Loading…
Evaluation of the Cost of Losses for Underground Transmission Cable Systems
This paper discusses issues related to the evaluation of cost of losses for underground power transmission cable systems. The first section of this paper reviews the need for cable system cost of losses evaluation. Cable characteristics, utility system issues, and economic factors relevant to the ev...
Saved in:
Published in: | IEEE transactions on power apparatus and systems 1983-10, Vol.PAS-102 (10), p.3348-3357 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This paper discusses issues related to the evaluation of cost of losses for underground power transmission cable systems. The first section of this paper reviews the need for cable system cost of losses evaluation. Cable characteristics, utility system issues, and economic factors relevant to the evaluation of losses are then presented and aspects which might have a significant effect on loss evaluation are highlighted. Currently used evaluation methods are briefly reviewed and the "present worth of annual revenue requirements" evaluation method is presented in more detail. Final discussion considers how much detail is required in a cost of losses evaluation and how the cost of losses information can be used. |
---|---|
ISSN: | 0018-9510 2995-6323 |
DOI: | 10.1109/TPAS.1983.317831 |