Loading…

OPTIMAL PARAMETERS OF BLASTING IN TUNNELS USING PATRONED AND PUMPED EXPLOSIVES WITH ELECTRIC AND NON-ELECTRIC INITIATION

The parameters of drilling and blasting procedures during excavation of the "Gric" and "Mala Kapela" Tunnels are presented in this work. The tunnels are being constructed according to NATM (New Austrian Tunneling Method) in two parallel tubes. [PUBLICATION ABSTRACT]

Saved in:
Bibliographic Details
Published in:Rudarsko-geološko-naftni zbornik 2003-12, Vol.15 (1), p.31-37
Main Authors: Dekovic, Zvonimir, Ester, Zvonimir, Dobrilovic, Mario
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The parameters of drilling and blasting procedures during excavation of the "Gric" and "Mala Kapela" Tunnels are presented in this work. The tunnels are being constructed according to NATM (New Austrian Tunneling Method) in two parallel tubes. [PUBLICATION ABSTRACT]
ISSN:0353-4529
1849-0409