Loading…
Geotechnical investigations for defining the building conditions of the new quarry crusher plant in Bor
Geotechnical investigations were conducted at the construction site of the new crushing plant at the open pit "Kriveljski kamen" in Bor. The construction of parts of this plant is planned on an unstable slope. The aim was to define the lithological-geotechnical material and terrain structu...
Saved in:
Published in: | Mining and Metallurgy Engineering Bor 2021, Vol.2021 (1-2), p.13-16 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Geotechnical investigations were conducted at the construction site of the new crushing plant at the open pit "Kriveljski kamen" in Bor. The construction of parts of this plant is planned on an unstable slope. The aim was to define the lithological-geotechnical material and terrain structure as a basis for determining the optimal conditions of construction, excavation methods, funding and undertaking the reclamation measures in the area intended for accommodation of facilities. |
---|---|
ISSN: | 2334-8836 2406-1395 |
DOI: | 10.5937/mmeb2101013T |