Loading…
Total Quality Management: the case of an electricity distribution company
Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine. Design / Methodology / Approach: the nature of this work is applied resear...
Saved in:
Published in: | Brazilian journal of operations & production management 2019-03, Vol.16 (1), p.53-65 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833 |
---|---|
cites | |
container_end_page | 65 |
container_issue | 1 |
container_start_page | 53 |
container_title | Brazilian journal of operations & production management |
container_volume | 16 |
creator | Santos, Ana Carla de Souza Gomes dos Carvalho, Leandro Machado Souza, Caio Ferreira de Reis, Augusto da Cunha Freitag, Alberto Eduardo Besser |
description | Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine.
Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015.
Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators.
Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company.
Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures.
Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector. |
doi_str_mv | 10.14488/BJOPM.2019.v16.n1.a5 |
format | article |
fullrecord | <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58</doaj_id><sourcerecordid>oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58</sourcerecordid><originalsourceid>FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833</originalsourceid><addsrcrecordid>eNpNkNtKw0AURQdRsNR-gjA_kDj3ZHzT4qXSUoX6PJzMpaakmZJMhf69aSviftmbw2E9LIRuKcmpEGV59_i2fF_kjFCdf1OVtzQHeYFGjPEiK7Uil__2NZr0_YYM4ZoJqkdotooJGvyxh6ZOB7yAFtZ-69t0j9OXxxZ6j2PA0GLfeJu62h7fXN0Ps9qnOrbYxu0O2sMNugrQ9H7y22P0-fy0mr5m8-XLbPowzyxXKmWeUnBQCPBBK-e0ZoGWThUWCC2sFY5JF7glTBeVoNJSqUVglDMibaFLzsdodua6CBuz6-otdAcToTanQ-zWBrpU28YbWhErvHVaKCuUHEhAmCIV8c7xIMuBJc8s28W-73z441FiTnrNSa856jWDXtNSA5L_ANVab0c</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Total Quality Management: the case of an electricity distribution company</title><source>Business Source Ultimate【Trial: -2024/12/31】【Remote access available】</source><creator>Santos, Ana Carla de Souza Gomes dos ; Carvalho, Leandro Machado ; Souza, Caio Ferreira de ; Reis, Augusto da Cunha ; Freitag, Alberto Eduardo Besser</creator><creatorcontrib>Santos, Ana Carla de Souza Gomes dos ; Carvalho, Leandro Machado ; Souza, Caio Ferreira de ; Reis, Augusto da Cunha ; Freitag, Alberto Eduardo Besser</creatorcontrib><description>Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine.
Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015.
Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators.
Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company.
Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures.
Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.</description><identifier>ISSN: 2237-8960</identifier><identifier>EISSN: 2237-8960</identifier><identifier>DOI: 10.14488/BJOPM.2019.v16.n1.a5</identifier><language>eng</language><publisher>Associação Brasileira de Engenharia de Produção (ABEPRO)</publisher><subject>Electrical energy ; Production and operation systems management ; Quality tools</subject><ispartof>Brazilian journal of operations & production management, 2019-03, Vol.16 (1), p.53-65</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Santos, Ana Carla de Souza Gomes dos</creatorcontrib><creatorcontrib>Carvalho, Leandro Machado</creatorcontrib><creatorcontrib>Souza, Caio Ferreira de</creatorcontrib><creatorcontrib>Reis, Augusto da Cunha</creatorcontrib><creatorcontrib>Freitag, Alberto Eduardo Besser</creatorcontrib><title>Total Quality Management: the case of an electricity distribution company</title><title>Brazilian journal of operations & production management</title><description>Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine.
Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015.
Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators.
Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company.
Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures.
Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.</description><subject>Electrical energy</subject><subject>Production and operation systems management</subject><subject>Quality tools</subject><issn>2237-8960</issn><issn>2237-8960</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpNkNtKw0AURQdRsNR-gjA_kDj3ZHzT4qXSUoX6PJzMpaakmZJMhf69aSviftmbw2E9LIRuKcmpEGV59_i2fF_kjFCdf1OVtzQHeYFGjPEiK7Uil__2NZr0_YYM4ZoJqkdotooJGvyxh6ZOB7yAFtZ-69t0j9OXxxZ6j2PA0GLfeJu62h7fXN0Ps9qnOrbYxu0O2sMNugrQ9H7y22P0-fy0mr5m8-XLbPowzyxXKmWeUnBQCPBBK-e0ZoGWThUWCC2sFY5JF7glTBeVoNJSqUVglDMibaFLzsdodua6CBuz6-otdAcToTanQ-zWBrpU28YbWhErvHVaKCuUHEhAmCIV8c7xIMuBJc8s28W-73z441FiTnrNSa856jWDXtNSA5L_ANVab0c</recordid><startdate>20190301</startdate><enddate>20190301</enddate><creator>Santos, Ana Carla de Souza Gomes dos</creator><creator>Carvalho, Leandro Machado</creator><creator>Souza, Caio Ferreira de</creator><creator>Reis, Augusto da Cunha</creator><creator>Freitag, Alberto Eduardo Besser</creator><general>Associação Brasileira de Engenharia de Produção (ABEPRO)</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope></search><sort><creationdate>20190301</creationdate><title>Total Quality Management: the case of an electricity distribution company</title><author>Santos, Ana Carla de Souza Gomes dos ; Carvalho, Leandro Machado ; Souza, Caio Ferreira de ; Reis, Augusto da Cunha ; Freitag, Alberto Eduardo Besser</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Electrical energy</topic><topic>Production and operation systems management</topic><topic>Quality tools</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Santos, Ana Carla de Souza Gomes dos</creatorcontrib><creatorcontrib>Carvalho, Leandro Machado</creatorcontrib><creatorcontrib>Souza, Caio Ferreira de</creatorcontrib><creatorcontrib>Reis, Augusto da Cunha</creatorcontrib><creatorcontrib>Freitag, Alberto Eduardo Besser</creatorcontrib><collection>CrossRef</collection><collection>Open Access: DOAJ - Directory of Open Access Journals</collection><jtitle>Brazilian journal of operations & production management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Santos, Ana Carla de Souza Gomes dos</au><au>Carvalho, Leandro Machado</au><au>Souza, Caio Ferreira de</au><au>Reis, Augusto da Cunha</au><au>Freitag, Alberto Eduardo Besser</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Total Quality Management: the case of an electricity distribution company</atitle><jtitle>Brazilian journal of operations & production management</jtitle><date>2019-03-01</date><risdate>2019</risdate><volume>16</volume><issue>1</issue><spage>53</spage><epage>65</epage><pages>53-65</pages><issn>2237-8960</issn><eissn>2237-8960</eissn><abstract>Goal: this research aims to deploy TQM in the new customers area of an electricity distribution company, located in Campos dos Goytacazes (Rio de Janeiro), based on three management pillars: guidelines, processes and routine.
Design / Methodology / Approach: the nature of this work is applied research, with a qualitative problem approach, characterized as exploratory, using case study as a technical procedure, with data collected between april and september of 2015.
Results: the performed methodology allowed a reduction of both "orders after deadline" (12%) and "unproductive visits" (22%) indicators.
Limitations of the investigation: the research presented limitations, first, because of the resistance of some employees during the tools implementation and second, the methodology was implemented only in a sector of the company.
Practical implications: the study was based on indicators and targets already used by the company. It was proposed and implemented an anomalies analysis and tools such asthe PDCA cycle, Pareto and Ishikawa diagrams, 5W1H, and Standard Operating Procedures.
Originality / Value: there is little research with emphasis on TQM, especially when referring to an analysis using three levels of management (guidelines, process and routine) in the Brazilian electricity sector.</abstract><pub>Associação Brasileira de Engenharia de Produção (ABEPRO)</pub><doi>10.14488/BJOPM.2019.v16.n1.a5</doi><tpages>13</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2237-8960 |
ispartof | Brazilian journal of operations & production management, 2019-03, Vol.16 (1), p.53-65 |
issn | 2237-8960 2237-8960 |
language | eng |
recordid | cdi_doaj_primary_oai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58 |
source | Business Source Ultimate【Trial: -2024/12/31】【Remote access available】 |
subjects | Electrical energy Production and operation systems management Quality tools |
title | Total Quality Management: the case of an electricity distribution company |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T16%3A50%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Total%20Quality%20Management:%20the%20case%20of%20an%20electricity%20distribution%20company&rft.jtitle=Brazilian%20journal%20of%20operations%20&%20production%20management&rft.au=Santos,%20Ana%20Carla%20de%20Souza%20Gomes%20dos&rft.date=2019-03-01&rft.volume=16&rft.issue=1&rft.spage=53&rft.epage=65&rft.pages=53-65&rft.issn=2237-8960&rft.eissn=2237-8960&rft_id=info:doi/10.14488/BJOPM.2019.v16.n1.a5&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_1b0c4ecd946c465594a0260b0edd3f58%3C/doaj_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c366t-e11ada74aef96dd992f18d67ca017cc4d25df3c0297b415c1594f213205c79833%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |