Loading…

Production planning and scheduling with material handling using modelling and simulation

Increase flexibility of manufacturing requires implementation of effective planning IT tools. Planning and scheduling problems traditionally consider the production resources as the only constraints. Since the raw material and intermediate transferring times are relevant in relation to the productio...

Full description

Saved in:
Bibliographic Details
Main Authors: Krenczyk, Damian, Kempa, Wojciech M., Kalinowski, Krzysztof, Grabowik, Cezary, Paprocka, Iwona
Format: Conference Proceeding
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Increase flexibility of manufacturing requires implementation of effective planning IT tools. Planning and scheduling problems traditionally consider the production resources as the only constraints. Since the raw material and intermediate transferring times are relevant in relation to the production times, it is required to model the material handling equipment and its activities. The problem of scheduling subject to manufacturing and logistical constraints based on data-driven models generation method is presented. A KbRS and FlexSim systems are used as a scheduling tool.
ISSN:2261-236X
2274-7214
2261-236X
DOI:10.1051/matecconf/201711209015