Rose Fitzgerald Kennedy Bridge Over the River Barrow: Design and Construction of a Multispan Extrados Concrete Bridge

The Rose Fitzgerald Kennedy Bridge spans the River Barrow with two 230-m (755-ft) long main spans. It is an extradosed bridge with three towers, and four spans that are supported by cables in addition to several approach spans to complete the 887 m (2,910 ft) length of the whole superstructure. The...

Full description

Saved in:
Bibliographic Details
Published in:Transportation research record 2022-12
Main Authors: Astiz Suarez, Miguel Angel, Sanchez, Marcos, Blanco Martin, Lucia, Ayuso Calle, Guillermo, Long, Cian
Format: Article
Language:English
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c127t-109bc9c0dfd214d6205b1c94339a61712f8e4ccb7645b093e80fa97dd9f6b4193
container_end_page
container_issue
container_start_page
container_title Transportation research record
container_volume
creator Astiz Suarez, Miguel Angel
Sanchez, Marcos
Blanco Martin, Lucia
Ayuso Calle, Guillermo
Long, Cian
description The Rose Fitzgerald Kennedy Bridge spans the River Barrow with two 230-m (755-ft) long main spans. It is an extradosed bridge with three towers, and four spans that are supported by cables in addition to several approach spans to complete the 887 m (2,910 ft) length of the whole superstructure. The design paid special attention to landscape integration, durability, and planning requirements. The analysis was required to address challenges related to structural efficiency under service loads and local code considerations, wind effects on traffic, ship collisions, and fire events analysis as well as construction issues related to the extreme slenderness of the superstructure. The design decision-making process and value engineering were heavily constrained by the contract requirements, which led to a solution that slightly departed from pure engineering optimization but that allowed for the addressing of local requirements and integration with the surroundings. This paper presents a case in which engineers had to comply with specifications set by the Administration, which did not correspond to optimum economic engineering solutions. Other criteria such as the aesthetics or ensuring minimum disruption to the landscape are also valuable, especially in the long term, and may drive engineers to nonstandard proposals.
doi_str_mv 10.1177/03611981221131537
format article
fullrecord <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_1177_03611981221131537</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_1177_03611981221131537</sourcerecordid><originalsourceid>FETCH-LOGICAL-c127t-109bc9c0dfd214d6205b1c94339a61712f8e4ccb7645b093e80fa97dd9f6b4193</originalsourceid><addsrcrecordid>eNplkM1KAzEYRYMoWKsP4C4vMJovyUwad7a2KlYKRddDJj81MiYlSdX69DLYnat74R7O4iJ0CeQKQIhrwhoAOQFKARjUTByhEYVGVpzU9BiNhr0agFN0lvM7IYxxwUZot47Z4oUvPxubVG_wkw3Bmj2eJm82Fq8-bcLlzeK1H9pUpRS_bvCdzX4TsAoGz2LIJe108THg6LDCz7u--LxVAc-_S1Im5gHSyRZ70J6jE6f6bC8OOUavi_nL7KFaru4fZ7fLSgMVpQIiOy01Mc5Q4KahpO5AS86YVA0IoG5iudadaHjdEcnshDglhTHSNR0HycYI_rw6xZyTde02-Q-V9i2Qdvit_fcb-wXVdWCl</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Rose Fitzgerald Kennedy Bridge Over the River Barrow: Design and Construction of a Multispan Extrados Concrete Bridge</title><source>Sage Journals Online</source><creator>Astiz Suarez, Miguel Angel ; Sanchez, Marcos ; Blanco Martin, Lucia ; Ayuso Calle, Guillermo ; Long, Cian</creator><creatorcontrib>Astiz Suarez, Miguel Angel ; Sanchez, Marcos ; Blanco Martin, Lucia ; Ayuso Calle, Guillermo ; Long, Cian</creatorcontrib><description>The Rose Fitzgerald Kennedy Bridge spans the River Barrow with two 230-m (755-ft) long main spans. It is an extradosed bridge with three towers, and four spans that are supported by cables in addition to several approach spans to complete the 887 m (2,910 ft) length of the whole superstructure. The design paid special attention to landscape integration, durability, and planning requirements. The analysis was required to address challenges related to structural efficiency under service loads and local code considerations, wind effects on traffic, ship collisions, and fire events analysis as well as construction issues related to the extreme slenderness of the superstructure. The design decision-making process and value engineering were heavily constrained by the contract requirements, which led to a solution that slightly departed from pure engineering optimization but that allowed for the addressing of local requirements and integration with the surroundings. This paper presents a case in which engineers had to comply with specifications set by the Administration, which did not correspond to optimum economic engineering solutions. Other criteria such as the aesthetics or ensuring minimum disruption to the landscape are also valuable, especially in the long term, and may drive engineers to nonstandard proposals.</description><identifier>ISSN: 0361-1981</identifier><identifier>EISSN: 2169-4052</identifier><identifier>DOI: 10.1177/03611981221131537</identifier><language>eng</language><ispartof>Transportation research record, 2022-12</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c127t-109bc9c0dfd214d6205b1c94339a61712f8e4ccb7645b093e80fa97dd9f6b4193</cites><orcidid>0000-0002-9614-2593 ; 0000-0002-4070-215X</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Astiz Suarez, Miguel Angel</creatorcontrib><creatorcontrib>Sanchez, Marcos</creatorcontrib><creatorcontrib>Blanco Martin, Lucia</creatorcontrib><creatorcontrib>Ayuso Calle, Guillermo</creatorcontrib><creatorcontrib>Long, Cian</creatorcontrib><title>Rose Fitzgerald Kennedy Bridge Over the River Barrow: Design and Construction of a Multispan Extrados Concrete Bridge</title><title>Transportation research record</title><description>The Rose Fitzgerald Kennedy Bridge spans the River Barrow with two 230-m (755-ft) long main spans. It is an extradosed bridge with three towers, and four spans that are supported by cables in addition to several approach spans to complete the 887 m (2,910 ft) length of the whole superstructure. The design paid special attention to landscape integration, durability, and planning requirements. The analysis was required to address challenges related to structural efficiency under service loads and local code considerations, wind effects on traffic, ship collisions, and fire events analysis as well as construction issues related to the extreme slenderness of the superstructure. The design decision-making process and value engineering were heavily constrained by the contract requirements, which led to a solution that slightly departed from pure engineering optimization but that allowed for the addressing of local requirements and integration with the surroundings. This paper presents a case in which engineers had to comply with specifications set by the Administration, which did not correspond to optimum economic engineering solutions. Other criteria such as the aesthetics or ensuring minimum disruption to the landscape are also valuable, especially in the long term, and may drive engineers to nonstandard proposals.</description><issn>0361-1981</issn><issn>2169-4052</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><recordid>eNplkM1KAzEYRYMoWKsP4C4vMJovyUwad7a2KlYKRddDJj81MiYlSdX69DLYnat74R7O4iJ0CeQKQIhrwhoAOQFKARjUTByhEYVGVpzU9BiNhr0agFN0lvM7IYxxwUZot47Z4oUvPxubVG_wkw3Bmj2eJm82Fq8-bcLlzeK1H9pUpRS_bvCdzX4TsAoGz2LIJe108THg6LDCz7u--LxVAc-_S1Im5gHSyRZ70J6jE6f6bC8OOUavi_nL7KFaru4fZ7fLSgMVpQIiOy01Mc5Q4KahpO5AS86YVA0IoG5iudadaHjdEcnshDglhTHSNR0HycYI_rw6xZyTde02-Q-V9i2Qdvit_fcb-wXVdWCl</recordid><startdate>20221221</startdate><enddate>20221221</enddate><creator>Astiz Suarez, Miguel Angel</creator><creator>Sanchez, Marcos</creator><creator>Blanco Martin, Lucia</creator><creator>Ayuso Calle, Guillermo</creator><creator>Long, Cian</creator><scope>AAYXX</scope><scope>CITATION</scope><orcidid>https://orcid.org/0000-0002-9614-2593</orcidid><orcidid>https://orcid.org/0000-0002-4070-215X</orcidid></search><sort><creationdate>20221221</creationdate><title>Rose Fitzgerald Kennedy Bridge Over the River Barrow: Design and Construction of a Multispan Extrados Concrete Bridge</title><author>Astiz Suarez, Miguel Angel ; Sanchez, Marcos ; Blanco Martin, Lucia ; Ayuso Calle, Guillermo ; Long, Cian</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c127t-109bc9c0dfd214d6205b1c94339a61712f8e4ccb7645b093e80fa97dd9f6b4193</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Astiz Suarez, Miguel Angel</creatorcontrib><creatorcontrib>Sanchez, Marcos</creatorcontrib><creatorcontrib>Blanco Martin, Lucia</creatorcontrib><creatorcontrib>Ayuso Calle, Guillermo</creatorcontrib><creatorcontrib>Long, Cian</creatorcontrib><collection>CrossRef</collection><jtitle>Transportation research record</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Astiz Suarez, Miguel Angel</au><au>Sanchez, Marcos</au><au>Blanco Martin, Lucia</au><au>Ayuso Calle, Guillermo</au><au>Long, Cian</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Rose Fitzgerald Kennedy Bridge Over the River Barrow: Design and Construction of a Multispan Extrados Concrete Bridge</atitle><jtitle>Transportation research record</jtitle><date>2022-12-21</date><risdate>2022</risdate><issn>0361-1981</issn><eissn>2169-4052</eissn><abstract>The Rose Fitzgerald Kennedy Bridge spans the River Barrow with two 230-m (755-ft) long main spans. It is an extradosed bridge with three towers, and four spans that are supported by cables in addition to several approach spans to complete the 887 m (2,910 ft) length of the whole superstructure. The design paid special attention to landscape integration, durability, and planning requirements. The analysis was required to address challenges related to structural efficiency under service loads and local code considerations, wind effects on traffic, ship collisions, and fire events analysis as well as construction issues related to the extreme slenderness of the superstructure. The design decision-making process and value engineering were heavily constrained by the contract requirements, which led to a solution that slightly departed from pure engineering optimization but that allowed for the addressing of local requirements and integration with the surroundings. This paper presents a case in which engineers had to comply with specifications set by the Administration, which did not correspond to optimum economic engineering solutions. Other criteria such as the aesthetics or ensuring minimum disruption to the landscape are also valuable, especially in the long term, and may drive engineers to nonstandard proposals.</abstract><doi>10.1177/03611981221131537</doi><orcidid>https://orcid.org/0000-0002-9614-2593</orcidid><orcidid>https://orcid.org/0000-0002-4070-215X</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 0361-1981
ispartof Transportation research record, 2022-12
issn 0361-1981
2169-4052
language eng
recordid cdi_crossref_primary_10_1177_03611981221131537
source Sage Journals Online
title Rose Fitzgerald Kennedy Bridge Over the River Barrow: Design and Construction of a Multispan Extrados Concrete Bridge
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T05%3A50%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Rose%20Fitzgerald%20Kennedy%20Bridge%20Over%20the%20River%20Barrow:%20Design%20and%20Construction%20of%20a%20Multispan%20Extrados%20Concrete%20Bridge&rft.jtitle=Transportation%20research%20record&rft.au=Astiz%20Suarez,%20Miguel%20Angel&rft.date=2022-12-21&rft.issn=0361-1981&rft.eissn=2169-4052&rft_id=info:doi/10.1177/03611981221131537&rft_dat=%3Ccrossref%3E10_1177_03611981221131537%3C/crossref%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c127t-109bc9c0dfd214d6205b1c94339a61712f8e4ccb7645b093e80fa97dd9f6b4193%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true