Loading…

A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system

This paper focuses on a production-scheduling problem in a printed circuit board (PCB) manufacturing system that produces multiple product types with different due dates and different manufacturing processes. In the PCB manufacturing system, there is a number of serial workstations, and there are mu...

Full description

Saved in:
Bibliographic Details
Published in:The Journal of the Operational Research Society 2003-10, Vol.54 (10), p.1038-1049
Main Authors: Lee, G-C, Kim, Y-D, Kim, J-G, Choi, S-H
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper focuses on a production-scheduling problem in a printed circuit board (PCB) manufacturing system that produces multiple product types with different due dates and different manufacturing processes. In the PCB manufacturing system, there is a number of serial workstations, and there are multiple parallel machines at each workstation. Also, setup operations are required at certain workstations or machines, and some product types have re-entrant flows. We develop new dispatching rules for scheduling at each workstation, considering the special features of PCB manufacturing. With the dispatching rules, we determine not only the start time of each lot at a machine but also the batch size of each product at each machine. Simulation experiments are carried out to test the performance of the production-scheduling method and dispatching rules devised in this study. Results show that the production-scheduling method suggested in this study performs better than methods with well-known dispatching rules and heuristic algorithms for lot sizing in terms of the total tardiness of orders.
ISSN:0160-5682
1476-9360
DOI:10.1057/palgrave.jors.2601601