Loading…
Switckgear and Control Features of Enlarged High-Power Testing Laboratory
Higher capacity testing facilities are being put into service at the Westinghouse Electric Corporation high-power testing laboratories at East Pittsburgh. This paper deals primarily with some of the switchgear and control features of the increased capacity facility.
Saved in:
Published in: | IEEE transactions on power apparatus and systems 1963-08, Vol.82 (67), p.521-527 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Higher capacity testing facilities are being put into service at the Westinghouse Electric Corporation high-power testing laboratories at East Pittsburgh. This paper deals primarily with some of the switchgear and control features of the increased capacity facility. |
---|---|
ISSN: | 0018-9510 2995-6323 |
DOI: | 10.1109/TPAS.1963.291444 |