Loading…

Solving the problem of switching from one track gauge to another in the context of the requirements of interoperability specifications for classical infrastructure

The article discusses issues related to solving the problem of switching from one gauge to another. A progressive solution to the problem of different track gauges is the use of a combined gauge design. The combined track solves the problems of overloading, downtime, and wheel set problems. The desi...

Full description

Saved in:
Bibliographic Details
Published in:MATEC web of conferences 2024, Vol.390, p.2010
Main Authors: Arbuzov, Maxim, Andrieiev, Volodymyr, Kosturechko, Stanislav
Format: Article
Language:English
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The article discusses issues related to solving the problem of switching from one gauge to another. A progressive solution to the problem of different track gauges is the use of a combined gauge design. The combined track solves the problems of overloading, downtime, and wheel set problems. The design of the combined gauge has set new challenges for track infrastructure workers and scientists. The first task is the strength of the combined track structure. The second task is the stability of the combined track plates. The third task is to lay switches in the combined track and determine the permissible train speeds.
ISSN:2261-236X
2261-236X
DOI:10.1051/matecconf/202439002010