Loading…
Cost/utilization: a measure of system performance
A method is presented for evaluating computer system performance in terms of a cost/utilization factor and a measure of imbalance. These coefficients indicate the extent to which the total system cost is effectively utilized. The method includes a technique for the visual representation of system pe...
Saved in:
Published in: | Communications of the ACM 1977-03, Vol.20 (3), p.185-191 |
---|---|
Main Authors: | , |
Format: | Magazinearticle |
Language: | English |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | A method is presented for evaluating computer system performance in terms of a cost/utilization factor and a measure of imbalance. These coefficients indicate the extent to which the total system cost is effectively utilized. The method includes a technique for the visual representation of system performance. |
---|---|
ISSN: | 0001-0782 1557-7317 |
DOI: | 10.1145/359436.359452 |