Loading…

Switckgear and Control Features of Enlarged High-Power Testing Laboratory

Higher capacity testing facilities are being put into service at the Westinghouse Electric Corporation high-power testing laboratories at East Pittsburgh. This paper deals primarily with some of the switchgear and control features of the increased capacity facility.

Saved in:
Bibliographic Details
Published in:IEEE transactions on power apparatus and systems 1963-08, Vol.82 (67), p.521-527
Main Authors: Batten, W. B., Baumgartner, R. P., Champney, G. W., Fish, W. A., Walker, J. P.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Higher capacity testing facilities are being put into service at the Westinghouse Electric Corporation high-power testing laboratories at East Pittsburgh. This paper deals primarily with some of the switchgear and control features of the increased capacity facility.
ISSN:0018-9510
2995-6323
DOI:10.1109/TPAS.1963.291444