Loading…

Total Quality Management: the case of an electricity distribution company

Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied resear...

Full description

Saved in:
Bibliographic Details
Published in:Brazilian journal of operations & production management 2019-03, Vol.16 (1), p.53-65
Main Authors: Santos, Ana Carla de Souza Gomes dos, Carvalho, Leandro Machado, Souza, Caio Ferreira de, Reis, Augusto da Cunha, Freitag, Alberto Eduardo Besser
Format: Article
Language:English
Subjects:
Citations: Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833
cites
container_end_page 65
container_issue 1
container_start_page 53
container_title Brazilian journal of operations & production management
container_volume 16
creator Santos, Ana Carla de Souza Gomes dos
Carvalho, Leandro Machado
Souza, Caio Ferreira de
Reis, Augusto da Cunha
Freitag, Alberto Eduardo Besser
description Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015. Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators. Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company. Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures. Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.
doi_str_mv 10.14488/BJOPM.2019.v16.n1.a5
format article
fullrecord <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58</doaj_id><sourcerecordid>oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58</sourcerecordid><originalsourceid>FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833</originalsourceid><addsrcrecordid>eNpNkNtKw0AURQdRsNR-gjA_kDj3ZHzT4qXSUoX6PJzMpaakmZJMhf69aSviftmbw2E9LIRuKcmpEGV59_i2fF_kjFCdf1OVtzQHeYFGjPEiK7Uil__2NZr0_YYM4ZoJqkdotooJGvyxh6ZOB7yAFtZ-69t0j9OXxxZ6j2PA0GLfeJu62h7fXN0Ps9qnOrbYxu0O2sMNugrQ9H7y22P0-fy0mr5m8-XLbPowzyxXKmWeUnBQCPBBK-e0ZoGWThUWCC2sFY5JF7glTBeVoNJSqUVglDMibaFLzsdodua6CBuz6-otdAcToTanQ-zWBrpU28YbWhErvHVaKCuUHEhAmCIV8c7xIMuBJc8s28W-73z441FiTnrNSa856jWDXtNSA5L_ANVab0c</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Total Quality Management: the case of an electricity distribution company</title><source>Business Source Ultimate【Trial: -2024/12/31】【Remote access available】</source><creator>Santos, Ana Carla de Souza Gomes dos ; Carvalho, Leandro Machado ; Souza, Caio Ferreira de ; Reis, Augusto da Cunha ; Freitag, Alberto Eduardo Besser</creator><creatorcontrib>Santos, Ana Carla de Souza Gomes dos ; Carvalho, Leandro Machado ; Souza, Caio Ferreira de ; Reis, Augusto da Cunha ; Freitag, Alberto Eduardo Besser</creatorcontrib><description>Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015. Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators. Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company. Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures. Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.</description><identifier>ISSN: 2237-8960</identifier><identifier>EISSN: 2237-8960</identifier><identifier>DOI: 10.14488/BJOPM.2019.v16.n1.a5</identifier><language>eng</language><publisher>Associação Brasileira de Engenharia de Produção (ABEPRO)</publisher><subject>Electrical energy ; Production and operation systems management ; Quality tools</subject><ispartof>Brazilian journal of operations &amp; production management, 2019-03, Vol.16 (1), p.53-65</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Santos, Ana Carla de Souza Gomes dos</creatorcontrib><creatorcontrib>Carvalho, Leandro Machado</creatorcontrib><creatorcontrib>Souza, Caio Ferreira de</creatorcontrib><creatorcontrib>Reis, Augusto da Cunha</creatorcontrib><creatorcontrib>Freitag, Alberto Eduardo Besser</creatorcontrib><title>Total Quality Management: the case of an electricity distribution company</title><title>Brazilian journal of operations &amp; production management</title><description>Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015. Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators. Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company. Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures. Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.</description><subject>Electrical energy</subject><subject>Production and operation systems management</subject><subject>Quality tools</subject><issn>2237-8960</issn><issn>2237-8960</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpNkNtKw0AURQdRsNR-gjA_kDj3ZHzT4qXSUoX6PJzMpaakmZJMhf69aSviftmbw2E9LIRuKcmpEGV59_i2fF_kjFCdf1OVtzQHeYFGjPEiK7Uil__2NZr0_YYM4ZoJqkdotooJGvyxh6ZOB7yAFtZ-69t0j9OXxxZ6j2PA0GLfeJu62h7fXN0Ps9qnOrbYxu0O2sMNugrQ9H7y22P0-fy0mr5m8-XLbPowzyxXKmWeUnBQCPBBK-e0ZoGWThUWCC2sFY5JF7glTBeVoNJSqUVglDMibaFLzsdodua6CBuz6-otdAcToTanQ-zWBrpU28YbWhErvHVaKCuUHEhAmCIV8c7xIMuBJc8s28W-73z441FiTnrNSa856jWDXtNSA5L_ANVab0c</recordid><startdate>20190301</startdate><enddate>20190301</enddate><creator>Santos, Ana Carla de Souza Gomes dos</creator><creator>Carvalho, Leandro Machado</creator><creator>Souza, Caio Ferreira de</creator><creator>Reis, Augusto da Cunha</creator><creator>Freitag, Alberto Eduardo Besser</creator><general>Associação Brasileira de Engenharia de Produção (ABEPRO)</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope></search><sort><creationdate>20190301</creationdate><title>Total Quality Management: the case of an electricity distribution company</title><author>Santos, Ana Carla de Souza Gomes dos ; Carvalho, Leandro Machado ; Souza, Caio Ferreira de ; Reis, Augusto da Cunha ; Freitag, Alberto Eduardo Besser</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Electrical energy</topic><topic>Production and operation systems management</topic><topic>Quality tools</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Santos, Ana Carla de Souza Gomes dos</creatorcontrib><creatorcontrib>Carvalho, Leandro Machado</creatorcontrib><creatorcontrib>Souza, Caio Ferreira de</creatorcontrib><creatorcontrib>Reis, Augusto da Cunha</creatorcontrib><creatorcontrib>Freitag, Alberto Eduardo Besser</creatorcontrib><collection>CrossRef</collection><collection>Open Access: DOAJ - Directory of Open Access Journals</collection><jtitle>Brazilian journal of operations &amp; production management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Santos, Ana Carla de Souza Gomes dos</au><au>Carvalho, Leandro Machado</au><au>Souza, Caio Ferreira de</au><au>Reis, Augusto da Cunha</au><au>Freitag, Alberto Eduardo Besser</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Total Quality Management: the case of an electricity distribution company</atitle><jtitle>Brazilian journal of operations &amp; production management</jtitle><date>2019-03-01</date><risdate>2019</risdate><volume>16</volume><issue>1</issue><spage>53</spage><epage>65</epage><pages>53-65</pages><issn>2237-8960</issn><eissn>2237-8960</eissn><abstract>Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015. Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators. Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company. Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures. Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.</abstract><pub>Associação Brasileira de Engenharia de Produção (ABEPRO)</pub><doi>10.14488/BJOPM.2019.v16.n1.a5</doi><tpages>13</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2237-8960
ispartof Brazilian journal of operations & production management, 2019-03, Vol.16 (1), p.53-65
issn 2237-8960
2237-8960
language eng
recordid cdi_doaj_primary_oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58
source Business Source Ultimate【Trial: -2024/12/31】【Remote access available】
subjects Electrical energy
Production and operation systems management
Quality tools
title Total Quality Management: the case of an electricity distribution company
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T16%3A50%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Total%20Quality%20Management:%20the%20case%20of%20an%20electricity%20distribution%20company&rft.jtitle=Brazilian%20journal%20of%20operations%20&%20production%20management&rft.au=Santos,%20Ana%20Carla%20de%20Souza%20Gomes%20dos&rft.date=2019-03-01&rft.volume=16&rft.issue=1&rft.spage=53&rft.epage=65&rft.pages=53-65&rft.issn=2237-8960&rft.eissn=2237-8960&rft_id=info:doi/10.14488/BJOPM.2019.v16.n1.a5&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58%3C/doaj_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true