sciences 2012, Vol.13, p.928-934 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | According to the contradiction of power generation, flood control and river ecosystem during the process of reservoir operation, the sub-models of flood prevention, power generation and river ecosystem are established in this paper. The reservoir multi-objective scheduling model considering ecological regulation are established through multiple objective decision making theory. To reduce the workload and the difficulty of sub-model calculation in multi-objective joint scheduling of reservoir, the results calculated from the sub-model are used as a basis and the functional relationship between reservoir operation parameters and the objectives is established to have the objectives linked, then the joint scheduling multi-objective of reservoir can be used reasonably. |
---|---|
ISSN: | 1878-0296 1878-0296 |
DOI: | 10.1016/j.proenv.2012.01.086 |