Loading…

Testing of Gas Insulated Substations and Transmission Systems

This paper discusses those tests believed necessary in both factory and field to assure safe and reliable performance in a sulphur hexafluoride (SF6) gas insulated system. Design tests on prototype components, routine factory production tests and field tests immediately prior to placing the system i...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on power apparatus and systems 1974-01, Vol.PAS-93 (1), p.404-413
Main Authors: Graybill, H. W., Cronin, J. C., Field, E. J.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper discusses those tests believed necessary in both factory and field to assure safe and reliable performance in a sulphur hexafluoride (SF6) gas insulated system. Design tests on prototype components, routine factory production tests and field tests immediately prior to placing the system in service are discussed. Primary emphasis is given to dielectric testing, because of the importance of dielectric considerations to system integrity. Actual test experience on five installations now in service is discussed.
ISSN:0018-9510
2995-6323
DOI:10.1109/TPAS.1974.293961