Loading…
Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error
The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the appli...
Saved in:
Published in: | Measurement and control (London) 2024-12, Vol.57 (10), p.1480-1498 |
---|---|
Main Authors: | , , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | cdi_FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3 |
container_end_page | 1498 |
container_issue | 10 |
container_start_page | 1480 |
container_title | Measurement and control (London) |
container_volume | 57 |
creator | Munir, Tahir Alqahtani, Fahad M. Alrashidi, Afaf Rahman, Abdu R Cheema, Salman Arif Li, Yi |
description | The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts. |
doi_str_mv | 10.1177/00202940241227814 |
format | article |
fullrecord | <record><control><sourceid>proquest_doaj_</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_7bdb0628d99b4a2c9688b650d9931643</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.1177_00202940241227814</sage_id><doaj_id>oai_doaj_org_article_7bdb0628d99b4a2c9688b650d9931643</doaj_id><sourcerecordid>3126550479</sourcerecordid><originalsourceid>FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3</originalsourceid><addsrcrecordid>eNp1kctOwzAQRS0EElXhA9hFYu3iR2LHy6riJfFYlIoFC8txJm2qJgY7KeLvcQiCBcILW9d37pmRBqEzSmaUSnlBCCNMpYSllDGZ0_QATRjJKM4lJ4doMvh4KDhGpyFsSTy5EIKJCXp5cHvYJdY1Rd1CmSw38L4xvsOLVdPvTFfvIbl8vp_j5eo-acC0iR3skLzX3cb1HU5MW36JwQ29hwbaLgHvnT9BR5XZBTj9fqdodXX5tLjBd4_Xt4v5HbZc8g4rBgqKnCiQFRci3lWUhvIqL1VVsdIYQrlkVgleAFOW2wpMZkVJLIgU-BTdjtzSma1-9XVj_Id2ptZfH86vdRy5tjvQsigLIlgEqyI1AzLPC5GRqDkVKY-s85H16t1bD6HTW9f7No6vOWUiy0gqVayiY5X1LgQP1U9XSvSwEv1nJTEzGzPBrOGX-n_gE66CioI</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>3126550479</pqid></control><display><type>article</type><title>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</title><source>Sage Journals GOLD Open Access 2024</source><source>ProQuest - Publicly Available Content Database</source><creator>Munir, Tahir ; Alqahtani, Fahad M. ; Alrashidi, Afaf ; Rahman, Abdu R ; Cheema, Salman Arif ; Li, Yi</creator><creatorcontrib>Munir, Tahir ; Alqahtani, Fahad M. ; Alrashidi, Afaf ; Rahman, Abdu R ; Cheema, Salman Arif ; Li, Yi</creatorcontrib><description>The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts.</description><identifier>ISSN: 0020-2940</identifier><identifier>EISSN: 2051-8730</identifier><identifier>DOI: 10.1177/00202940241227814</identifier><language>eng</language><publisher>London, England: SAGE Publications</publisher><subject>Control charts ; Control methods ; Error analysis ; Error detection ; Monte Carlo simulation ; Quality control</subject><ispartof>Measurement and control (London), 2024-12, Vol.57 (10), p.1480-1498</ispartof><rights>The Author(s) 2024</rights><rights>The Author(s) 2024. This work is licensed under the Creative Commons Attribution License https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3</cites><orcidid>0000-0002-3480-1485</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://journals.sagepub.com/doi/pdf/10.1177/00202940241227814$$EPDF$$P50$$Gsage$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://www.proquest.com/docview/3126550479?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,21965,25752,27852,27923,27924,37011,44589,44944,45332</link.rule.ids></links><search><creatorcontrib>Munir, Tahir</creatorcontrib><creatorcontrib>Alqahtani, Fahad M.</creatorcontrib><creatorcontrib>Alrashidi, Afaf</creatorcontrib><creatorcontrib>Rahman, Abdu R</creatorcontrib><creatorcontrib>Cheema, Salman Arif</creatorcontrib><creatorcontrib>Li, Yi</creatorcontrib><title>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</title><title>Measurement and control (London)</title><description>The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts.</description><subject>Control charts</subject><subject>Control methods</subject><subject>Error analysis</subject><subject>Error detection</subject><subject>Monte Carlo simulation</subject><subject>Quality control</subject><issn>0020-2940</issn><issn>2051-8730</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><sourceid>AFRWT</sourceid><sourceid>PIMPY</sourceid><sourceid>DOA</sourceid><recordid>eNp1kctOwzAQRS0EElXhA9hFYu3iR2LHy6riJfFYlIoFC8txJm2qJgY7KeLvcQiCBcILW9d37pmRBqEzSmaUSnlBCCNMpYSllDGZ0_QATRjJKM4lJ4doMvh4KDhGpyFsSTy5EIKJCXp5cHvYJdY1Rd1CmSw38L4xvsOLVdPvTFfvIbl8vp_j5eo-acC0iR3skLzX3cb1HU5MW36JwQ29hwbaLgHvnT9BR5XZBTj9fqdodXX5tLjBd4_Xt4v5HbZc8g4rBgqKnCiQFRci3lWUhvIqL1VVsdIYQrlkVgleAFOW2wpMZkVJLIgU-BTdjtzSma1-9XVj_Id2ptZfH86vdRy5tjvQsigLIlgEqyI1AzLPC5GRqDkVKY-s85H16t1bD6HTW9f7No6vOWUiy0gqVayiY5X1LgQP1U9XSvSwEv1nJTEzGzPBrOGX-n_gE66CioI</recordid><startdate>20241201</startdate><enddate>20241201</enddate><creator>Munir, Tahir</creator><creator>Alqahtani, Fahad M.</creator><creator>Alrashidi, Afaf</creator><creator>Rahman, Abdu R</creator><creator>Cheema, Salman Arif</creator><creator>Li, Yi</creator><general>SAGE Publications</general><general>Sage Publications Ltd</general><general>SAGE Publishing</general><scope>AFRWT</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7TB</scope><scope>8FD</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FR3</scope><scope>L7M</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>DOA</scope><orcidid>https://orcid.org/0000-0002-3480-1485</orcidid></search><sort><creationdate>20241201</creationdate><title>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</title><author>Munir, Tahir ; Alqahtani, Fahad M. ; Alrashidi, Afaf ; Rahman, Abdu R ; Cheema, Salman Arif ; Li, Yi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><topic>Control charts</topic><topic>Control methods</topic><topic>Error analysis</topic><topic>Error detection</topic><topic>Monte Carlo simulation</topic><topic>Quality control</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Munir, Tahir</creatorcontrib><creatorcontrib>Alqahtani, Fahad M.</creatorcontrib><creatorcontrib>Alrashidi, Afaf</creatorcontrib><creatorcontrib>Rahman, Abdu R</creatorcontrib><creatorcontrib>Cheema, Salman Arif</creatorcontrib><creatorcontrib>Li, Yi</creatorcontrib><collection>Sage Journals GOLD Open Access 2024</collection><collection>CrossRef</collection><collection>Electronics & Communications Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Engineering Research Database</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>ProQuest - Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Measurement and control (London)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Munir, Tahir</au><au>Alqahtani, Fahad M.</au><au>Alrashidi, Afaf</au><au>Rahman, Abdu R</au><au>Cheema, Salman Arif</au><au>Li, Yi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</atitle><jtitle>Measurement and control (London)</jtitle><date>2024-12-01</date><risdate>2024</risdate><volume>57</volume><issue>10</issue><spage>1480</spage><epage>1498</epage><pages>1480-1498</pages><issn>0020-2940</issn><eissn>2051-8730</eissn><abstract>The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts.</abstract><cop>London, England</cop><pub>SAGE Publications</pub><doi>10.1177/00202940241227814</doi><tpages>19</tpages><orcidid>https://orcid.org/0000-0002-3480-1485</orcidid><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0020-2940 |
ispartof | Measurement and control (London), 2024-12, Vol.57 (10), p.1480-1498 |
issn | 0020-2940 2051-8730 |
language | eng |
recordid | cdi_doaj_primary_oai_doaj_org_article_7bdb0628d99b4a2c9688b650d9931643 |
source | Sage Journals GOLD Open Access 2024; ProQuest - Publicly Available Content Database |
subjects | Control charts Control methods Error analysis Error detection Monte Carlo simulation Quality control |
title | Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T08%3A44%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_doaj_&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Novel%20combined%20Shewhart-CUmulative%20EWMA-SUM%20mean%20charts%20without-%20and%20with%20measurement%20error&rft.jtitle=Measurement%20and%20control%20(London)&rft.au=Munir,%20Tahir&rft.date=2024-12-01&rft.volume=57&rft.issue=10&rft.spage=1480&rft.epage=1498&rft.pages=1480-1498&rft.issn=0020-2940&rft.eissn=2051-8730&rft_id=info:doi/10.1177/00202940241227814&rft_dat=%3Cproquest_doaj_%3E3126550479%3C/proquest_doaj_%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=3126550479&rft_id=info:pmid/&rft_sage_id=10.1177_00202940241227814&rfr_iscdi=true |