Loading…

The Analysis of Cost Estimation using Cost Significant Model on Bridge Construction in South Sulawesi

One of the fundamental problems faced by the province of South Sulawesi is the factor of accessibility, so the role of bridges is quite important. For this reason, the budget planning for standard bridge construction projects also needs to be efficient in terms of preparation and accurate in terms o...

Full description

Saved in:
Bibliographic Details
Published in:IOP conference series. Earth and environmental science 2021-11, Vol.921 (1), p.12073
Main Authors: Aprianti, E, Hamzah, S, Abdurrahman, M A
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:One of the fundamental problems faced by the province of South Sulawesi is the factor of accessibility, so the role of bridges is quite important. For this reason, the budget planning for standard bridge construction projects also needs to be efficient in terms of preparation and accurate in terms of budget. The Cost Significant Model is one of the total construction cost estimation models that relies more on the prices that have the most influence on the total project cost as the basis for estimation. In general, this study uses data from steel frame bridge construction projects in South Sulawesi Province to formulate a mathematical model with linear regression analysis so that it can be used in the process of estimating similar projects going forward. The Estimation Model which is formed from the regression analysis and the Cost Significant Model in this study, namely; Y = 3.884 (X7) + 0.989 (X8) - 65515.372. With; Y = Estimated Total Cost (Rp/m); X7 = Reinforcement Work Cost (Rp/m); X8 = Steel Frame Structure Work Cost (Rp/m). Where this model can explain 99.7% of the total project cost with a cost model factor of 1.038. The level of accuracy (percentage error estimate) of the estimation results of the Cost Significant Model in this study ranges from - 1.46% to +2.45%.
ISSN:1755-1307
1755-1315
DOI:10.1088/1755-1315/921/1/012073