Loading…

Risk factors in the refurbishment design process: the case of Malaysia

Purpose>Refurbishment projects are mainly due to building physical improvements and extensive repair work. However, it is more difficult to manage refurbishment compared to new building projects, due to risk factors. Therefore, this paper aims to identify the risk variables in the refurbishment d...

Full description

Saved in:
Bibliographic Details
Published in:International Journal of Building Pathology and Adaptation 2022-12, Vol.40 (4), p.622-635
Main Authors: Ali, Azlan Shah, Au-Yong, Cheong Peng
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c366t-71f953571da735ce1129b7d848bb4172a4758a9126e39d98afe41b09645cbc473
cites cdi_FETCH-LOGICAL-c366t-71f953571da735ce1129b7d848bb4172a4758a9126e39d98afe41b09645cbc473
container_end_page 635
container_issue 4
container_start_page 622
container_title International Journal of Building Pathology and Adaptation
container_volume 40
creator Ali, Azlan Shah
Au-Yong, Cheong Peng
description Purpose>Refurbishment projects are mainly due to building physical improvements and extensive repair work. However, it is more difficult to manage refurbishment compared to new building projects, due to risk factors. Therefore, this paper aims to identify the risk variables in the refurbishment design process and how they influence the design performance variables.Design/methodology/approach>The study has been designed using predominantly the triangulation technique, which consists of quantitative and qualitative approaches to ensure appropriate validation of the data and enabled cross-verification of multiple sources. The research subject was 82 refurbishment projects with the contract value of more than RM 500,000.00. This provided a better view of the risk aspects that affect the design performance of refurbishment projects. Meanwhile, the method of procurement used for the selected refurbishment projects were either traditional or design-and-build. These procurement methods were found to be the most commonly used in refurbishment projects in Malaysia.Findings>This study concludes that the design phase of refurbishment projects is adversely impacted by the risk; whereby variables consisting of services, structural aspects, design fees and clients' attributes affect the design process. Moreover, a prediction model is formulated to estimate the provisional sum of the refurbishment projects. There were two prediction models that have been generated using Statistical Package for Social Science (SPSS). One independent variable of model 1 is not a significant predictor. Thus, another model was produced by using the stepwise method.Originality/value>Despite the fact that the topic of refurbishment has been thoroughly explored by academics and professionals in the past, there is a clear gap which requires clarification in the field of design process and its link to performance of a project. Hence, this paper adds new value to the body of knowledge and widens awareness among the subject audience. There were two prediction models that have been generated using SPSS. Both prediction models were presented in the research.
doi_str_mv 10.1108/IJBPA-01-2021-0005
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1108_IJBPA_01_2021_0005</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2745259448</sourcerecordid><originalsourceid>FETCH-LOGICAL-c366t-71f953571da735ce1129b7d848bb4172a4758a9126e39d98afe41b09645cbc473</originalsourceid><addsrcrecordid>eNo9kE1LAzEQhoMoWGr_gKeA52gmH5vEWy1WKxVF9Byy2ayNtrs12T3037ttxdPMwMPMvA9Cl0CvAai-WTzdvU4JBcIoA0IplSdoxLjRRCgoTv97qs_RJOdYUlaYYYJihOZvMX_j2vmuTRnHBnergFOo-1TGvNqEpsNVyPGzwdvU-pDz7YHwLgfc1vjZrd0uR3eBzmq3zmHyV8foY37_Pnsky5eHxWy6JJ4XRUcU1EZyqaByiksfAJgpVaWFLksBijmhpHYGWBG4qYx2dRBQUlMI6UsvFB-jq-Pe4ZufPuTOfrV9aoaTlikhmTRC6IFiR8qnNuchjd2muHFpZ4HavTJ7UGYp2L0yu1fGfwH3ml1n</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2745259448</pqid></control><display><type>article</type><title>Risk factors in the refurbishment design process: the case of Malaysia</title><source>Alma/SFX Local Collection</source><creator>Ali, Azlan Shah ; Au-Yong, Cheong Peng</creator><creatorcontrib>Ali, Azlan Shah ; Au-Yong, Cheong Peng</creatorcontrib><description>Purpose&gt;Refurbishment projects are mainly due to building physical improvements and extensive repair work. However, it is more difficult to manage refurbishment compared to new building projects, due to risk factors. Therefore, this paper aims to identify the risk variables in the refurbishment design process and how they influence the design performance variables.Design/methodology/approach&gt;The study has been designed using predominantly the triangulation technique, which consists of quantitative and qualitative approaches to ensure appropriate validation of the data and enabled cross-verification of multiple sources. The research subject was 82 refurbishment projects with the contract value of more than RM 500,000.00. This provided a better view of the risk aspects that affect the design performance of refurbishment projects. Meanwhile, the method of procurement used for the selected refurbishment projects were either traditional or design-and-build. These procurement methods were found to be the most commonly used in refurbishment projects in Malaysia.Findings&gt;This study concludes that the design phase of refurbishment projects is adversely impacted by the risk; whereby variables consisting of services, structural aspects, design fees and clients' attributes affect the design process. Moreover, a prediction model is formulated to estimate the provisional sum of the refurbishment projects. There were two prediction models that have been generated using Statistical Package for Social Science (SPSS). One independent variable of model 1 is not a significant predictor. Thus, another model was produced by using the stepwise method.Originality/value&gt;Despite the fact that the topic of refurbishment has been thoroughly explored by academics and professionals in the past, there is a clear gap which requires clarification in the field of design process and its link to performance of a project. Hence, this paper adds new value to the body of knowledge and widens awareness among the subject audience. There were two prediction models that have been generated using SPSS. Both prediction models were presented in the research.</description><identifier>ISSN: 2398-4708</identifier><identifier>EISSN: 2398-4716</identifier><identifier>DOI: 10.1108/IJBPA-01-2021-0005</identifier><language>eng</language><publisher>Bingley: Emerald Group Publishing Limited</publisher><subject>Architects ; Architecture ; Buildings ; Construction contracts ; Decision making ; Design ; Independent variables ; Prediction models ; Procurement ; Qualitative analysis ; Refurbishment ; Risk analysis ; Risk factors ; Triangulation ; Variables</subject><ispartof>International Journal of Building Pathology and Adaptation, 2022-12, Vol.40 (4), p.622-635</ispartof><rights>Emerald Publishing Limited.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c366t-71f953571da735ce1129b7d848bb4172a4758a9126e39d98afe41b09645cbc473</citedby><cites>FETCH-LOGICAL-c366t-71f953571da735ce1129b7d848bb4172a4758a9126e39d98afe41b09645cbc473</cites><orcidid>0000-0003-1306-9595 ; 0000-0003-1923-7473</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Ali, Azlan Shah</creatorcontrib><creatorcontrib>Au-Yong, Cheong Peng</creatorcontrib><title>Risk factors in the refurbishment design process: the case of Malaysia</title><title>International Journal of Building Pathology and Adaptation</title><description>Purpose&gt;Refurbishment projects are mainly due to building physical improvements and extensive repair work. However, it is more difficult to manage refurbishment compared to new building projects, due to risk factors. Therefore, this paper aims to identify the risk variables in the refurbishment design process and how they influence the design performance variables.Design/methodology/approach&gt;The study has been designed using predominantly the triangulation technique, which consists of quantitative and qualitative approaches to ensure appropriate validation of the data and enabled cross-verification of multiple sources. The research subject was 82 refurbishment projects with the contract value of more than RM 500,000.00. This provided a better view of the risk aspects that affect the design performance of refurbishment projects. Meanwhile, the method of procurement used for the selected refurbishment projects were either traditional or design-and-build. These procurement methods were found to be the most commonly used in refurbishment projects in Malaysia.Findings&gt;This study concludes that the design phase of refurbishment projects is adversely impacted by the risk; whereby variables consisting of services, structural aspects, design fees and clients' attributes affect the design process. Moreover, a prediction model is formulated to estimate the provisional sum of the refurbishment projects. There were two prediction models that have been generated using Statistical Package for Social Science (SPSS). One independent variable of model 1 is not a significant predictor. Thus, another model was produced by using the stepwise method.Originality/value&gt;Despite the fact that the topic of refurbishment has been thoroughly explored by academics and professionals in the past, there is a clear gap which requires clarification in the field of design process and its link to performance of a project. Hence, this paper adds new value to the body of knowledge and widens awareness among the subject audience. There were two prediction models that have been generated using SPSS. Both prediction models were presented in the research.</description><subject>Architects</subject><subject>Architecture</subject><subject>Buildings</subject><subject>Construction contracts</subject><subject>Decision making</subject><subject>Design</subject><subject>Independent variables</subject><subject>Prediction models</subject><subject>Procurement</subject><subject>Qualitative analysis</subject><subject>Refurbishment</subject><subject>Risk analysis</subject><subject>Risk factors</subject><subject>Triangulation</subject><subject>Variables</subject><issn>2398-4708</issn><issn>2398-4716</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><sourceid>M0C</sourceid><recordid>eNo9kE1LAzEQhoMoWGr_gKeA52gmH5vEWy1WKxVF9Byy2ayNtrs12T3037ttxdPMwMPMvA9Cl0CvAai-WTzdvU4JBcIoA0IplSdoxLjRRCgoTv97qs_RJOdYUlaYYYJihOZvMX_j2vmuTRnHBnergFOo-1TGvNqEpsNVyPGzwdvU-pDz7YHwLgfc1vjZrd0uR3eBzmq3zmHyV8foY37_Pnsky5eHxWy6JJ4XRUcU1EZyqaByiksfAJgpVaWFLksBijmhpHYGWBG4qYx2dRBQUlMI6UsvFB-jq-Pe4ZufPuTOfrV9aoaTlikhmTRC6IFiR8qnNuchjd2muHFpZ4HavTJ7UGYp2L0yu1fGfwH3ml1n</recordid><startdate>20221206</startdate><enddate>20221206</enddate><creator>Ali, Azlan Shah</creator><creator>Au-Yong, Cheong Peng</creator><general>Emerald Group Publishing Limited</general><scope>AAYXX</scope><scope>CITATION</scope><scope>0U~</scope><scope>1-H</scope><scope>7WY</scope><scope>7WZ</scope><scope>7XB</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FR3</scope><scope>F~G</scope><scope>GNUQQ</scope><scope>HCIFZ</scope><scope>K6~</scope><scope>KR7</scope><scope>L.-</scope><scope>L.0</scope><scope>L6V</scope><scope>M0C</scope><scope>M1Q</scope><scope>M2P</scope><scope>M7S</scope><scope>PQBIZ</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>Q9U</scope><orcidid>https://orcid.org/0000-0003-1306-9595</orcidid><orcidid>https://orcid.org/0000-0003-1923-7473</orcidid></search><sort><creationdate>20221206</creationdate><title>Risk factors in the refurbishment design process: the case of Malaysia</title><author>Ali, Azlan Shah ; Au-Yong, Cheong Peng</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c366t-71f953571da735ce1129b7d848bb4172a4758a9126e39d98afe41b09645cbc473</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>Architects</topic><topic>Architecture</topic><topic>Buildings</topic><topic>Construction contracts</topic><topic>Decision making</topic><topic>Design</topic><topic>Independent variables</topic><topic>Prediction models</topic><topic>Procurement</topic><topic>Qualitative analysis</topic><topic>Refurbishment</topic><topic>Risk analysis</topic><topic>Risk factors</topic><topic>Triangulation</topic><topic>Variables</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Ali, Azlan Shah</creatorcontrib><creatorcontrib>Au-Yong, Cheong Peng</creatorcontrib><collection>CrossRef</collection><collection>Global News &amp; ABI/Inform Professional</collection><collection>Trade PRO</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Global (PDF only)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Business Premium Collection</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>Engineering Research Database</collection><collection>ABI/INFORM Global (Corporate)</collection><collection>ProQuest Central Student</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Business Collection</collection><collection>Civil Engineering Abstracts</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ABI/INFORM Professional Standard</collection><collection>ProQuest Engineering Collection</collection><collection>ABI/INFORM Global</collection><collection>Military Database</collection><collection>Science Database (ProQuest)</collection><collection>Engineering Database</collection><collection>One Business (ProQuest)</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering Collection</collection><collection>ProQuest Central Basic</collection><jtitle>International Journal of Building Pathology and Adaptation</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Ali, Azlan Shah</au><au>Au-Yong, Cheong Peng</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Risk factors in the refurbishment design process: the case of Malaysia</atitle><jtitle>International Journal of Building Pathology and Adaptation</jtitle><date>2022-12-06</date><risdate>2022</risdate><volume>40</volume><issue>4</issue><spage>622</spage><epage>635</epage><pages>622-635</pages><issn>2398-4708</issn><eissn>2398-4716</eissn><abstract>Purpose&gt;Refurbishment projects are mainly due to building physical improvements and extensive repair work. However, it is more difficult to manage refurbishment compared to new building projects, due to risk factors. Therefore, this paper aims to identify the risk variables in the refurbishment design process and how they influence the design performance variables.Design/methodology/approach&gt;The study has been designed using predominantly the triangulation technique, which consists of quantitative and qualitative approaches to ensure appropriate validation of the data and enabled cross-verification of multiple sources. The research subject was 82 refurbishment projects with the contract value of more than RM 500,000.00. This provided a better view of the risk aspects that affect the design performance of refurbishment projects. Meanwhile, the method of procurement used for the selected refurbishment projects were either traditional or design-and-build. These procurement methods were found to be the most commonly used in refurbishment projects in Malaysia.Findings&gt;This study concludes that the design phase of refurbishment projects is adversely impacted by the risk; whereby variables consisting of services, structural aspects, design fees and clients' attributes affect the design process. Moreover, a prediction model is formulated to estimate the provisional sum of the refurbishment projects. There were two prediction models that have been generated using Statistical Package for Social Science (SPSS). One independent variable of model 1 is not a significant predictor. Thus, another model was produced by using the stepwise method.Originality/value&gt;Despite the fact that the topic of refurbishment has been thoroughly explored by academics and professionals in the past, there is a clear gap which requires clarification in the field of design process and its link to performance of a project. Hence, this paper adds new value to the body of knowledge and widens awareness among the subject audience. There were two prediction models that have been generated using SPSS. Both prediction models were presented in the research.</abstract><cop>Bingley</cop><pub>Emerald Group Publishing Limited</pub><doi>10.1108/IJBPA-01-2021-0005</doi><tpages>14</tpages><orcidid>https://orcid.org/0000-0003-1306-9595</orcidid><orcidid>https://orcid.org/0000-0003-1923-7473</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 2398-4708
ispartof International Journal of Building Pathology and Adaptation, 2022-12, Vol.40 (4), p.622-635
issn 2398-4708
2398-4716
language eng
recordid cdi_crossref_primary_10_1108_IJBPA_01_2021_0005
source Alma/SFX Local Collection
subjects Architects
Architecture
Buildings
Construction contracts
Decision making
Design
Independent variables
Prediction models
Procurement
Qualitative analysis
Refurbishment
Risk analysis
Risk factors
Triangulation
Variables
title Risk factors in the refurbishment design process: the case of Malaysia
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T17%3A11%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Risk%20factors%20in%20the%20refurbishment%20design%20process:%20the%20case%20of%20Malaysia&rft.jtitle=International%20Journal%20of%20Building%20Pathology%20and%20Adaptation&rft.au=Ali,%20Azlan%20Shah&rft.date=2022-12-06&rft.volume=40&rft.issue=4&rft.spage=622&rft.epage=635&rft.pages=622-635&rft.issn=2398-4708&rft.eissn=2398-4716&rft_id=info:doi/10.1108/IJBPA-01-2021-0005&rft_dat=%3Cproquest_cross%3E2745259448%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c366t-71f953571da735ce1129b7d848bb4172a4758a9126e39d98afe41b09645cbc473%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2745259448&rft_id=info:pmid/&rfr_iscdi=true