Loading…
Sizing and Costing of Electrostatic Precipitators: Part II: Costing Considerations
This is the second of a two-part article that reviews electrostatic precipitation theory, presents size estimating methods, and gives costing procedures for a variety of electrostatic precipitator (ESP) types and sizes. Part I of the article, which appeared in the April 1988 issue of JAPCA, discusse...
Saved in:
Published in: | JAPCA 1988-05, Vol.38 (5), p.715-726 |
---|---|
Main Authors: | , , , , , , |
Format: | Article |
Language: | English |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This is the second of a two-part article that reviews electrostatic precipitation theory, presents size estimating methods, and gives costing procedures for a variety of electrostatic precipitator (ESP) types and sizes. Part I of the article, which appeared in the April 1988 issue of JAPCA, discussed theory and sizing; this part presents costing. Information is given for estimating total capital investment including separate costs for the bare ESP (five types) and auxiliaries. Factors are given for installation and for indirect costs. Direct and indirect annual costs are discussed. An example problem is given. |
---|---|
ISSN: | 0894-0630 |
DOI: | 10.1080/08940630.1988.10466413 |