Loading…

Dispatch Problems Due to Ramp Rate Constraints: Bottleneck Analysis and Solutions

This paper proposes a dispatch technique based on the analysis of the system ramp-up/down megawatts (MW). If a dispatch is feasible, it can be shown that the total unavailable ramp-up MW of all the slow units in any future time intervals must be less than or equal to the MW difference between the ma...

Full description

Saved in:
Bibliographic Details
Published in:Electric power components and systems 2003-10, Vol.31 (10), p.995-1006
Main Authors: HAN, X. S., GOOI, H. B., VENKATESH, B.
Format: Article
Language:English
Subjects:
Citations: Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper proposes a dispatch technique based on the analysis of the system ramp-up/down megawatts (MW). If a dispatch is feasible, it can be shown that the total unavailable ramp-up MW of all the slow units in any future time intervals must be less than or equal to the MW difference between the maximum system MW capacity and the load demand at the end of study intervals. Likewise, the same can be said for the total unavailable ramp-down MW of all the slow units. These two constraints can be used to guide the system away from infeasible dispatch.
ISSN:1532-5008
1532-5016
DOI:10.1080/15325000390234463