Concurrent operation of 10 gyrotrons at W7-X experience and improvement opportunities
At the stellarator Wendelstein 7-X (W7-X) Electron Cyclotron Resonance Heating (ECRH) is the main heating system for steady-state operation and was the only available heating system during the operation phase OP1.2a in 2017. The ECRH, equipped with 10 operational 140 GHz gyrotrons [1], was used for...
Saved in:
Main Authors: | , , , , , , , , , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | At the stellarator Wendelstein 7-X (W7-X) Electron Cyclotron Resonance Heating (ECRH) is the main heating system for steady-state operation and was the only available heating system during the operation phase OP1.2a in 2017. The ECRH, equipped with 10 operational 140 GHz gyrotrons [1], was used for different tasks at W7-X such as wall conditioning, controlled plasma start-up from the neutral gas up to steady state plasma control and different heating scenarios such as X2-mode and O2-mode heating as well as current drive (ECCD). The operational experiences and improvement opportunities of the ECRH plant will be discussed. |
---|---|
ISSN: | 2100-014X 2101-6275 2100-014X |
DOI: | 10.1051/epjconf/201818701003 |