Loading…

Equipment qualification in the United Kingdom for the Sizewell 'B' pressurized water reactor

Information is presented regarding the equipment qualification program for Sizewell B, a pressurized water reactor presently being built by the Central Electricity Generating Board in Suffolk, England with commercial operation scheduled for 1994. The program is being established in accordance with I...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on energy conversion 1989-03, Vol.4 (1), p.62-67
Main Authors: Achenbach, J.A., Hayward, A.D., Slinn, H.
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Information is presented regarding the equipment qualification program for Sizewell B, a pressurized water reactor presently being built by the Central Electricity Generating Board in Suffolk, England with commercial operation scheduled for 1994. The program is being established in accordance with IEEE Standards 627-1980, 323-1983 and 344-1975. Specific differences between testing performed in the US and those intended for Sizewell B are highlighted, with the reasons behind such differences explained.< >
ISSN:0885-8969
1558-0059
DOI:10.1109/60.23151