Loading…

Partial flexible job shop scheduling considering preventive maintenance and priorities

In this paper, a new mathematical programming model is proposed for a partial flexible job shop scheduling problem with an integrated solution approach. The purpose of this model is the assignment of production operations to machines with the goal of simultaneously minimizing operating costs and pen...

Full description

Saved in:
Bibliographic Details
Published in:Working papers on operations management 2020-12, Vol.11 (2), p.27-48
Main Authors: Farahani, Ameneh, Tohidi, Hamid, Khalaj, Mehran, Shoja, Ahmad
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites cdi_FETCH-LOGICAL-c234t-f0f403ed90fe503c3df12ea5f7b78639a96a398fe07e71e00e2c73df20879ef23
container_end_page 48
container_issue 2
container_start_page 27
container_title Working papers on operations management
container_volume 11
creator Farahani, Ameneh
Tohidi, Hamid
Khalaj, Mehran
Shoja, Ahmad
description In this paper, a new mathematical programming model is proposed for a partial flexible job shop scheduling problem with an integrated solution approach. The purpose of this model is the assignment of production operations to machines with the goal of simultaneously minimizing operating costs and penalties. These penalties include delayed delivery, deviation from a fixed time point for preventive maintenance, and deviation from the priorities of each machine. Considering the priorities for machines in partial flexible job shop scheduling problems can be a contribution in closer to the reality of production systems. For validation and evaluation of the effectiveness of the model, several numerical examples are solved by using the Baron solver in GAMS. Sensitivity analysis is performed for the model parameters. The results further indicate the relationship between scheduling according to priorities of each machine and production scheduling.
doi_str_mv 10.4995/wpom.v11i2.14187
format article
fullrecord <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_doaj_primary_oai_doaj_org_article_ab028a0a06094d04ba284613289ca3ec</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_ab028a0a06094d04ba284613289ca3ec</doaj_id><sourcerecordid>oai_doaj_org_article_ab028a0a06094d04ba284613289ca3ec</sourcerecordid><originalsourceid>FETCH-LOGICAL-c234t-f0f403ed90fe503c3df12ea5f7b78639a96a398fe07e71e00e2c73df20879ef23</originalsourceid><addsrcrecordid>eNpNkEtPwzAMgCMEEtPYnWP_QIeT9JEc0cRLmgQH4Bq5qbNl6popKQP-Pd2GEL7Ysq3P8sfYNYd5oXV587kL2_mecy_mvOCqPmMTrpXONVTq_F99yWYpbWAMxUvO5YS9v2AcPHaZ6-jLNx1lm9BkaR12WbJraj86368yG_rkW4qHehdpT_3g95Rt0fcD9dhbyrBvx5EP0Q-e0hW7cNglmv3mKXu7v3tdPObL54enxe0yt0IWQ-7AFSCp1eCoBGll67ggLF3d1KqSGnWFUitHUFPNCYCErcclAarW5IScsqcTtw24MeP9LcZvE9CbYyPElTn8Zzsy2IBQCAgV6KKFokGhiopLobRFSXZkwYllY0gpkvvjcTAHzeag2Rw1m6Nm-QOARnOH</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Partial flexible job shop scheduling considering preventive maintenance and priorities</title><source>Publicly Available Content Database</source><source>ABI/INFORM Global</source><source>Business Source Ultimate (EBSCOHost)</source><creator>Farahani, Ameneh ; Tohidi, Hamid ; Khalaj, Mehran ; Shoja, Ahmad</creator><creatorcontrib>Farahani, Ameneh ; Tohidi, Hamid ; Khalaj, Mehran ; Shoja, Ahmad</creatorcontrib><description>In this paper, a new mathematical programming model is proposed for a partial flexible job shop scheduling problem with an integrated solution approach. The purpose of this model is the assignment of production operations to machines with the goal of simultaneously minimizing operating costs and penalties. These penalties include delayed delivery, deviation from a fixed time point for preventive maintenance, and deviation from the priorities of each machine. Considering the priorities for machines in partial flexible job shop scheduling problems can be a contribution in closer to the reality of production systems. For validation and evaluation of the effectiveness of the model, several numerical examples are solved by using the Baron solver in GAMS. Sensitivity analysis is performed for the model parameters. The results further indicate the relationship between scheduling according to priorities of each machine and production scheduling.</description><identifier>ISSN: 1989-9068</identifier><identifier>EISSN: 1989-9068</identifier><identifier>DOI: 10.4995/wpom.v11i2.14187</identifier><language>eng</language><publisher>Universitat Politècnica de València</publisher><subject>flexible job shop ; preventive maintenance ; priorities ; scheduling</subject><ispartof>Working papers on operations management, 2020-12, Vol.11 (2), p.27-48</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c234t-f0f403ed90fe503c3df12ea5f7b78639a96a398fe07e71e00e2c73df20879ef23</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27903,27904</link.rule.ids></links><search><creatorcontrib>Farahani, Ameneh</creatorcontrib><creatorcontrib>Tohidi, Hamid</creatorcontrib><creatorcontrib>Khalaj, Mehran</creatorcontrib><creatorcontrib>Shoja, Ahmad</creatorcontrib><title>Partial flexible job shop scheduling considering preventive maintenance and priorities</title><title>Working papers on operations management</title><description>In this paper, a new mathematical programming model is proposed for a partial flexible job shop scheduling problem with an integrated solution approach. The purpose of this model is the assignment of production operations to machines with the goal of simultaneously minimizing operating costs and penalties. These penalties include delayed delivery, deviation from a fixed time point for preventive maintenance, and deviation from the priorities of each machine. Considering the priorities for machines in partial flexible job shop scheduling problems can be a contribution in closer to the reality of production systems. For validation and evaluation of the effectiveness of the model, several numerical examples are solved by using the Baron solver in GAMS. Sensitivity analysis is performed for the model parameters. The results further indicate the relationship between scheduling according to priorities of each machine and production scheduling.</description><subject>flexible job shop</subject><subject>preventive maintenance</subject><subject>priorities</subject><subject>scheduling</subject><issn>1989-9068</issn><issn>1989-9068</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpNkEtPwzAMgCMEEtPYnWP_QIeT9JEc0cRLmgQH4Bq5qbNl6popKQP-Pd2GEL7Ysq3P8sfYNYd5oXV587kL2_mecy_mvOCqPmMTrpXONVTq_F99yWYpbWAMxUvO5YS9v2AcPHaZ6-jLNx1lm9BkaR12WbJraj86368yG_rkW4qHehdpT_3g95Rt0fcD9dhbyrBvx5EP0Q-e0hW7cNglmv3mKXu7v3tdPObL54enxe0yt0IWQ-7AFSCp1eCoBGll67ggLF3d1KqSGnWFUitHUFPNCYCErcclAarW5IScsqcTtw24MeP9LcZvE9CbYyPElTn8Zzsy2IBQCAgV6KKFokGhiopLobRFSXZkwYllY0gpkvvjcTAHzeag2Rw1m6Nm-QOARnOH</recordid><startdate>20201218</startdate><enddate>20201218</enddate><creator>Farahani, Ameneh</creator><creator>Tohidi, Hamid</creator><creator>Khalaj, Mehran</creator><creator>Shoja, Ahmad</creator><general>Universitat Politècnica de València</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope></search><sort><creationdate>20201218</creationdate><title>Partial flexible job shop scheduling considering preventive maintenance and priorities</title><author>Farahani, Ameneh ; Tohidi, Hamid ; Khalaj, Mehran ; Shoja, Ahmad</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c234t-f0f403ed90fe503c3df12ea5f7b78639a96a398fe07e71e00e2c73df20879ef23</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><topic>flexible job shop</topic><topic>preventive maintenance</topic><topic>priorities</topic><topic>scheduling</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Farahani, Ameneh</creatorcontrib><creatorcontrib>Tohidi, Hamid</creatorcontrib><creatorcontrib>Khalaj, Mehran</creatorcontrib><creatorcontrib>Shoja, Ahmad</creatorcontrib><collection>CrossRef</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Working papers on operations management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Farahani, Ameneh</au><au>Tohidi, Hamid</au><au>Khalaj, Mehran</au><au>Shoja, Ahmad</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Partial flexible job shop scheduling considering preventive maintenance and priorities</atitle><jtitle>Working papers on operations management</jtitle><date>2020-12-18</date><risdate>2020</risdate><volume>11</volume><issue>2</issue><spage>27</spage><epage>48</epage><pages>27-48</pages><issn>1989-9068</issn><eissn>1989-9068</eissn><abstract>In this paper, a new mathematical programming model is proposed for a partial flexible job shop scheduling problem with an integrated solution approach. The purpose of this model is the assignment of production operations to machines with the goal of simultaneously minimizing operating costs and penalties. These penalties include delayed delivery, deviation from a fixed time point for preventive maintenance, and deviation from the priorities of each machine. Considering the priorities for machines in partial flexible job shop scheduling problems can be a contribution in closer to the reality of production systems. For validation and evaluation of the effectiveness of the model, several numerical examples are solved by using the Baron solver in GAMS. Sensitivity analysis is performed for the model parameters. The results further indicate the relationship between scheduling according to priorities of each machine and production scheduling.</abstract><pub>Universitat Politècnica de València</pub><doi>10.4995/wpom.v11i2.14187</doi><tpages>22</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 1989-9068
ispartof Working papers on operations management, 2020-12, Vol.11 (2), p.27-48
issn 1989-9068
1989-9068
language eng
recordid cdi_doaj_primary_oai_doaj_org_article_ab028a0a06094d04ba284613289ca3ec
source Publicly Available Content Database; ABI/INFORM Global; Business Source Ultimate (EBSCOHost)
subjects flexible job shop
preventive maintenance
priorities
scheduling
title Partial flexible job shop scheduling considering preventive maintenance and priorities
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T18%3A55%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Partial%20flexible%20job%20shop%20scheduling%20considering%20preventive%20maintenance%20and%20priorities&rft.jtitle=Working%20papers%20on%20operations%20management&rft.au=Farahani,%20Ameneh&rft.date=2020-12-18&rft.volume=11&rft.issue=2&rft.spage=27&rft.epage=48&rft.pages=27-48&rft.issn=1989-9068&rft.eissn=1989-9068&rft_id=info:doi/10.4995/wpom.v11i2.14187&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_ab028a0a06094d04ba284613289ca3ec%3C/doaj_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c234t-f0f403ed90fe503c3df12ea5f7b78639a96a398fe07e71e00e2c73df20879ef23%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true