Loading…

Diversion Canal to Decrease Flooding (Case Study : Kebon Jati-Kalibata Segment, Ciliwung River Basin)

The flood in Jakarta has become a national concern in Indonesia. It is a haunting disaster, with a high probability to happen when heavy rainfalls in Jakarta and/or its upstream area. Based on data that was provided by Public Work Agency of DKI Jakarta, there are 78 vulnerable points of inundation i...

Full description

Saved in:
Bibliographic Details
Main Authors: Indrawati, Dian, Hadihardaja, Iwan K., Bagus Adityawan, M., Pahrizal, Syambali F., Taufik, Fajar
Format: Conference Proceeding
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The flood in Jakarta has become a national concern in Indonesia. It is a haunting disaster, with a high probability to happen when heavy rainfalls in Jakarta and/or its upstream area. Based on data that was provided by Public Work Agency of DKI Jakarta, there are 78 vulnerable points of inundation in which, most of them are located in Ciliwung river basin, commonly in the meandering segments. One of the worst flooding occurs in Pancoran, at Kebonjati to Kalibata segment in particular. The river discharge in this segment is much higher as compared to the carrying capacity. In addition, this area has a high density of population and thus, difficult to increase the *river capacity* by enlarging the river dimension. In this research, a closed diversion canal is proposed as a solution. The effectiveness of the solution is evaluated using a numerical model, HEC-RAS 4.1. The diversion canal is designed as two culverts, with 2.0 m in diameter. Nevertheless, hydraulic jump may occur at the outlet of the canal due to the relatively steep slope. Therefore, the canal outlet should be designed accordingly. A Hydraulic structure such as a stilling basin can be employed to reduce the energy. The results show that the diversion canal has a good performance in decreasing water level and flood discharge in the study area. The canal has the capacity of 17,72 m3/sec and succesfully decreases the water level by 4.71 – 5.66 m from flood level for 2 – 100 years returned period.
ISSN:2261-236X
2274-7214
2261-236X
DOI:10.1051/matecconf/201814703006