Loading…

The effect of artificial support material existence on removal of organic and nutrient in laboratory scale using plug flow reactor (PFR)

Artificial support material was examined to determine the removal capacity of organic pollutants and nutrients on laboratory scale using PFR system. The experiment was performed using artificial water with similar characteristics to Cikapayang River in three PFRs of 10.78 L. The PFRs were made of PV...

Full description

Saved in:
Bibliographic Details
Published in:E3S web of conferences 2020-01, Vol.148, p.1003
Main Authors: Aphirta, Sarah, Soewondo, Prayatni, Maisa Zakiyya, Nida, Wulandari Putri, Dyah, Setiani Muntalif, Barti
Format: Article
Language:English
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c2273-f0218bfcc0550c1f967697686a2ad1df81b4a8c53b064dd86aa1a19516cd9f0b3
container_end_page
container_issue
container_start_page 1003
container_title E3S web of conferences
container_volume 148
creator Aphirta, Sarah
Soewondo, Prayatni
Maisa Zakiyya, Nida
Wulandari Putri, Dyah
Setiani Muntalif, Barti
description Artificial support material was examined to determine the removal capacity of organic pollutants and nutrients on laboratory scale using PFR system. The experiment was performed using artificial water with similar characteristics to Cikapayang River in three PFRs of 10.78 L. The PFRs were made of PVC pipes filled with an inert chemical substrate as an artificial support material. The process of pollutants removal in the PFR relies on a biological layer (biofilm) grown on the surface of the material support. Three type of C:N:P ratio used in this study were 30:15:1, 75:25:2, and 180:35:3. The results showed that the maximum removal efficiency of TSS, TN, TP, and COD in the preliminary tests were 85%, 87%, 71% and 79%, respectively. Moreover, the maximum water absorption capacity result was up to 30.8%. Organic substrate removal rate compared with first order and Strover-Kincannon substrate removal models prediction. The best fit model for this experiment was Stover-Kincannon model, with the average correlation coefficient up to 90% for all of the three reactors. SEM analysis shown that the microorganisms shape is coccus with the average size of 5 µm.
doi_str_mv 10.1051/e3sconf/202014801003
format article
fullrecord <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_a5023c79f34b42dfbabc64ee5e9ffc5f</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_a5023c79f34b42dfbabc64ee5e9ffc5f</doaj_id><sourcerecordid>oai_doaj_org_article_a5023c79f34b42dfbabc64ee5e9ffc5f</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2273-f0218bfcc0550c1f967697686a2ad1df81b4a8c53b064dd86aa1a19516cd9f0b3</originalsourceid><addsrcrecordid>eNpNkc9qHDEMh4eSQEKyb5CDj-1hE9ljz59jWZomsNBQNudBo5G2DrP2Ys-2zRv0sTObhJKTxCf0gfQriisN1xqcvuEyUwxyY8CAtg1ogPJTcW5MVS-1sebkQ39WLHJ-AgBtXGPBnhf_Nr9YsQjTpKIoTJMXTx5HlQ_7fUyT2uHE6Qj4r88TB2IVg0q8i79nOO_EtMXgSWEYVDhMyXOYlA9qxD4mnGJ6VplwZHXIPmzVfjxslYzxz-xAmsfq88Ptzy-XxangmHnxXi-Kx9tvm9Xdcv3j-_3q63pJxtTlUsDophcicA5IS1vVVVtXTYUGBz1Io3uLDbmyh8oOw8xRo26drmhoBfryorh_8w4Rn7p98jtMz11E372C-Zju-AQauUMHpqS6ldL21gzSY0-VZXbcipCT2WXfXJRizonlv09Ddwynew-n-xhO-QK8TYZ0</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>The effect of artificial support material existence on removal of organic and nutrient in laboratory scale using plug flow reactor (PFR)</title><source>Publicly Available Content (ProQuest)</source><creator>Aphirta, Sarah ; Soewondo, Prayatni ; Maisa Zakiyya, Nida ; Wulandari Putri, Dyah ; Setiani Muntalif, Barti</creator><contributor>Sonny Abfertiawan, M. ; Roosmini, D. ; Soleh Setiyawan, A. ; Dwi Ariesyady, H. ; Nastiti, A.</contributor><creatorcontrib>Aphirta, Sarah ; Soewondo, Prayatni ; Maisa Zakiyya, Nida ; Wulandari Putri, Dyah ; Setiani Muntalif, Barti ; Sonny Abfertiawan, M. ; Roosmini, D. ; Soleh Setiyawan, A. ; Dwi Ariesyady, H. ; Nastiti, A.</creatorcontrib><description>Artificial support material was examined to determine the removal capacity of organic pollutants and nutrients on laboratory scale using PFR system. The experiment was performed using artificial water with similar characteristics to Cikapayang River in three PFRs of 10.78 L. The PFRs were made of PVC pipes filled with an inert chemical substrate as an artificial support material. The process of pollutants removal in the PFR relies on a biological layer (biofilm) grown on the surface of the material support. Three type of C:N:P ratio used in this study were 30:15:1, 75:25:2, and 180:35:3. The results showed that the maximum removal efficiency of TSS, TN, TP, and COD in the preliminary tests were 85%, 87%, 71% and 79%, respectively. Moreover, the maximum water absorption capacity result was up to 30.8%. Organic substrate removal rate compared with first order and Strover-Kincannon substrate removal models prediction. The best fit model for this experiment was Stover-Kincannon model, with the average correlation coefficient up to 90% for all of the three reactors. SEM analysis shown that the microorganisms shape is coccus with the average size of 5 µm.</description><identifier>ISSN: 2267-1242</identifier><identifier>EISSN: 2267-1242</identifier><identifier>DOI: 10.1051/e3sconf/202014801003</identifier><language>eng</language><publisher>EDP Sciences</publisher><ispartof>E3S web of conferences, 2020-01, Vol.148, p.1003</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c2273-f0218bfcc0550c1f967697686a2ad1df81b4a8c53b064dd86aa1a19516cd9f0b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><contributor>Sonny Abfertiawan, M.</contributor><contributor>Roosmini, D.</contributor><contributor>Soleh Setiyawan, A.</contributor><contributor>Dwi Ariesyady, H.</contributor><contributor>Nastiti, A.</contributor><creatorcontrib>Aphirta, Sarah</creatorcontrib><creatorcontrib>Soewondo, Prayatni</creatorcontrib><creatorcontrib>Maisa Zakiyya, Nida</creatorcontrib><creatorcontrib>Wulandari Putri, Dyah</creatorcontrib><creatorcontrib>Setiani Muntalif, Barti</creatorcontrib><title>The effect of artificial support material existence on removal of organic and nutrient in laboratory scale using plug flow reactor (PFR)</title><title>E3S web of conferences</title><description>Artificial support material was examined to determine the removal capacity of organic pollutants and nutrients on laboratory scale using PFR system. The experiment was performed using artificial water with similar characteristics to Cikapayang River in three PFRs of 10.78 L. The PFRs were made of PVC pipes filled with an inert chemical substrate as an artificial support material. The process of pollutants removal in the PFR relies on a biological layer (biofilm) grown on the surface of the material support. Three type of C:N:P ratio used in this study were 30:15:1, 75:25:2, and 180:35:3. The results showed that the maximum removal efficiency of TSS, TN, TP, and COD in the preliminary tests were 85%, 87%, 71% and 79%, respectively. Moreover, the maximum water absorption capacity result was up to 30.8%. Organic substrate removal rate compared with first order and Strover-Kincannon substrate removal models prediction. The best fit model for this experiment was Stover-Kincannon model, with the average correlation coefficient up to 90% for all of the three reactors. SEM analysis shown that the microorganisms shape is coccus with the average size of 5 µm.</description><issn>2267-1242</issn><issn>2267-1242</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpNkc9qHDEMh4eSQEKyb5CDj-1hE9ljz59jWZomsNBQNudBo5G2DrP2Ys-2zRv0sTObhJKTxCf0gfQriisN1xqcvuEyUwxyY8CAtg1ogPJTcW5MVS-1sebkQ39WLHJ-AgBtXGPBnhf_Nr9YsQjTpKIoTJMXTx5HlQ_7fUyT2uHE6Qj4r88TB2IVg0q8i79nOO_EtMXgSWEYVDhMyXOYlA9qxD4mnGJ6VplwZHXIPmzVfjxslYzxz-xAmsfq88Ptzy-XxangmHnxXi-Kx9tvm9Xdcv3j-_3q63pJxtTlUsDophcicA5IS1vVVVtXTYUGBz1Io3uLDbmyh8oOw8xRo26drmhoBfryorh_8w4Rn7p98jtMz11E372C-Zju-AQauUMHpqS6ldL21gzSY0-VZXbcipCT2WXfXJRizonlv09Ddwynew-n-xhO-QK8TYZ0</recordid><startdate>20200101</startdate><enddate>20200101</enddate><creator>Aphirta, Sarah</creator><creator>Soewondo, Prayatni</creator><creator>Maisa Zakiyya, Nida</creator><creator>Wulandari Putri, Dyah</creator><creator>Setiani Muntalif, Barti</creator><general>EDP Sciences</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope></search><sort><creationdate>20200101</creationdate><title>The effect of artificial support material existence on removal of organic and nutrient in laboratory scale using plug flow reactor (PFR)</title><author>Aphirta, Sarah ; Soewondo, Prayatni ; Maisa Zakiyya, Nida ; Wulandari Putri, Dyah ; Setiani Muntalif, Barti</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2273-f0218bfcc0550c1f967697686a2ad1df81b4a8c53b064dd86aa1a19516cd9f0b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Aphirta, Sarah</creatorcontrib><creatorcontrib>Soewondo, Prayatni</creatorcontrib><creatorcontrib>Maisa Zakiyya, Nida</creatorcontrib><creatorcontrib>Wulandari Putri, Dyah</creatorcontrib><creatorcontrib>Setiani Muntalif, Barti</creatorcontrib><collection>CrossRef</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>E3S web of conferences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Aphirta, Sarah</au><au>Soewondo, Prayatni</au><au>Maisa Zakiyya, Nida</au><au>Wulandari Putri, Dyah</au><au>Setiani Muntalif, Barti</au><au>Sonny Abfertiawan, M.</au><au>Roosmini, D.</au><au>Soleh Setiyawan, A.</au><au>Dwi Ariesyady, H.</au><au>Nastiti, A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The effect of artificial support material existence on removal of organic and nutrient in laboratory scale using plug flow reactor (PFR)</atitle><jtitle>E3S web of conferences</jtitle><date>2020-01-01</date><risdate>2020</risdate><volume>148</volume><spage>1003</spage><pages>1003-</pages><issn>2267-1242</issn><eissn>2267-1242</eissn><abstract>Artificial support material was examined to determine the removal capacity of organic pollutants and nutrients on laboratory scale using PFR system. The experiment was performed using artificial water with similar characteristics to Cikapayang River in three PFRs of 10.78 L. The PFRs were made of PVC pipes filled with an inert chemical substrate as an artificial support material. The process of pollutants removal in the PFR relies on a biological layer (biofilm) grown on the surface of the material support. Three type of C:N:P ratio used in this study were 30:15:1, 75:25:2, and 180:35:3. The results showed that the maximum removal efficiency of TSS, TN, TP, and COD in the preliminary tests were 85%, 87%, 71% and 79%, respectively. Moreover, the maximum water absorption capacity result was up to 30.8%. Organic substrate removal rate compared with first order and Strover-Kincannon substrate removal models prediction. The best fit model for this experiment was Stover-Kincannon model, with the average correlation coefficient up to 90% for all of the three reactors. SEM analysis shown that the microorganisms shape is coccus with the average size of 5 µm.</abstract><pub>EDP Sciences</pub><doi>10.1051/e3sconf/202014801003</doi><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2267-1242
ispartof E3S web of conferences, 2020-01, Vol.148, p.1003
issn 2267-1242
2267-1242
language eng
recordid cdi_doaj_primary_oai_doaj_org_article_a5023c79f34b42dfbabc64ee5e9ffc5f
source Publicly Available Content (ProQuest)
title The effect of artificial support material existence on removal of organic and nutrient in laboratory scale using plug flow reactor (PFR)
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T18%3A22%3A55IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20effect%20of%20artificial%20support%20material%20existence%20on%20removal%20of%20organic%20and%20nutrient%20in%20laboratory%20scale%20using%20plug%20flow%20reactor%20(PFR)&rft.jtitle=E3S%20web%20of%20conferences&rft.au=Aphirta,%20Sarah&rft.date=2020-01-01&rft.volume=148&rft.spage=1003&rft.pages=1003-&rft.issn=2267-1242&rft.eissn=2267-1242&rft_id=info:doi/10.1051/e3sconf/202014801003&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_a5023c79f34b42dfbabc64ee5e9ffc5f%3C/doaj_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c2273-f0218bfcc0550c1f967697686a2ad1df81b4a8c53b064dd86aa1a19516cd9f0b3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true