Probabilistic transmission network planning based on risk criteria

The proposed methodology introduces the risk concept, which takes into consideration the probability of the occurrence of different operating states, the probability of the outage of system elements, and the impact such outages would have on the electric power system (EPS). The impact on the EPS is...

Full description

Saved in:
Bibliographic Details
Published in:IET generation, transmission & distribution transmission & distribution, 2017-06, Vol.11 (8), p.1926-1932
Main Authors: Klančnik, Jurij, Pantoš, Miloš
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The proposed methodology introduces the risk concept, which takes into consideration the probability of the occurrence of different operating states, the probability of the outage of system elements, and the impact such outages would have on the electric power system (EPS). The impact on the EPS is assessed on the basis of a new indicator called impact on the grid, which takes into consideration all overloads caused by the outage of a particular element. The new methodology, based on a risk index, demonstrates the reliability of the EPS and provides background and arguments, useful for transmission system operators taking decisions regarding new investments on the transmission network (TN). The new methodology also contributes multi-selection criteria for determining priorities among individual investments, based on investment costs and on maintaining a sufficient level of reliability.
ISSN:1751-8687
1751-8695
1751-8695
DOI:10.1049/iet-gtd.2016.1133