Loading…

Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error

The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the appli...

Full description

Saved in:
Bibliographic Details
Published in:Measurement and control (London) 2024-12, Vol.57 (10), p.1480-1498
Main Authors: Munir, Tahir, Alqahtani, Fahad M., Alrashidi, Afaf, Rahman, Abdu R, Cheema, Salman Arif, Li, Yi
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3
container_end_page 1498
container_issue 10
container_start_page 1480
container_title Measurement and control (London)
container_volume 57
creator Munir, Tahir
Alqahtani, Fahad M.
Alrashidi, Afaf
Rahman, Abdu R
Cheema, Salman Arif
Li, Yi
description The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts.
doi_str_mv 10.1177/00202940241227814
format article
fullrecord <record><control><sourceid>proquest_doaj_</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_7bdb0628d99b4a2c9688b650d9931643</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.1177_00202940241227814</sage_id><doaj_id>oai_doaj_org_article_7bdb0628d99b4a2c9688b650d9931643</doaj_id><sourcerecordid>3126550479</sourcerecordid><originalsourceid>FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3</originalsourceid><addsrcrecordid>eNp1kctOwzAQRS0EElXhA9hFYu3iR2LHy6riJfFYlIoFC8txJm2qJgY7KeLvcQiCBcILW9d37pmRBqEzSmaUSnlBCCNMpYSllDGZ0_QATRjJKM4lJ4doMvh4KDhGpyFsSTy5EIKJCXp5cHvYJdY1Rd1CmSw38L4xvsOLVdPvTFfvIbl8vp_j5eo-acC0iR3skLzX3cb1HU5MW36JwQ29hwbaLgHvnT9BR5XZBTj9fqdodXX5tLjBd4_Xt4v5HbZc8g4rBgqKnCiQFRci3lWUhvIqL1VVsdIYQrlkVgleAFOW2wpMZkVJLIgU-BTdjtzSma1-9XVj_Id2ptZfH86vdRy5tjvQsigLIlgEqyI1AzLPC5GRqDkVKY-s85H16t1bD6HTW9f7No6vOWUiy0gqVayiY5X1LgQP1U9XSvSwEv1nJTEzGzPBrOGX-n_gE66CioI</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>3126550479</pqid></control><display><type>article</type><title>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</title><source>Sage Journals GOLD Open Access 2024</source><source>ProQuest - Publicly Available Content Database</source><creator>Munir, Tahir ; Alqahtani, Fahad M. ; Alrashidi, Afaf ; Rahman, Abdu R ; Cheema, Salman Arif ; Li, Yi</creator><creatorcontrib>Munir, Tahir ; Alqahtani, Fahad M. ; Alrashidi, Afaf ; Rahman, Abdu R ; Cheema, Salman Arif ; Li, Yi</creatorcontrib><description>The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts.</description><identifier>ISSN: 0020-2940</identifier><identifier>EISSN: 2051-8730</identifier><identifier>DOI: 10.1177/00202940241227814</identifier><language>eng</language><publisher>London, England: SAGE Publications</publisher><subject>Control charts ; Control methods ; Error analysis ; Error detection ; Monte Carlo simulation ; Quality control</subject><ispartof>Measurement and control (London), 2024-12, Vol.57 (10), p.1480-1498</ispartof><rights>The Author(s) 2024</rights><rights>The Author(s) 2024. This work is licensed under the Creative Commons Attribution License https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3</cites><orcidid>0000-0002-3480-1485</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://journals.sagepub.com/doi/pdf/10.1177/00202940241227814$$EPDF$$P50$$Gsage$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://www.proquest.com/docview/3126550479?pq-origsite=primo$$EHTML$$P50$$Gproquest$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,21965,25752,27852,27923,27924,37011,44589,44944,45332</link.rule.ids></links><search><creatorcontrib>Munir, Tahir</creatorcontrib><creatorcontrib>Alqahtani, Fahad M.</creatorcontrib><creatorcontrib>Alrashidi, Afaf</creatorcontrib><creatorcontrib>Rahman, Abdu R</creatorcontrib><creatorcontrib>Cheema, Salman Arif</creatorcontrib><creatorcontrib>Li, Yi</creatorcontrib><title>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</title><title>Measurement and control (London)</title><description>The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts.</description><subject>Control charts</subject><subject>Control methods</subject><subject>Error analysis</subject><subject>Error detection</subject><subject>Monte Carlo simulation</subject><subject>Quality control</subject><issn>0020-2940</issn><issn>2051-8730</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><sourceid>AFRWT</sourceid><sourceid>PIMPY</sourceid><sourceid>DOA</sourceid><recordid>eNp1kctOwzAQRS0EElXhA9hFYu3iR2LHy6riJfFYlIoFC8txJm2qJgY7KeLvcQiCBcILW9d37pmRBqEzSmaUSnlBCCNMpYSllDGZ0_QATRjJKM4lJ4doMvh4KDhGpyFsSTy5EIKJCXp5cHvYJdY1Rd1CmSw38L4xvsOLVdPvTFfvIbl8vp_j5eo-acC0iR3skLzX3cb1HU5MW36JwQ29hwbaLgHvnT9BR5XZBTj9fqdodXX5tLjBd4_Xt4v5HbZc8g4rBgqKnCiQFRci3lWUhvIqL1VVsdIYQrlkVgleAFOW2wpMZkVJLIgU-BTdjtzSma1-9XVj_Id2ptZfH86vdRy5tjvQsigLIlgEqyI1AzLPC5GRqDkVKY-s85H16t1bD6HTW9f7No6vOWUiy0gqVayiY5X1LgQP1U9XSvSwEv1nJTEzGzPBrOGX-n_gE66CioI</recordid><startdate>20241201</startdate><enddate>20241201</enddate><creator>Munir, Tahir</creator><creator>Alqahtani, Fahad M.</creator><creator>Alrashidi, Afaf</creator><creator>Rahman, Abdu R</creator><creator>Cheema, Salman Arif</creator><creator>Li, Yi</creator><general>SAGE Publications</general><general>Sage Publications Ltd</general><general>SAGE Publishing</general><scope>AFRWT</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7TB</scope><scope>8FD</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FR3</scope><scope>L7M</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>DOA</scope><orcidid>https://orcid.org/0000-0002-3480-1485</orcidid></search><sort><creationdate>20241201</creationdate><title>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</title><author>Munir, Tahir ; Alqahtani, Fahad M. ; Alrashidi, Afaf ; Rahman, Abdu R ; Cheema, Salman Arif ; Li, Yi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><topic>Control charts</topic><topic>Control methods</topic><topic>Error analysis</topic><topic>Error detection</topic><topic>Monte Carlo simulation</topic><topic>Quality control</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Munir, Tahir</creatorcontrib><creatorcontrib>Alqahtani, Fahad M.</creatorcontrib><creatorcontrib>Alrashidi, Afaf</creatorcontrib><creatorcontrib>Rahman, Abdu R</creatorcontrib><creatorcontrib>Cheema, Salman Arif</creatorcontrib><creatorcontrib>Li, Yi</creatorcontrib><collection>Sage Journals GOLD Open Access 2024</collection><collection>CrossRef</collection><collection>Electronics &amp; Communications Abstracts</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Engineering Research Database</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>ProQuest - Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Measurement and control (London)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Munir, Tahir</au><au>Alqahtani, Fahad M.</au><au>Alrashidi, Afaf</au><au>Rahman, Abdu R</au><au>Cheema, Salman Arif</au><au>Li, Yi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error</atitle><jtitle>Measurement and control (London)</jtitle><date>2024-12-01</date><risdate>2024</risdate><volume>57</volume><issue>10</issue><spage>1480</spage><epage>1498</epage><pages>1480-1498</pages><issn>0020-2940</issn><eissn>2051-8730</eissn><abstract>The precision of process monitoring often encounters challenges in determining the exact shift size. Therefore, combined control charts have gained considerable attention because of their excellent speed to detect simultaneously small-to-moderate and large-size shifts. The effectiveness of the applied quality control methods strongly depends on the performance of the measurement system. Measurement error presence contributes significantly negatively toward the performance of the usual control charting schemes. This article proposes novel two-sided combined Shewhart-Cumulative EWMA-sum (Shewhart-CUESUM) control charts designed to efficiently monitor the mean of normally distributed processes. In addition, to address measurement errors, the M-Shewhart-CUESUM chart is proposed, incorporating an additive measurement error model. Evaluation of the charts through Monte-Carlo simulations, considering metrics such as average run length (ARL), extra quadratic loss, relative ARL, and performance comparison index. It is found that the combined Shewhart-CUESUM outperforms than CUESUM chart. The results show that the presence of measurement errors can significantly diminish the charts’ performance, which can be mitigated by utilizing a multiple measurements scheme. Among the different well-established combined charts examined, the M-Shewhart-CUESUM chart shows considerably more sensitive to detecting simultaneously detect small and large size shifts. To employ simulated datasets to illustrate the impact of measurement errors and demonstrate the implications of the proposed charts on process mean shifts.</abstract><cop>London, England</cop><pub>SAGE Publications</pub><doi>10.1177/00202940241227814</doi><tpages>19</tpages><orcidid>https://orcid.org/0000-0002-3480-1485</orcidid><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0020-2940
ispartof Measurement and control (London), 2024-12, Vol.57 (10), p.1480-1498
issn 0020-2940
2051-8730
language eng
recordid cdi_doaj_primary_oai_doaj_org_article_7bdb0628d99b4a2c9688b650d9931643
source Sage Journals GOLD Open Access 2024; ProQuest - Publicly Available Content Database
subjects Control charts
Control methods
Error analysis
Error detection
Monte Carlo simulation
Quality control
title Novel combined Shewhart-CUmulative EWMA-SUM mean charts without- and with measurement error
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T08%3A44%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_doaj_&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Novel%20combined%20Shewhart-CUmulative%20EWMA-SUM%20mean%20charts%20without-%20and%20with%20measurement%20error&rft.jtitle=Measurement%20and%20control%20(London)&rft.au=Munir,%20Tahir&rft.date=2024-12-01&rft.volume=57&rft.issue=10&rft.spage=1480&rft.epage=1498&rft.pages=1480-1498&rft.issn=0020-2940&rft.eissn=2051-8730&rft_id=info:doi/10.1177/00202940241227814&rft_dat=%3Cproquest_doaj_%3E3126550479%3C/proquest_doaj_%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c373t-92e9eb809e7f366e7ffeb8a13f8d9ff2daa01372c963be29c3cfea5c6d0ce64e3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=3126550479&rft_id=info:pmid/&rft_sage_id=10.1177_00202940241227814&rfr_iscdi=true