Loading…
The Repairman Problem Revisited
We use a probabilistic model to show that the development of a large number of small production units facing independent risks of failure must be accompanied by an approximately proportional increase in the number of repairmen. We derive the cost function of a machine in working condition, which inc...
Saved in:
Published in: | Annals of economics and statistics 2016-06 (121/122), p.7-24 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | We use a probabilistic model to show that the development of a large number of small production units facing independent risks of failure must be accompanied by an approximately proportional increase in the number of repairmen. We derive the cost function of a machine in working condition, which increases with the cost of an installed machine and with the repair cost and failure probability, and decreases with repairman efficiency. We provide a very simple proof and generalize the results of Arrow
et al. (1972). We also show that it is redundant to require installers to hire the number of repairmen necessary to reach a fixed availability level for each installed machine.
JEL: C61, D24, J3, O33. / KEY WORDS: Failure, Repair, Markov Chain, Hicks-Leontiev Technology. |
---|---|
ISSN: | 2115-4430 1968-3863 |
DOI: | 10.15609/annaeconstat2009.121-122.7 |