Loading…
Forecasting product sales with a stochastic Bass model
With the Bass model and data of previous sales a point estimate of future sales can be made for the purpose of stock management. In order to obtain information about the accuracy of that estimate a confidence interval can be of use. In this study such an interval is constructed from a Bass model ext...
Saved in:
Published in: | Journal of mathematics in industry 2019-02, Vol.9 (1), p.1-10, Article 2 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | With the Bass model and data of previous sales a point estimate of future sales can be made for the purpose of stock management. In order to obtain information about the accuracy of that estimate a confidence interval can be of use. In this study such an interval is constructed from a Bass model extended with a noise term. The size of the noise is assumed to be proportional with the yearly sales. It is also assumed that the deviation from the deterministic solution is sufficiently small to make a small noise approximation. This perturbation takes the form of a time dependent Ornstein–Uhlenbeck process. For the variance of the perturbation an exact expression can be given which is needed in order to obtain confidence intervals. |
---|---|
ISSN: | 2190-5983 2190-5983 |
DOI: | 10.1186/s13362-019-0059-6 |