Loading…

Evaluation of the Cost of Losses for Underground Transmission Cable Systems

This paper discusses issues related to the evaluation of cost of losses for underground power transmission cable systems. The first section of this paper reviews the need for cable system cost of losses evaluation. Cable characteristics, utility system issues, and economic factors relevant to the ev...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on power apparatus and systems 1983-10, Vol.PAS-102 (10), p.3348-3357
Main Authors: Walldorf, Steven P., Eich, Edward D.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper discusses issues related to the evaluation of cost of losses for underground power transmission cable systems. The first section of this paper reviews the need for cable system cost of losses evaluation. Cable characteristics, utility system issues, and economic factors relevant to the evaluation of losses are then presented and aspects which might have a significant effect on loss evaluation are highlighted. Currently used evaluation methods are briefly reviewed and the "present worth of annual revenue requirements" evaluation method is presented in more detail. Final discussion considers how much detail is required in a cost of losses evaluation and how the cost of losses information can be used.
ISSN:0018-9510
2995-6323
DOI:10.1109/TPAS.1983.317831