Loading…

Maintenance management of load haul dumper using reliability analysis

Purpose Load haul dumper (LHD) is one of the main ore transporting machineries used in underground mining industry. Reliability of LHD is very significant to achieve the expected targets of production. The performance of the equipment should be maintained at its highest level to fulfill the targets....

Full description

Saved in:
Bibliographic Details
Published in:Journal of quality in maintenance engineering 2020-05, Vol.26 (2), p.290-310
Main Authors: Jakkula, Balaraju, M, Govinda Raj, Ch.S.N, Murthy
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Purpose Load haul dumper (LHD) is one of the main ore transporting machineries used in underground mining industry. Reliability of LHD is very significant to achieve the expected targets of production. The performance of the equipment should be maintained at its highest level to fulfill the targets. This can be accomplished only by reducing the sudden breakdowns of component/subsystems in a complex system. The identification of defective component/subsystems can be possible by performing the downtime analysis. Hence, it is very important to develop the proper maintenance strategies for replacement or repair actions of the defective ones. Suitable maintenance management actions improve the performance of the equipment. This paper aims to discuss this issue. Design/methodology/approach Reliability analysis (renewal approach) has been used to analyze the performance of LHD machine. Allocations of best-fit distribution of data sets were made by the utilization of Kolmogorov–Smirnov (K–S) test. Parametric estimation of theoretical probability distributions was made by utilizing the maximum likelihood estimate (MLE) method. Findings Independent and identical distribution (IID) assumption of data sets was validated through trend and serial correlation tests. On the basis of test results, the data sets are in accordance with IID assumption. Therefore, renewal process approach has been utilized for further investigation. Allocations of best-fit distribution of data sets were made by the utilization of Kolmogorov–Smirnov (K–S) test. Parametric estimation of theoretical probability distributions was made by utilizing the MLE method. Reliability of each individual subsystem has been computed according to the best-fit distribution. In respect of obtained reliability results, the reliability-based preventive maintenance (PM) time schedules were calculated for the expected 90 percent reliability level. Research limitations/implications As the reliability analysis is one of the complex techniques, it requires strategic decision making knowledge for the selection of methodology to be used. As the present case study was from a public sector company, operating under financial constraints the conclusions/findings may not be universally applicable. Originality/value The present study throws light on this equipment that need a tailored maintenance schedule, partly due to the peculiar mining conditions, under which they operate. This study mainly focuses on estimating the perfor
ISSN:1355-2511
1758-7832
DOI:10.1108/JQME-10-2018-0083