Loading…
Track-quality index and degradation of railway track structure: The construction track doubling project of northeast line from thanon chira junction to khon kaen station, Thailand
In the past, the railway network has not been developed, and new construction added has been mostly degraded caused by long useful life, and lack of maintenance due to a budget constraint. Currently, 93% of railway in Thailand is single track which results in delays due to low capacity and low avera...
Saved in:
Published in: | MATEC web of conferences 2018-01, Vol.192, p.2022 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In the past, the railway network has not been developed, and new construction added has been
mostly degraded caused by long useful life, and lack of maintenance due to a budget constraint. Currently,
93% of railway in Thailand is single track which results in delays due to low capacity and low average speeds,
delayed train on a single track will also delay the train passing it. In some areas of the network, the amount
of travel and transportation exceeds the capacity received, so delays in travel and transportation is quite high.
Due to this above reason, the service of railway is not effective in terms of convenience and speed of service.
Punctuality and cost is high compared with road transport. The biggest challenge that railways faces is the
insufficient number of tracks and outdated or old trains. Most the trains cannot travel at their optimum speed
because they do not get clearances on time. Thai government has a policy to develop railway track network
and services to improve transportation efficiency and save fuel energy used in the transportation sector of the
country. Thus, it is necessary to develop the rail transportation system from the existing network as a single
track to the current double track network. This study focuses on investigating the degradation of the existing
railway structure during the construction track doubling Project. Data were inspected by Track Inspection Car
EM120N before the commencement of construction for analysing the condition with the Track Quality Index
/ TQI) in order to predict the degradation of the railway to plan maintenance and further renewal of the
railway. The study found that the TQI value of the existing track structure during the two years of the doubling
track construction (2017-2018) has changed significantly. |
---|---|
ISSN: | 2261-236X 2274-7214 2261-236X |
DOI: | 10.1051/matecconf/201819202022 |