Loading…
Methods of erection of high-rise buildings
The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-p...
Saved in:
Published in: | E3S web of conferences 2018-01, Vol.33, p.3040 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c3030-f7ffefb13c3a44b4451762cbf22e5c7975e8ce3fe446751ff0ab9fd7f43dbcb83 |
---|---|
cites | cdi_FETCH-LOGICAL-c3030-f7ffefb13c3a44b4451762cbf22e5c7975e8ce3fe446751ff0ab9fd7f43dbcb83 |
container_end_page | |
container_issue | |
container_start_page | 3040 |
container_title | E3S web of conferences |
container_volume | 33 |
creator | Cherednichenko, Nadezhda Oleinik, Pavel |
description | The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space. |
doi_str_mv | 10.1051/e3sconf/20183303040 |
format | article |
fullrecord | <record><control><sourceid>proquest_doaj_</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_204c982dbf93447f8a00d1cb2a9e0e2b</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_204c982dbf93447f8a00d1cb2a9e0e2b</doaj_id><sourcerecordid>2038402729</sourcerecordid><originalsourceid>FETCH-LOGICAL-c3030-f7ffefb13c3a44b4451762cbf22e5c7975e8ce3fe446751ff0ab9fd7f43dbcb83</originalsourceid><addsrcrecordid>eNpNkM1LAzEQxYMoWGr_Ai8Fb8Laycc2u0cpfhQqXvQckuxMN6VuarI9-N-7tUV6msfw5r3hx9gthwcOJZ-hzD52NBPAKylBgoILNhJirgsulLg809dskvMGALgoKwVqxO7fsG9jk6eRppjQ9yF2B92GdVukkHHq9mHbhG6db9gV2W3GyWmO2efz08fitVi9vywXj6vCH8oL0kRIjksvrVJOqZLrufCOhMDS61qXWHmUhErNdcmJwLqaGk1KNs67So7Z8pjbRLsxuxS-bPox0Qbzt4hpbWzqg9-iEaB8XYnGUS2V0lRZgIZ7J2yNgMINWXfHrF2K33vMvdnEfeqG94dbOSAQWtSDSx5dPsWcE9J_KwdzYGxOjM0ZY_kLgCxvDQ</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2038402729</pqid></control><display><type>article</type><title>Methods of erection of high-rise buildings</title><source>Publicly Available Content Database</source><creator>Cherednichenko, Nadezhda ; Oleinik, Pavel</creator><contributor>Safarik, D. ; Tabunschikov, Y. ; Murgul, V.</contributor><creatorcontrib>Cherednichenko, Nadezhda ; Oleinik, Pavel ; Safarik, D. ; Tabunschikov, Y. ; Murgul, V.</creatorcontrib><description>The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.</description><identifier>ISSN: 2267-1242</identifier><identifier>ISSN: 2555-0403</identifier><identifier>EISSN: 2267-1242</identifier><identifier>DOI: 10.1051/e3sconf/20183303040</identifier><language>eng</language><publisher>Les Ulis: EDP Sciences</publisher><subject>Buildings ; Concrete ; Concrete mixes ; Concrete structures ; Construction ; Construction methods ; Cranes ; Formwork ; Foundation construction ; High rise buildings ; Installation ; Modular systems ; Pile foundations ; Reinforced concrete ; Reinforcing steels ; Soil conditions</subject><ispartof>E3S web of conferences, 2018-01, Vol.33, p.3040</ispartof><rights>2018. This work is licensed under http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c3030-f7ffefb13c3a44b4451762cbf22e5c7975e8ce3fe446751ff0ab9fd7f43dbcb83</citedby><cites>FETCH-LOGICAL-c3030-f7ffefb13c3a44b4451762cbf22e5c7975e8ce3fe446751ff0ab9fd7f43dbcb83</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.proquest.com/docview/2038402729?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>309,310,314,780,784,789,790,23930,23931,25140,25753,27924,27925,37012,44590</link.rule.ids></links><search><contributor>Safarik, D.</contributor><contributor>Tabunschikov, Y.</contributor><contributor>Murgul, V.</contributor><creatorcontrib>Cherednichenko, Nadezhda</creatorcontrib><creatorcontrib>Oleinik, Pavel</creatorcontrib><title>Methods of erection of high-rise buildings</title><title>E3S web of conferences</title><description>The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.</description><subject>Buildings</subject><subject>Concrete</subject><subject>Concrete mixes</subject><subject>Concrete structures</subject><subject>Construction</subject><subject>Construction methods</subject><subject>Cranes</subject><subject>Formwork</subject><subject>Foundation construction</subject><subject>High rise buildings</subject><subject>Installation</subject><subject>Modular systems</subject><subject>Pile foundations</subject><subject>Reinforced concrete</subject><subject>Reinforcing steels</subject><subject>Soil conditions</subject><issn>2267-1242</issn><issn>2555-0403</issn><issn>2267-1242</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><sourceid>PIMPY</sourceid><sourceid>DOA</sourceid><recordid>eNpNkM1LAzEQxYMoWGr_Ai8Fb8Laycc2u0cpfhQqXvQckuxMN6VuarI9-N-7tUV6msfw5r3hx9gthwcOJZ-hzD52NBPAKylBgoILNhJirgsulLg809dskvMGALgoKwVqxO7fsG9jk6eRppjQ9yF2B92GdVukkHHq9mHbhG6db9gV2W3GyWmO2efz08fitVi9vywXj6vCH8oL0kRIjksvrVJOqZLrufCOhMDS61qXWHmUhErNdcmJwLqaGk1KNs67So7Z8pjbRLsxuxS-bPox0Qbzt4hpbWzqg9-iEaB8XYnGUS2V0lRZgIZ7J2yNgMINWXfHrF2K33vMvdnEfeqG94dbOSAQWtSDSx5dPsWcE9J_KwdzYGxOjM0ZY_kLgCxvDQ</recordid><startdate>20180101</startdate><enddate>20180101</enddate><creator>Cherednichenko, Nadezhda</creator><creator>Oleinik, Pavel</creator><general>EDP Sciences</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7ST</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>ATCPS</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>BHPHI</scope><scope>BKSAR</scope><scope>C1K</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FR3</scope><scope>GNUQQ</scope><scope>H8D</scope><scope>HCIFZ</scope><scope>KR7</scope><scope>L6V</scope><scope>L7M</scope><scope>M7S</scope><scope>PATMY</scope><scope>PCBAR</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>PYCSY</scope><scope>SOI</scope><scope>DOA</scope></search><sort><creationdate>20180101</creationdate><title>Methods of erection of high-rise buildings</title><author>Cherednichenko, Nadezhda ; Oleinik, Pavel</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c3030-f7ffefb13c3a44b4451762cbf22e5c7975e8ce3fe446751ff0ab9fd7f43dbcb83</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Buildings</topic><topic>Concrete</topic><topic>Concrete mixes</topic><topic>Concrete structures</topic><topic>Construction</topic><topic>Construction methods</topic><topic>Cranes</topic><topic>Formwork</topic><topic>Foundation construction</topic><topic>High rise buildings</topic><topic>Installation</topic><topic>Modular systems</topic><topic>Pile foundations</topic><topic>Reinforced concrete</topic><topic>Reinforcing steels</topic><topic>Soil conditions</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Cherednichenko, Nadezhda</creatorcontrib><creatorcontrib>Oleinik, Pavel</creatorcontrib><collection>CrossRef</collection><collection>Environment Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>Agricultural & Environmental Science Collection</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest Natural Science Collection</collection><collection>Earth, Atmospheric & Aquatic Science Collection</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>Engineering Research Database</collection><collection>ProQuest Central Student</collection><collection>Aerospace Database</collection><collection>SciTech Premium Collection</collection><collection>Civil Engineering Abstracts</collection><collection>ProQuest Engineering Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Engineering Database</collection><collection>Environmental Science Database</collection><collection>Earth, Atmospheric & Aquatic Science Database</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering collection</collection><collection>Environmental Science Collection</collection><collection>Environment Abstracts</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>E3S web of conferences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Cherednichenko, Nadezhda</au><au>Oleinik, Pavel</au><au>Safarik, D.</au><au>Tabunschikov, Y.</au><au>Murgul, V.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Methods of erection of high-rise buildings</atitle><jtitle>E3S web of conferences</jtitle><date>2018-01-01</date><risdate>2018</risdate><volume>33</volume><spage>3040</spage><pages>3040-</pages><issn>2267-1242</issn><issn>2555-0403</issn><eissn>2267-1242</eissn><abstract>The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.</abstract><cop>Les Ulis</cop><pub>EDP Sciences</pub><doi>10.1051/e3sconf/20183303040</doi><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2267-1242 |
ispartof | E3S web of conferences, 2018-01, Vol.33, p.3040 |
issn | 2267-1242 2555-0403 2267-1242 |
language | eng |
recordid | cdi_doaj_primary_oai_doaj_org_article_204c982dbf93447f8a00d1cb2a9e0e2b |
source | Publicly Available Content Database |
subjects | Buildings Concrete Concrete mixes Concrete structures Construction Construction methods Cranes Formwork Foundation construction High rise buildings Installation Modular systems Pile foundations Reinforced concrete Reinforcing steels Soil conditions |
title | Methods of erection of high-rise buildings |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T03%3A07%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_doaj_&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Methods%20of%20erection%20of%20high-rise%20buildings&rft.jtitle=E3S%20web%20of%20conferences&rft.au=Cherednichenko,%20Nadezhda&rft.date=2018-01-01&rft.volume=33&rft.spage=3040&rft.pages=3040-&rft.issn=2267-1242&rft.eissn=2267-1242&rft_id=info:doi/10.1051/e3sconf/20183303040&rft_dat=%3Cproquest_doaj_%3E2038402729%3C/proquest_doaj_%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c3030-f7ffefb13c3a44b4451762cbf22e5c7975e8ce3fe446751ff0ab9fd7f43dbcb83%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2038402729&rft_id=info:pmid/&rfr_iscdi=true |