Loading…
Framework of overlapping product development activities to maximize profit
Managing the overlapping of product development activities effectively is paramount to shortening lead-time; and hence, it is an important issue in new product development and has been widely studied. To the best of our knowledge, the literature has not yet addressed the topic of maximizing the prod...
Saved in:
Published in: | Journal of industrial and production engineering 2011-12, Vol.28 (8), p.616-627 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | cdi_FETCH-LOGICAL-c284t-6c826f19a65cb0c89065bc14107800daa956546782c3ad689212b085f776f2b53 |
container_end_page | 627 |
container_issue | 8 |
container_start_page | 616 |
container_title | Journal of industrial and production engineering |
container_volume | 28 |
creator | Su, Jack C.P. Chang, Yih-Long Ho, Johnny C. |
description | Managing the overlapping of product development activities effectively is paramount to shortening lead-time; and hence, it is an important issue in new product development and has been widely studied. To the best of our knowledge, the literature has not yet addressed the topic of maximizing the product-development outcome by overlapping. In this article, a dynamic optimal control model is developed to maximize total profit of the product-development project. The closed form solutions are found, from which managerial insights are derived. Using two parameters, namely, evolution speed (slow and fast) and sensitivity (high and low), we create and examine four environments in our study - slow and high (SH), fast and high (FH), slow and low (SL), and fast and low (FL). Findings are obtained and organized into a framework to help with the management of product-development activities. We find that in most difficult environment, SH, the firm should invest in downstream activities lightly; while in the easiest environment, FL, the firm should invest heavily in downstream activities. In environment FH, the firm should postpone the investment in downstream activities to a later stage, start at a lower level, and increase efforts later at a faster pace. On the other hand, in environment SL, the firm should invest earlier, start at a higher level, and increase efforts at a slower pace. Finally, we develop the conditions and scenarios under which the final results and profits will be higher. |
doi_str_mv | 10.1080/10170669.2011.651166 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1080_10170669_2011_651166</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2715772771</sourcerecordid><originalsourceid>FETCH-LOGICAL-c284t-6c826f19a65cb0c89065bc14107800daa956546782c3ad689212b085f776f2b53</originalsourceid><addsrcrecordid>eNp9kMtOwzAURC0EElXpH7CIxDrl2o2vnRVCFeWhSmxgbTmOjQxJHBy3PL6eRIUtq9mcmZEOIecUlhQkXFKgAhDLJQNKl8gpRTwiM0Y5zQUCHpPZhOQTc0oWw-AroCgK4MBn5GETdWs_QnzLgsvC3sZG973vXrI-hnpnUlbbvW1C39ouZdokv_fJ2yFLIWv1p2_9t51Q59MZOXG6GeziN-fkeXPztL7Lt4-39-vrbW6YLFKORjJ0tNTITQVGloC8MrSgICRArXXJkRcoJDMrXaMsGWUVSO6EQMcqvpqTi8PuePu-s0NSr2EXu_FSUWACeAFsoooDZWIYhmid6qNvdfwaITWJU3_i1CROHcSNtatDzXcuxFaPZppaJf3VhOii7owf1OrfhR8I2HOS</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1027054025</pqid></control><display><type>article</type><title>Framework of overlapping product development activities to maximize profit</title><source>Taylor and Francis:Jisc Collections:Taylor and Francis Read and Publish Agreement 2024-2025:Science and Technology Collection (Reading list)</source><creator>Su, Jack C.P. ; Chang, Yih-Long ; Ho, Johnny C.</creator><creatorcontrib>Su, Jack C.P. ; Chang, Yih-Long ; Ho, Johnny C.</creatorcontrib><description>Managing the overlapping of product development activities effectively is paramount to shortening lead-time; and hence, it is an important issue in new product development and has been widely studied. To the best of our knowledge, the literature has not yet addressed the topic of maximizing the product-development outcome by overlapping. In this article, a dynamic optimal control model is developed to maximize total profit of the product-development project. The closed form solutions are found, from which managerial insights are derived. Using two parameters, namely, evolution speed (slow and fast) and sensitivity (high and low), we create and examine four environments in our study - slow and high (SH), fast and high (FH), slow and low (SL), and fast and low (FL). Findings are obtained and organized into a framework to help with the management of product-development activities. We find that in most difficult environment, SH, the firm should invest in downstream activities lightly; while in the easiest environment, FL, the firm should invest heavily in downstream activities. In environment FH, the firm should postpone the investment in downstream activities to a later stage, start at a lower level, and increase efforts later at a faster pace. On the other hand, in environment SL, the firm should invest earlier, start at a higher level, and increase efforts at a slower pace. Finally, we develop the conditions and scenarios under which the final results and profits will be higher.</description><identifier>ISSN: 1017-0669</identifier><identifier>ISSN: 2168-1015</identifier><identifier>EISSN: 2151-7606</identifier><identifier>EISSN: 2168-1023</identifier><identifier>DOI: 10.1080/10170669.2011.651166</identifier><language>eng</language><publisher>Taipei: Taylor & Francis Group</publisher><subject>concurrent engineering ; Control theory ; new product development ; Operations research ; optimal control theory ; overlapping ; Product development ; Studies ; 關键詞: 新產品開發 ; 重疊 ; 同步工程 ; 最佳控制理論</subject><ispartof>Journal of industrial and production engineering, 2011-12, Vol.28 (8), p.616-627</ispartof><rights>Copyright Taylor & Francis Group, LLC 2012</rights><rights>Copyright Taylor & Francis Ltd. Dec 2011</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c284t-6c826f19a65cb0c89065bc14107800daa956546782c3ad689212b085f776f2b53</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Su, Jack C.P.</creatorcontrib><creatorcontrib>Chang, Yih-Long</creatorcontrib><creatorcontrib>Ho, Johnny C.</creatorcontrib><title>Framework of overlapping product development activities to maximize profit</title><title>Journal of industrial and production engineering</title><description>Managing the overlapping of product development activities effectively is paramount to shortening lead-time; and hence, it is an important issue in new product development and has been widely studied. To the best of our knowledge, the literature has not yet addressed the topic of maximizing the product-development outcome by overlapping. In this article, a dynamic optimal control model is developed to maximize total profit of the product-development project. The closed form solutions are found, from which managerial insights are derived. Using two parameters, namely, evolution speed (slow and fast) and sensitivity (high and low), we create and examine four environments in our study - slow and high (SH), fast and high (FH), slow and low (SL), and fast and low (FL). Findings are obtained and organized into a framework to help with the management of product-development activities. We find that in most difficult environment, SH, the firm should invest in downstream activities lightly; while in the easiest environment, FL, the firm should invest heavily in downstream activities. In environment FH, the firm should postpone the investment in downstream activities to a later stage, start at a lower level, and increase efforts later at a faster pace. On the other hand, in environment SL, the firm should invest earlier, start at a higher level, and increase efforts at a slower pace. Finally, we develop the conditions and scenarios under which the final results and profits will be higher.</description><subject>concurrent engineering</subject><subject>Control theory</subject><subject>new product development</subject><subject>Operations research</subject><subject>optimal control theory</subject><subject>overlapping</subject><subject>Product development</subject><subject>Studies</subject><subject>關键詞: 新產品開發 ; 重疊 ; 同步工程 ; 最佳控制理論</subject><issn>1017-0669</issn><issn>2168-1015</issn><issn>2151-7606</issn><issn>2168-1023</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2011</creationdate><recordtype>article</recordtype><recordid>eNp9kMtOwzAURC0EElXpH7CIxDrl2o2vnRVCFeWhSmxgbTmOjQxJHBy3PL6eRIUtq9mcmZEOIecUlhQkXFKgAhDLJQNKl8gpRTwiM0Y5zQUCHpPZhOQTc0oWw-AroCgK4MBn5GETdWs_QnzLgsvC3sZG973vXrI-hnpnUlbbvW1C39ouZdokv_fJ2yFLIWv1p2_9t51Q59MZOXG6GeziN-fkeXPztL7Lt4-39-vrbW6YLFKORjJ0tNTITQVGloC8MrSgICRArXXJkRcoJDMrXaMsGWUVSO6EQMcqvpqTi8PuePu-s0NSr2EXu_FSUWACeAFsoooDZWIYhmid6qNvdfwaITWJU3_i1CROHcSNtatDzXcuxFaPZppaJf3VhOii7owf1OrfhR8I2HOS</recordid><startdate>20111201</startdate><enddate>20111201</enddate><creator>Su, Jack C.P.</creator><creator>Chang, Yih-Long</creator><creator>Ho, Johnny C.</creator><general>Taylor & Francis Group</general><general>Taylor & Francis Ltd</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope></search><sort><creationdate>20111201</creationdate><title>Framework of overlapping product development activities to maximize profit</title><author>Su, Jack C.P. ; Chang, Yih-Long ; Ho, Johnny C.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c284t-6c826f19a65cb0c89065bc14107800daa956546782c3ad689212b085f776f2b53</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2011</creationdate><topic>concurrent engineering</topic><topic>Control theory</topic><topic>new product development</topic><topic>Operations research</topic><topic>optimal control theory</topic><topic>overlapping</topic><topic>Product development</topic><topic>Studies</topic><topic>關键詞: 新產品開發 ; 重疊 ; 同步工程 ; 最佳控制理論</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Su, Jack C.P.</creatorcontrib><creatorcontrib>Chang, Yih-Long</creatorcontrib><creatorcontrib>Ho, Johnny C.</creatorcontrib><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>Journal of industrial and production engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Su, Jack C.P.</au><au>Chang, Yih-Long</au><au>Ho, Johnny C.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Framework of overlapping product development activities to maximize profit</atitle><jtitle>Journal of industrial and production engineering</jtitle><date>2011-12-01</date><risdate>2011</risdate><volume>28</volume><issue>8</issue><spage>616</spage><epage>627</epage><pages>616-627</pages><issn>1017-0669</issn><issn>2168-1015</issn><eissn>2151-7606</eissn><eissn>2168-1023</eissn><abstract>Managing the overlapping of product development activities effectively is paramount to shortening lead-time; and hence, it is an important issue in new product development and has been widely studied. To the best of our knowledge, the literature has not yet addressed the topic of maximizing the product-development outcome by overlapping. In this article, a dynamic optimal control model is developed to maximize total profit of the product-development project. The closed form solutions are found, from which managerial insights are derived. Using two parameters, namely, evolution speed (slow and fast) and sensitivity (high and low), we create and examine four environments in our study - slow and high (SH), fast and high (FH), slow and low (SL), and fast and low (FL). Findings are obtained and organized into a framework to help with the management of product-development activities. We find that in most difficult environment, SH, the firm should invest in downstream activities lightly; while in the easiest environment, FL, the firm should invest heavily in downstream activities. In environment FH, the firm should postpone the investment in downstream activities to a later stage, start at a lower level, and increase efforts later at a faster pace. On the other hand, in environment SL, the firm should invest earlier, start at a higher level, and increase efforts at a slower pace. Finally, we develop the conditions and scenarios under which the final results and profits will be higher.</abstract><cop>Taipei</cop><pub>Taylor & Francis Group</pub><doi>10.1080/10170669.2011.651166</doi><tpages>12</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1017-0669 |
ispartof | Journal of industrial and production engineering, 2011-12, Vol.28 (8), p.616-627 |
issn | 1017-0669 2168-1015 2151-7606 2168-1023 |
language | eng |
recordid | cdi_crossref_primary_10_1080_10170669_2011_651166 |
source | Taylor and Francis:Jisc Collections:Taylor and Francis Read and Publish Agreement 2024-2025:Science and Technology Collection (Reading list) |
subjects | concurrent engineering Control theory new product development Operations research optimal control theory overlapping Product development Studies 關键詞: 新產品開發 重疊 同步工程 最佳控制理論 |
title | Framework of overlapping product development activities to maximize profit |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T01%3A35%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Framework%20of%20overlapping%20product%20development%20activities%20to%20maximize%20profit&rft.jtitle=Journal%20of%20industrial%20and%20production%20engineering&rft.au=Su,%20Jack%20C.P.&rft.date=2011-12-01&rft.volume=28&rft.issue=8&rft.spage=616&rft.epage=627&rft.pages=616-627&rft.issn=1017-0669&rft.eissn=2151-7606&rft_id=info:doi/10.1080/10170669.2011.651166&rft_dat=%3Cproquest_cross%3E2715772771%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c284t-6c826f19a65cb0c89065bc14107800daa956546782c3ad689212b085f776f2b53%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=1027054025&rft_id=info:pmid/&rfr_iscdi=true |