Loading…
Minimizing transportation and installation costs for turbines in offshore wind farms
Building an offshore wind energy facility is an undertaking of large capital investment. The cost of such transportation and installation depends on the time to complete these processes. The cost can be minimized by an optimum selection of variables of transportation and installation operations such...
Saved in:
Published in: | Renewable energy 2017-02, Vol.101, p.667-679 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Building an offshore wind energy facility is an undertaking of large capital investment. The cost of such transportation and installation depends on the time to complete these processes. The cost can be minimized by an optimum selection of variables of transportation and installation operations such as onshore pre-assembly of turbines and their rated power outputs. Other factors such as learning rates for lifting and assembly operation, port-to-farm site distance, vessel deck area and lifting rate of the vessel crane have significant effects on the system cost. A model based on these costs is developed for wind turbine installation and transportation in an offshore wind farm, and the impact of decision variables on total cost of transportation and installation is investigated here. The effects of wind farm and vessel parameters on cost are studied such that an optimal set of system parameters is chosen to minimize the total cost of transportation and installation. A numerical analysis is performed to illustrate the model and to understand the general behavior of different system parameters. The results show that the total cost is significantly impacted by turbine size and pre-assembly method. Also, the scheduled maintenance help reduce the cost significantly that the unscheduled maintenance.
•It minimizes transportation and installation cost in wind farms.•Optimum wind farm parameters can be selected.•Choice of decision variables impacts the cost of different operations.•Trade-offs for selecting optimum turbine class and method of installation.•Learning rate is a significant parameter that impacts cost. |
---|---|
ISSN: | 0960-1481 1879-0682 |
DOI: | 10.1016/j.renene.2016.09.014 |