Loading…

Cost Minimisation for Total Site Heat Recovery

In this paper minimisation of total cost for retrofit of Total Site heat recovery system is proposed. It based on analysis of balanced Total Site Profiles and includes procedure for calculation of heat transfer area. Heat transfer area is calculated for different regions with use of intermediate uti...

Full description

Saved in:
Bibliographic Details
Published in:Chemical engineering transactions 2015-10, Vol.45
Main Authors: S. Boldyryev, G. Krajacic, N. Duic, P.S. Varbanov
Format: Article
Language:English
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In this paper minimisation of total cost for retrofit of Total Site heat recovery system is proposed. It based on analysis of balanced Total Site Profiles and includes procedure for calculation of heat transfer area. Heat transfer area is calculated for different regions with use of intermediate utility and direct heating and cooling. Minimal temperature difference between Total Site Profiles is analysed. Global minimum of heat transfer area for Total Site recovery is calculated for array of minimal temperature differences. It is analysed with utility consumption, numbers of units and material of equipment. Selection of minimum total cost for retrofit project of site recovery system is proposed.
ISSN:2283-9216
DOI:10.3303/CET1545027