Financial Risk Management in the Planning of Energy Recovery in the Total Site
A two-stage stochastic formulation to plan the implementation of heat integration in the total site over a long-term horizon is presented. Uncertainty in the price of heating utility and the operational level of the plants is considered. Financial risk is introduced and its management is discussed a...
Saved in:
Published in: | Industrial & engineering chemistry research 2003-10, Vol.42 (21), p.5239-5248 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | A two-stage stochastic formulation to plan the implementation of heat integration in the total site over a long-term horizon is presented. Uncertainty in the price of heating utility and the operational level of the plants is considered. Financial risk is introduced and its management is discussed and incorporated into the model. Finally, a multiperiod model for the detailed heat-exchanger location planning is presented. |
---|---|
ISSN: | 0888-5885 1520-5045 |
DOI: | 10.1021/ie020389u |