Loading…
Development of Composite Quality Measures
Statistical construction specifications based on multiple quality characteristics frequently use pay equations that include a separate term for each of the quality characteristics so that the resultant pay adjustment is a function of the combined effect of all quality measures. An alternate method t...
Saved in:
Published in: | Transportation research record 2000, Vol.1712 (1), p.103-108 |
---|---|
Main Author: | |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c223t-67b683a555a883ad7bd0a3375e050b6c523fe3b905ebfc4ebf0164d95253cf683 |
---|---|
cites | cdi_FETCH-LOGICAL-c223t-67b683a555a883ad7bd0a3375e050b6c523fe3b905ebfc4ebf0164d95253cf683 |
container_end_page | 108 |
container_issue | 1 |
container_start_page | 103 |
container_title | Transportation research record |
container_volume | 1712 |
creator | Weed, Richard M. |
description | Statistical construction specifications based on multiple quality characteristics frequently use pay equations that include a separate term for each of the quality characteristics so that the resultant pay adjustment is a function of the combined effect of all quality measures. An alternate method that can be used to accomplish the same purpose is to base the pay equation on a single quality measure that is a composite of the individual quality measures. The latter approach, because it keys the various decision-making steps to a single performance indicator, simplifies the procedure and offers several practical advantages. It is believed that this approach makes significant strides toward the ultimate goal of developing quality assurance procedures that are at the same time technically sound, fair and effective, and easy to understand and apply. Examples of a two-variable case for hot-mix asphalt pavement and a general three-variable case are presented. |
doi_str_mv | 10.3141/1712-13 |
format | article |
fullrecord | <record><control><sourceid>sage_cross</sourceid><recordid>TN_cdi_crossref_primary_10_3141_1712_13</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.3141_1712-13</sage_id><sourcerecordid>10.3141_1712-13</sourcerecordid><originalsourceid>FETCH-LOGICAL-c223t-67b683a555a883ad7bd0a3375e050b6c523fe3b905ebfc4ebf0164d95253cf683</originalsourceid><addsrcrecordid>eNplj01LxDAYhIMoWFfxLxQUxEM0b94mbY-yfsKKCHoOaZpIl36RtML-e7NUvHiZuTwzzBByDuwGIYNbyIFTwAOScJAlzZjghyRhKIFCWcAxOQlhyxhilmNCru_tt22HsbP9lA4uXQ_dOIRmsun7rNtm2qWvVofZ23BKjpxugz379RX5fHz4WD_TzdvTy_puQw3nOFGZV7JALYTQRfQ6r2qmEXNhmWCVNIKjs1iVTNjKmSwKA5nVpeACjYvRFblaeo0fQvDWqdE3nfY7BUztH6r9QwUYyYuFHHUwunVe96YJf3ghMihFpC4XKugvq7bD7Ps4_1_ZD-ErWSU</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Development of Composite Quality Measures</title><source>SAGE:Jisc Collections:SAGE Journals Read and Publish 2023-2024:2025 extension (reading list)</source><creator>Weed, Richard M.</creator><creatorcontrib>Weed, Richard M.</creatorcontrib><description>Statistical construction specifications based on multiple quality characteristics frequently use pay equations that include a separate term for each of the quality characteristics so that the resultant pay adjustment is a function of the combined effect of all quality measures. An alternate method that can be used to accomplish the same purpose is to base the pay equation on a single quality measure that is a composite of the individual quality measures. The latter approach, because it keys the various decision-making steps to a single performance indicator, simplifies the procedure and offers several practical advantages. It is believed that this approach makes significant strides toward the ultimate goal of developing quality assurance procedures that are at the same time technically sound, fair and effective, and easy to understand and apply. Examples of a two-variable case for hot-mix asphalt pavement and a general three-variable case are presented.</description><identifier>ISSN: 0361-1981</identifier><identifier>EISSN: 2169-4052</identifier><identifier>DOI: 10.3141/1712-13</identifier><identifier>CODEN: TRREDM</identifier><language>eng</language><publisher>Los Angeles, CA: SAGE Publications</publisher><subject>Applied sciences ; Building economics. Cost ; Buildings. Public works ; Exact sciences and technology ; Road construction. Pavements. Maintenance ; Transportation infrastructure</subject><ispartof>Transportation research record, 2000, Vol.1712 (1), p.103-108</ispartof><rights>2000 National Academy of Sciences</rights><rights>2001 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c223t-67b683a555a883ad7bd0a3375e050b6c523fe3b905ebfc4ebf0164d95253cf683</citedby><cites>FETCH-LOGICAL-c223t-67b683a555a883ad7bd0a3375e050b6c523fe3b905ebfc4ebf0164d95253cf683</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>309,310,314,776,780,785,786,4010,4036,4037,23909,23910,25118,27900,27901,27902</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=854195$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Weed, Richard M.</creatorcontrib><title>Development of Composite Quality Measures</title><title>Transportation research record</title><description>Statistical construction specifications based on multiple quality characteristics frequently use pay equations that include a separate term for each of the quality characteristics so that the resultant pay adjustment is a function of the combined effect of all quality measures. An alternate method that can be used to accomplish the same purpose is to base the pay equation on a single quality measure that is a composite of the individual quality measures. The latter approach, because it keys the various decision-making steps to a single performance indicator, simplifies the procedure and offers several practical advantages. It is believed that this approach makes significant strides toward the ultimate goal of developing quality assurance procedures that are at the same time technically sound, fair and effective, and easy to understand and apply. Examples of a two-variable case for hot-mix asphalt pavement and a general three-variable case are presented.</description><subject>Applied sciences</subject><subject>Building economics. Cost</subject><subject>Buildings. Public works</subject><subject>Exact sciences and technology</subject><subject>Road construction. Pavements. Maintenance</subject><subject>Transportation infrastructure</subject><issn>0361-1981</issn><issn>2169-4052</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2000</creationdate><recordtype>article</recordtype><recordid>eNplj01LxDAYhIMoWFfxLxQUxEM0b94mbY-yfsKKCHoOaZpIl36RtML-e7NUvHiZuTwzzBByDuwGIYNbyIFTwAOScJAlzZjghyRhKIFCWcAxOQlhyxhilmNCru_tt22HsbP9lA4uXQ_dOIRmsun7rNtm2qWvVofZ23BKjpxugz379RX5fHz4WD_TzdvTy_puQw3nOFGZV7JALYTQRfQ6r2qmEXNhmWCVNIKjs1iVTNjKmSwKA5nVpeACjYvRFblaeo0fQvDWqdE3nfY7BUztH6r9QwUYyYuFHHUwunVe96YJf3ghMihFpC4XKugvq7bD7Ps4_1_ZD-ErWSU</recordid><startdate>2000</startdate><enddate>2000</enddate><creator>Weed, Richard M.</creator><general>SAGE Publications</general><general>National Research Council</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>2000</creationdate><title>Development of Composite Quality Measures</title><author>Weed, Richard M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c223t-67b683a555a883ad7bd0a3375e050b6c523fe3b905ebfc4ebf0164d95253cf683</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2000</creationdate><topic>Applied sciences</topic><topic>Building economics. Cost</topic><topic>Buildings. Public works</topic><topic>Exact sciences and technology</topic><topic>Road construction. Pavements. Maintenance</topic><topic>Transportation infrastructure</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Weed, Richard M.</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><jtitle>Transportation research record</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Weed, Richard M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Development of Composite Quality Measures</atitle><jtitle>Transportation research record</jtitle><date>2000</date><risdate>2000</risdate><volume>1712</volume><issue>1</issue><spage>103</spage><epage>108</epage><pages>103-108</pages><issn>0361-1981</issn><eissn>2169-4052</eissn><coden>TRREDM</coden><abstract>Statistical construction specifications based on multiple quality characteristics frequently use pay equations that include a separate term for each of the quality characteristics so that the resultant pay adjustment is a function of the combined effect of all quality measures. An alternate method that can be used to accomplish the same purpose is to base the pay equation on a single quality measure that is a composite of the individual quality measures. The latter approach, because it keys the various decision-making steps to a single performance indicator, simplifies the procedure and offers several practical advantages. It is believed that this approach makes significant strides toward the ultimate goal of developing quality assurance procedures that are at the same time technically sound, fair and effective, and easy to understand and apply. Examples of a two-variable case for hot-mix asphalt pavement and a general three-variable case are presented.</abstract><cop>Los Angeles, CA</cop><pub>SAGE Publications</pub><doi>10.3141/1712-13</doi><tpages>6</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0361-1981 |
ispartof | Transportation research record, 2000, Vol.1712 (1), p.103-108 |
issn | 0361-1981 2169-4052 |
language | eng |
recordid | cdi_crossref_primary_10_3141_1712_13 |
source | SAGE:Jisc Collections:SAGE Journals Read and Publish 2023-2024:2025 extension (reading list) |
subjects | Applied sciences Building economics. Cost Buildings. Public works Exact sciences and technology Road construction. Pavements. Maintenance Transportation infrastructure |
title | Development of Composite Quality Measures |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T15%3A42%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-sage_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Development%20of%20Composite%20Quality%20Measures&rft.jtitle=Transportation%20research%20record&rft.au=Weed,%20Richard%20M.&rft.date=2000&rft.volume=1712&rft.issue=1&rft.spage=103&rft.epage=108&rft.pages=103-108&rft.issn=0361-1981&rft.eissn=2169-4052&rft.coden=TRREDM&rft_id=info:doi/10.3141/1712-13&rft_dat=%3Csage_cross%3E10.3141_1712-13%3C/sage_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c223t-67b683a555a883ad7bd0a3375e050b6c523fe3b905ebfc4ebf0164d95253cf683%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rft_sage_id=10.3141_1712-13&rfr_iscdi=true |