Loading…

Introducing KM Strategic Alignment Road Map in Iranian Public Agencies Studied in Tehran Regional Electricity Company

Effective and on time satisfaction of organizational requirements, implementation of KM projects and above all aligning KM with business strategies are the main concerns of executives which make the existence of KM strategic alignment roadmap necessary. In order to address challenges of aligning KM...

Full description

Saved in:
Bibliographic Details
Published in:Nashrīyah-i mudīrīyat-i fannāvarī-i iṭṭilāʻāt 2016-07, Vol.8 (2), p.231-252
Main Authors: Mona Jamipor, Hamid Reza Yazdani, Freshteh Sadeghi
Format: Article
Language:per
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 252
container_issue 2
container_start_page 231
container_title Nashrīyah-i mudīrīyat-i fannāvarī-i iṭṭilāʻāt
container_volume 8
creator Mona Jamipor
Hamid Reza Yazdani
Freshteh Sadeghi
description Effective and on time satisfaction of organizational requirements, implementation of KM projects and above all aligning KM with business strategies are the main concerns of executives which make the existence of KM strategic alignment roadmap necessary. In order to address challenges of aligning KM with critical business needs, this paper proposed a comprehensive road map of alignment with best practices and critical success factors of KM implementation. By applying survey approach, we investigated opinions of experts which were related to the KM alignment roadmap architecture and customization of roadmap factors. Then, by using evaluating research, the application of roadmap illustrated in Regional Electricity Company. Sampling method was purposeful (judgmental) which is a non-random method. Data were analyzed by descriptive and inferential statistics. The proposed roadmap had five levels with specific factors. Regional Electricity Company was in the second level of KM strategic alignment. By applying developed road map in Regional Electricity Company, current maturity of strategic aligning KM, strength and weak points of KM project were identified. Consequently, by considering the results of assessment, future strategies, focus and investment priorities of KM were extracted.
doi_str_mv 10.22059/jitm.2016.55716
format article
fullrecord <record><control><sourceid>doaj</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f58</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f58</doaj_id><sourcerecordid>oai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f58</sourcerecordid><originalsourceid>FETCH-doaj_primary_oai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f583</originalsourceid><addsrcrecordid>eNqtjMFqhDAYhENpoUu79x7zAtqYGDXHsmzpUhaW7d7lT4z2XzSRGA--fd3SR-hphplvhpCXjKWcM6lerxiHlLOsSKUss-KObHjORSLX7n71jFWJrJR4JNtpQs2k4EKVgm3IfHAx-GY26Dr6eaRfMUC0HRr61mPnBusiPXto6BFGio4eAjgER0-z7m9QZ51BO627uUHb3JCL_V4hel5fvIOe7ntrYkCDcaE7P4zglmfy0EI_2e2fPpHD-_6y-0gaD9d6DDhAWGoPWP8GPnQ1hIimt7VQwmpdljrTZQ5Cq1YWuZKgpRCilZX4z68fPQVtfg</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Introducing KM Strategic Alignment Road Map in Iranian Public Agencies Studied in Tehran Regional Electricity Company</title><source>IngentaConnect Journals</source><source>Alma/SFX Local Collection</source><creator>Mona Jamipor ; Hamid Reza Yazdani ; Freshteh Sadeghi</creator><creatorcontrib>Mona Jamipor ; Hamid Reza Yazdani ; Freshteh Sadeghi</creatorcontrib><description>Effective and on time satisfaction of organizational requirements, implementation of KM projects and above all aligning KM with business strategies are the main concerns of executives which make the existence of KM strategic alignment roadmap necessary. In order to address challenges of aligning KM with critical business needs, this paper proposed a comprehensive road map of alignment with best practices and critical success factors of KM implementation. By applying survey approach, we investigated opinions of experts which were related to the KM alignment roadmap architecture and customization of roadmap factors. Then, by using evaluating research, the application of roadmap illustrated in Regional Electricity Company. Sampling method was purposeful (judgmental) which is a non-random method. Data were analyzed by descriptive and inferential statistics. The proposed roadmap had five levels with specific factors. Regional Electricity Company was in the second level of KM strategic alignment. By applying developed road map in Regional Electricity Company, current maturity of strategic aligning KM, strength and weak points of KM project were identified. Consequently, by considering the results of assessment, future strategies, focus and investment priorities of KM were extracted.</description><identifier>ISSN: 2008-5893</identifier><identifier>EISSN: 2423-5059</identifier><identifier>DOI: 10.22059/jitm.2016.55716</identifier><language>per</language><publisher>University of Tehran</publisher><subject>Implementation Road Map ; KM Strategic Alignment ; Maturity Model</subject><ispartof>Nashrīyah-i mudīrīyat-i fannāvarī-i iṭṭilāʻāt, 2016-07, Vol.8 (2), p.231-252</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Mona Jamipor</creatorcontrib><creatorcontrib>Hamid Reza Yazdani</creatorcontrib><creatorcontrib>Freshteh Sadeghi</creatorcontrib><title>Introducing KM Strategic Alignment Road Map in Iranian Public Agencies Studied in Tehran Regional Electricity Company</title><title>Nashrīyah-i mudīrīyat-i fannāvarī-i iṭṭilāʻāt</title><description>Effective and on time satisfaction of organizational requirements, implementation of KM projects and above all aligning KM with business strategies are the main concerns of executives which make the existence of KM strategic alignment roadmap necessary. In order to address challenges of aligning KM with critical business needs, this paper proposed a comprehensive road map of alignment with best practices and critical success factors of KM implementation. By applying survey approach, we investigated opinions of experts which were related to the KM alignment roadmap architecture and customization of roadmap factors. Then, by using evaluating research, the application of roadmap illustrated in Regional Electricity Company. Sampling method was purposeful (judgmental) which is a non-random method. Data were analyzed by descriptive and inferential statistics. The proposed roadmap had five levels with specific factors. Regional Electricity Company was in the second level of KM strategic alignment. By applying developed road map in Regional Electricity Company, current maturity of strategic aligning KM, strength and weak points of KM project were identified. Consequently, by considering the results of assessment, future strategies, focus and investment priorities of KM were extracted.</description><subject>Implementation Road Map</subject><subject>KM Strategic Alignment</subject><subject>Maturity Model</subject><issn>2008-5893</issn><issn>2423-5059</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNqtjMFqhDAYhENpoUu79x7zAtqYGDXHsmzpUhaW7d7lT4z2XzSRGA--fd3SR-hphplvhpCXjKWcM6lerxiHlLOsSKUss-KObHjORSLX7n71jFWJrJR4JNtpQs2k4EKVgm3IfHAx-GY26Dr6eaRfMUC0HRr61mPnBusiPXto6BFGio4eAjgER0-z7m9QZ51BO627uUHb3JCL_V4hel5fvIOe7ntrYkCDcaE7P4zglmfy0EI_2e2fPpHD-_6y-0gaD9d6DDhAWGoPWP8GPnQ1hIimt7VQwmpdljrTZQ5Cq1YWuZKgpRCilZX4z68fPQVtfg</recordid><startdate>20160701</startdate><enddate>20160701</enddate><creator>Mona Jamipor</creator><creator>Hamid Reza Yazdani</creator><creator>Freshteh Sadeghi</creator><general>University of Tehran</general><scope>DOA</scope></search><sort><creationdate>20160701</creationdate><title>Introducing KM Strategic Alignment Road Map in Iranian Public Agencies Studied in Tehran Regional Electricity Company</title><author>Mona Jamipor ; Hamid Reza Yazdani ; Freshteh Sadeghi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-doaj_primary_oai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f583</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>per</language><creationdate>2016</creationdate><topic>Implementation Road Map</topic><topic>KM Strategic Alignment</topic><topic>Maturity Model</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Mona Jamipor</creatorcontrib><creatorcontrib>Hamid Reza Yazdani</creatorcontrib><creatorcontrib>Freshteh Sadeghi</creatorcontrib><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Nashrīyah-i mudīrīyat-i fannāvarī-i iṭṭilāʻāt</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Mona Jamipor</au><au>Hamid Reza Yazdani</au><au>Freshteh Sadeghi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Introducing KM Strategic Alignment Road Map in Iranian Public Agencies Studied in Tehran Regional Electricity Company</atitle><jtitle>Nashrīyah-i mudīrīyat-i fannāvarī-i iṭṭilāʻāt</jtitle><date>2016-07-01</date><risdate>2016</risdate><volume>8</volume><issue>2</issue><spage>231</spage><epage>252</epage><pages>231-252</pages><issn>2008-5893</issn><eissn>2423-5059</eissn><abstract>Effective and on time satisfaction of organizational requirements, implementation of KM projects and above all aligning KM with business strategies are the main concerns of executives which make the existence of KM strategic alignment roadmap necessary. In order to address challenges of aligning KM with critical business needs, this paper proposed a comprehensive road map of alignment with best practices and critical success factors of KM implementation. By applying survey approach, we investigated opinions of experts which were related to the KM alignment roadmap architecture and customization of roadmap factors. Then, by using evaluating research, the application of roadmap illustrated in Regional Electricity Company. Sampling method was purposeful (judgmental) which is a non-random method. Data were analyzed by descriptive and inferential statistics. The proposed roadmap had five levels with specific factors. Regional Electricity Company was in the second level of KM strategic alignment. By applying developed road map in Regional Electricity Company, current maturity of strategic aligning KM, strength and weak points of KM project were identified. Consequently, by considering the results of assessment, future strategies, focus and investment priorities of KM were extracted.</abstract><pub>University of Tehran</pub><doi>10.22059/jitm.2016.55716</doi><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2008-5893
ispartof Nashrīyah-i mudīrīyat-i fannāvarī-i iṭṭilāʻāt, 2016-07, Vol.8 (2), p.231-252
issn 2008-5893
2423-5059
language per
recordid cdi_doaj_primary_oai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f58
source IngentaConnect Journals; Alma/SFX Local Collection
subjects Implementation Road Map
KM Strategic Alignment
Maturity Model
title Introducing KM Strategic Alignment Road Map in Iranian Public Agencies Studied in Tehran Regional Electricity Company
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T13%3A35%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Introducing%20KM%20Strategic%20Alignment%20Road%20Map%20in%20Iranian%20Public%20Agencies%20Studied%20in%20Tehran%20Regional%20Electricity%20Company&rft.jtitle=Nashr%C4%AByah-i%20mud%C4%ABr%C4%AByat-i%20fann%C4%81var%C4%AB-i%20i%E1%B9%AD%E1%B9%ADil%C4%81%CA%BB%C4%81t&rft.au=Mona%20Jamipor&rft.date=2016-07-01&rft.volume=8&rft.issue=2&rft.spage=231&rft.epage=252&rft.pages=231-252&rft.issn=2008-5893&rft.eissn=2423-5059&rft_id=info:doi/10.22059/jitm.2016.55716&rft_dat=%3Cdoaj%3Eoai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f58%3C/doaj%3E%3Cgrp_id%3Ecdi_FETCH-doaj_primary_oai_doaj_org_article_393ebb77b1b74a3b9f56495ab5333f583%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true