Loading…
Riskiness of value-creating corporate activities and their influence on strategic management of engineering companies
This paper presents a procedure for definition and analysis of value-creating corporate activities on an example of a selected engineering company and a newly proposed calculation of riskiness of the production process. The risk calculation is based on an analysis of the value chain or value stream...
Saved in:
Published in: | Entrepreneurship and Sustainability Issues 2023-03, Vol.10 (3), p.383-398 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This paper presents a procedure for definition and analysis of value-creating corporate activities on an example of a selected engineering company and a newly proposed calculation of riskiness of the production process. The risk calculation is based on an analysis of the value chain or value stream of its primary activities. Three research questions were formulated within the framework of the solution concerning differentiation of the value stream in serial and custom production, significance of individual primary processes for creation of the corporate margin and differentiation of the degree of risk between serial and custom production. The obtained outputs from the model engineering enterprise showed that the intensity of added value creation is lower in serial production than in custom production. In terms of the importance of the primary activities for serial and custom production in the value chain, the production process can be considered dominant from the viewpoint of margin generation, followed by the technical preparation process. In addition to the already mentioned reduced level of generation of added value, the lower average riskiness of the production process was also found for serial production compared to custom production. The graphical presentation at the end of the paper suggests a correlation between the level of added value creation in partial production operations and their respective level of risk. The authors of the article assume that the presented results have general validity for engineering production enterprises, which will be the subject of follow-up case studies on similar topics. |
---|---|
ISSN: | 2345-0282 2345-0282 |
DOI: | 10.9770/jesi.2023.10.3(25) |